Wage Determination CA20260020-16270-bld

Kern, CA · building · Rev. 3 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination CA20260020-16270-bld covers 138 trade classifications for building construction in Kern, CA. Total packages (base + fringe) range from $32.72/hr to $116.01/hr, with the highest going to DIVER (WET). Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: CA20260020-16270-bld
Revision: 3
Type: building
County: Kern
State: CA
Effective: May 17, 2026
Trades covered: 138
Highest rate: $116.01/hr
Official source: SAM.gov reference CA20260020View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ABOVE THE 75'-0"" LEVEL SHALL BE COMPENSATED FOR AT 35 CENTS PER HOUR ABOVE THE APPLICABLE CLASSIFICATION WAGE RATE $55.88 $23.77 $79.65 $0.00 $0.00 $0.00 $0.00
ASBESTOS REMOVAL LABORER SCOPE OF WORK: INCLUDES SITE MOBILIZATION, INITIAL SITE CLEANUP, SITE PREPARATION, REMOVAL OF ASBESTOS-CONTAINING MATERIAL AN $46.48 $25.93 $72.41 $0.00 $0.00 $0.00 $0.00
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF $23.52 $13.37 $36.89 $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANI $64.56 $25.07 $89.63 $0.00 $0.00 $0.00 $0.00
BOILERMAKER $51.98 $42.11 $94.09 $0.00 $0.00 $0.00 $0.00
BOILERMAKER $45.60 $38.99 $84.59 $0.00 $0.00 $0.00 $0.00
BRICK TENDER $42.60 $22.13 $64.73 $0.00 $0.00 $0.00 $0.00
BRICKLAYER; MARBLE SETTER *THE WAGE SCALE FOR PREVAILING WAGE PROJECTS PERFORMED IN BLYTHE, CHINA LAKE, DEATH VALLEY, FORT IRWIN, TWENTY-NINE PALMS, N $45.53 $20.29 $65.82 $0.00 $0.00 $0.00 $0.00
CABLE SPLICER $71.07 $22.32 $93.39 $0.00 $0.00 $0.00 $0.00
CABLE SPLICER $62.32 $22.06 $84.38 $0.00 $0.00 $0.00 $0.00
CARPENTER: CARPENTER, CABINET INSTALLER, INSULATION INSTALLER, FLOOR WORKER AND ACOUSTICAL INSTALLER FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF $51.03 $16.28 $67.31 $0.00 $0.00 $0.00 $0.00
CARPENTER: MILLWRIGHT FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGING IS U $52.10 $16.48 $68.58 $0.00 $0.00 $0.00 $0.00
CARPENTER: PILEDRIVERMEN; DERRICK BARGE; BRIDGE OR DOCK CARPENTER; HEAVY FRAMER; ROCKSLINGER; ROCK BARGEMAN; SCOWMAN FOOTNOTE: WORK OF FORMING IN THE $51.73 $16.28 $68.01 $0.00 $0.00 $0.00 $0.00
CARPENTER: PNEUMATIC NAILER OR POWER STAPLER FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH $51.29 $16.28 $67.57 $0.00 $0.00 $0.00 $0.00
CARPENTER: ROOF LOADER OF SHINGLES (COMMERCIAL FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHIC $38.92 $16.28 $55.20 $0.00 $0.00 $0.00 $0.00
CARPENTER: SAW FILER FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGING IS US $51.03 $16.28 $67.31 $0.00 $0.00 $0.00 $0.00
CARPENTER: SCAFFOLD BUILDER FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGIN $42.80 $16.28 $59.08 $0.00 $0.00 $0.00 $0.00
CARPENTER: SHINGLER FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGING IS USE $51.17 $16.28 $67.45 $0.00 $0.00 $0.00 $0.00
CARPENTER: TABLE POWER SAW OPERATOR $52.13 $16.28 $68.41 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $47.70 $27.07 $74.77 $0.00 $0.00 $0.00 $0.00
CENTS PER HOUR ABOVE THE APPLICABLE CLASSIFICATION WAGE RATE $51.39 $23.77 $75.16 $0.00 $0.00 $0.00 $0.00
CENTS PER HOUR ABOVE THE APPLICABLE CLASSIFICATION WAGE RATE $54.93 $23.77 $78.70 $0.00 $0.00 $0.00 $0.00
CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR. OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 25- CONCRETE PUMP OPERATOR-TRUCK MOUNTED; RUBBER-TIRE $67.91 $33.20 $101.11 $0.00 $0.00 $0.00 $0.00
COMMUNICATIONS SYSTEM: INSTALLER COMMUNICATIONS AND SYSTEMS WORK SCOPE OF WORK: INSTALLATION, TESTING, SERVICE AND MAINTENANCE OF SYSTEMS UTILIZING TH $46.26 $21.03 $67.29 $0.00 $0.00 $0.00 $0.00
COMMUNICATIONS SYSTEM: INSTALLER COMMUNICATIONS AND SYSTEMS WORK SCOPE OF WORK: INSTALLATION, TESTING, SERVICE AND MAINTENANCE OF SYSTEMS UTILIZING TH $52.39 $21.21 $73.60 $0.00 $0.00 $0.00 $0.00
COMMUNICATIONS SYSTEM: INSTALLER COMMUNICATIONS AND SYSTEMS WORK SCOPE OF WORK: INSTALLATION, TESTING, SERVICE AND MAINTENANCE OF SYSTEMS UTILIZING TH $55.90 $21.32 $77.22 $0.00 $0.00 $0.00 $0.00
DIVER (ASSISTANT TENDER) $52.37 $3.27 $55.64 $0.00 $0.00 $0.00 $0.00
DIVER (STANDBY) $56.37 $3.27 $59.64 $0.00 $0.00 $0.00 $0.00
DIVER (TENDER) $55.37 $3.27 $58.64 $0.00 $0.00 $0.00 $0.00
DIVER (WET) $112.74 $3.27 $116.01 $0.00 $0.00 $0.00 $0.00
DRYWALL $21.45 $11.27 $32.72 $0.00 $0.00 $0.00 $0.00
DRYWALL $52.24 $26.18 $78.42 $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $45.20 $26.82 $72.02 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $65.40 $22.15 $87.55 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN CABLE SPLICER: $1.50 ABOVE ELECTRICIAN. TUNNEL WORK: 10% ABOVE ELECTRICIAN. ZONE PAY: ZONE A - 80 ROAD MILES FROM POST OFFICE, 455 ORANGE $53.15 $29.07 $82.22 $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC FOOTNOTE: A. PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEA $69.43 $38.44 $107.87 $0.00 $0.00 $0.00 $0.00
EQUIPMENT OPERATOR, TOWER CRANE REPAIRMAN; TRACTOR LOADER OPERATOR; WOODS MIXER OPERATOR PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIP $66.41 $33.20 $99.61 $0.00 $0.00 $0.00 $0.00
FIRE STOP TECHNICIAN: APPLICATION OF FIRESTOPPING MATERIALS FOR WALL OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS $39.94 $20.65 $60.59 $0.00 $0.00 $0.00 $0.00
GLAZIER $44.33 $28.88 $73.21 $0.00 $0.00 $0.00 $0.00
HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEEL $67.18 $33.20 $100.38 $0.00 $0.00 $0.00 $0.00
INSULATOR/ASBESTOS WORKER: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHES TO ALL TYPES OF MECHANICAL $56.32 $26.52 $82.84 $0.00 $0.00 $0.00 $0.00
IRONWORKER $43.75 $34.45 $78.20 $0.00 $0.00 $0.00 $0.00
IRONWORKER $50.70 $35.15 $85.85 $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1 CLEANING AND HANDLING OF PANEL FORMS; CONCRETE SCREEDING FOR ROUGH STRIKE-OFF; CONCRETE, WATER CURING; DEMOLITION LABORER, THE CLEANIN $46.48 $25.95 $72.43 $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 ASPHALT SHOVELER; CEMENT DUMPER; CESSPOOL DIGGER AND INSTALLER; CHUCKTENDER; CHUTE HANDLER, POURING CONCRETE, THE HANDLING OF THE CHUT $47.03 $25.95 $72.98 $0.00 $0.00 $0.00 $0.00
LABORER GROUP 3 BUGGYMOBILE PERSON; CONCRETE CUTTING TORCH; CONCRETE PILE CUTTER; DRILLER, JACKHAMMER, 2-1/2 FT. DRILL STEEL OR LONGER; DRI-PAK-IT MAC $47.58 $25.95 $73.53 $0.00 $0.00 $0.00 $0.00
LABORER GROUP 5 BLASTER POWDER, ALL WORK OF LOADING HOLES, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE, REGARDLESS OF METHOD US $49.48 $25.95 $75.43 $0.00 $0.00 $0.00 $0.00
LABORER, TUNNEL: GROUP 1: BATCH PLANT LABORER; CHANGEHOUSE PERSON; DUMP PERSON; DUMP PERSON; SWAMPER; TUNNEL MATERIALS HANDLING PERSON; NIPPER; POT TE $53.60 $25.74 $79.34 $0.00 $0.00 $0.00 $0.00
LABORER, TUNNEL: GROUP 2: CHUCKTENDER, CABLETENDER; LOADING AND UNLOADING AGITATOR CARS; VIBRATOR PERSON, JACK HAMMER, PNEUMATIC TOOLS; BULL GANG MUCK $53.60 $25.74 $79.34 $0.00 $0.00 $0.00 $0.00
LABORER, TUNNEL: GROUP 2: CHUCKTENDER, CABLETENDER; LOADING AND UNLOADING AGITATOR CARS; VIBRATOR PERSON, JACK HAMMER, PNEUMATIC TOOLS; BULL GANG MUCK $53.92 $25.74 $79.66 $0.00 $0.00 $0.00 $0.00
LABORER, TUNNEL: GROUP 3 GROUP 3: BLASTER, DRILLER, POWDER PERSON; CHEMICAL GROUT JET PERSON; CHERRY PICKER PERSON; GROUT GUN PERSON; GROUT MIXER PERS $54.38 $25.74 $80.12 $0.00 $0.00 $0.00 $0.00
LABORER, TUNNEL: GROUP 3: BLASTER, DRILLER, POWDER PERSON; CHEMICAL GROUT JET PERSON; CHERRY PICKER PERSON; GROUT GUN PERSON; GROUT MIXER PERSON; GROU $54.38 $25.74 $80.12 $0.00 $0.00 $0.00 $0.00
LABORER, TUNNEL: GROUP 4 GROUP 4: DIAMOND DRILLER; SANDBLASTER; SHAFT AND RAISE WORK $55.07 $25.74 $80.81 $0.00 $0.00 $0.00 $0.00
LABORER, TUNNEL: GROUP 4: DIAMOND DRILLER; SANDBLASTER; SHAFT AND RAISE WORK $55.07 $25.74 $80.81 $0.00 $0.00 $0.00 $0.00
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: DRILLING CREW LABORER $47.94 $20.86 $68.80 $0.00 $0.00 $0.00 $0.00
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: ELECTRONIC TRACKING LOCATOR $51.96 $20.86 $72.82 $0.00 $0.00 $0.00 $0.00
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: HORIZONTAL DIRECTIONAL DRILL OPERATOR $49.96 $20.86 $70.82 $0.00 $0.00 $0.00 $0.00
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: VEHICLE OPERATOR/HAULER $48.11 $20.86 $68.97 $0.00 $0.00 $0.00 $0.00
LABORERS:, STRIPING/SLURRY SEAL: GROUP 1 PROTECTIVE COATING, PAVEMENT SEALING, INCLUDING REPAIR AND FILLING OF CRACKS BY ANY METHOD ON ANY SURFACE IN $49.30 $23.97 $73.27 $0.00 $0.00 $0.00 $0.00
LABORERS:, STRIPING/SLURRY SEAL: GROUP 2 TRAFFIC SURFACE ABRASIVE BLASTER; POT TENDER - REMOVAL OF ALL TRAFFIC LINES AND MARKINGS BY ANY METHOD AND PR $50.60 $23.97 $74.57 $0.00 $0.00 $0.00 $0.00
LABORERS:, STRIPING/SLURRY SEAL: GROUP 3 TRAFFIC DELINEATING DEVICE APPLICATOR: LAYOUT AND APPLICATION OF PAVEMENT MARKERS, DELINEATING SIGNS, RUMBLE $52.61 $23.97 $76.58 $0.00 $0.00 $0.00 $0.00
LABORERS:, STRIPING/SLURRY SEAL: GROUP 4 STRIPER: LAYOUT AND APPLICATION OF TRAFFIC STRIPES AND MARKINGS; HOT THERMO PLASTIC; TAPE TRAFFIC STRIPES AND $54.35 $23.97 $78.32 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: EQUIPMENT SPECIALIST (OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES, OVERHEAD & UNDERGROUND DIS $53.30 $22.26 $75.56 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DA $40.76 $21.76 $62.52 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMAN; CABLE SPLICER HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVI $70.16 $24.71 $94.87 $0.00 $0.00 $0.00 $0.00
MARBLE FINISHER $43.38 $15.36 $58.74 $0.00 $0.00 $0.00 $0.00
MODULAR FURNITURE INSTALLER $25.00 $13.06 $38.06 $0.00 $0.00 $0.00 $0.00
OPERATOR, POWER EQUIPMENT: BARGE MATE $61.34 $40.95 $102.29 $0.00 $0.00 $0.00 $0.00
OPERATOR, POWER EQUIPMENT: DECKMATE..$ 61.82 40.95 OPERATOR, POWER EQUIPMENT: DREDGE DOZER $61.93 $40.95 $102.88 $0.00 $0.00 $0.00 $0.00
OPERATOR, POWER EQUIPMENT: FIREMAN-OILER, DECKHAND, BARGEMAN, LEVEEHAND $60.73 $40.95 $101.68 $0.00 $0.00 $0.00 $0.00
OPERATOR, POWER EQUIPMENT: WINCH OPERATOR $61.27 $40.95 $102.22 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 12- AUTO GRADER OPERATOR; AUTOMATIC SLIP FORM OPERATOR; DRILLING MACHINE OPERATOR, BUCKET OR AUGER TY $66.58 $33.20 $99.78 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 13- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM PREMIUM PA $66.68 $33.20 $99.88 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 14- CANAL LINER OPERATOR; CANAL TRIMMER OPERATOR; REMOTE- CONTROL EARTH-MOVING EQUIPMENT OPERATOR; WH $66.71 $33.20 $99.91 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 15- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM; RUBBER-T $66.79 $33.20 $99.99 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 16- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM; RUBBER-T $66.91 $33.20 $100.11 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 17- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM; TANDEM T $67.08 $33.20 $100.28 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 19- ROTEX CONCRETE BELT OPERATOR; RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM $67.29 $33.20 $100.49 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 2- ASPHALT-RUBBER PLANT OPERATOR;COIL TUBING RIG OPERATOR, CONCRETE MIXER OPERATOR-SKIP TYPE; CONVEYO $64.18 $33.20 $97.38 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 2-0 RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM; RUBBER-TIRED EARTH-MOVING EQUI $67.41 $33.20 $100.61 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 21- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM PREMIUM PAY: $10.00 PER HOUR SH $67.58 $33.20 $100.78 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 22- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL SYSTE $67.68 $33.20 $100.88 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 23- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL SYSTE $67.79 $33.20 $100.99 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 3- ASPHALT-RUBBER BLEND OPERATOR; BOBCAT OR SIMILAR TYPE; EQUIPMENT GREASER; FORD FERGUSON; HELICOPTE $64.67 $33.20 $97.87 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 4- ASPHALT PLANT FIREMAN; BACKHOE OPERATOR; BORING MACHINE OPERATOR; BOXMAN OR MIXERMAN; CHIP SPREADI $65.96 $33.20 $99.16 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 6- ARTICULATING MATERIAL HAULER; ASPHALT PLANT ENGINEER; BATCH PLANT OPERATOR; BIT SHARPENER; CONCRET $66.18 $33.20 $99.38 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 1- Engineer oiler; Fork lift operator PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON A $64.75 $33.20 $97.95 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 10- Crane operator; Derrick barge operator; Hoist operator, stiff legs, Guy derrick o $67.75 $33.20 $100.95 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 11- Crane operator; Derrick barge operator; Hoist operator, stiff legs, Guy derrick o $68.75 $33.20 $101.95 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 12- Crane operator; Derrick barge operator; Hoist operator, stiff legs, Guy derrick o $69.75 $33.20 $102.95 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 13 Crane operator; Derrick barge operator; Helicopter pilot; Hoist operator, stiff le $70.75 $33.20 $103.95 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 2- Truck crane oiler PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMEN $65.53 $33.20 $98.73 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 3- A-frame or winch truck operator; Ross carrier operator PREMIUM PAY: $10.00 PER HOU $65.82 $33.20 $99.02 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 4- Bridge-type unloader and turntable operator; Helicopter hoist operator PREMIUM PAY $65.96 $33.20 $99.16 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 5 HYDRAULIC BOOM TRUCK; STINGER CRANE; TUGGER HOIST OPERATOR PREMIUM PAY: $10.00 PER $66.18 $33.20 $99.38 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 6 Bridge crane operator; Cretor crane operator; Hoist operator; Lift mobile operator $66.29 $33.20 $99.49 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 7 PEDESTAL CRANE OPERATOR; SHOVEL, BACKHOE, DRAGLINE, CLAMSHELL OPERATOR; TOWER CRANE $66.41 $33.20 $99.61 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 8 Crane operator; Crawler transporter operator; Derrick barge operator; Hoist operato $66.58 $33.20 $99.78 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 9 Crane operator; Derrick barge operator; Highline cableway operator; Hoist operator $66.75 $33.20 $99.95 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 1- Skiploader PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the fol $65.25 $33.20 $98.45 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 2- Power-driven jumbo form setter operator PREMIUM PAY: $10.00 per hour shall be paid on all Power Equip $66.03 $33.20 $99.23 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 3- Dinkey locomotive or motorperson PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Op $66.32 $33.20 $99.52 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 4- Bit sharpener; Equipment greaser; Slip form pump operator; Tugger hoist operator; Tunnel locomotive o $66.46 $33.20 $99.66 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 5- Backhoe operator; Small Ford, Case or similar; Drill doctor; Grouting machine operator; Heading shiel $66.68 $33.20 $99.88 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 6- Heavy Duty Repairman PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work $66.79 $33.20 $99.99 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 7- Tunnel mole boring machine operator PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment $66.91 $33.20 $100.11 $0.00 $0.00 $0.00 $0.00
OR COMPRESSOR PLANT OPERATOR; PUMP OPERATOR; SIGNALMAN; SWITCHMAN PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON T $63.40 $33.20 $96.60 $0.00 $0.00 $0.00 $0.00
PAINTERS: INCLUDING LEAD ABATEMENT: INDUSTRIAL..$ 41.42 19.04 PAINTERS: INCLUDING LEAD ABATEMENT: ALL OTHER WORK $34.08 $18.50 $52.58 $0.00 $0.00 $0.00 $0.00
PAINTERS: INCLUDING LEAD ABATEMENT: JOURNEYMAN PAINTER $34.08 $18.50 $52.58 $0.00 $0.00 $0.00 $0.00
PLASTERER U.S. MARINE CORPS-PICKLE MEADOW & MOUNTAIN WARFARE TRAINING CENTER: $3.00 ADDITIONAL PER HOUR $47.37 $19.64 $67.01 $0.00 $0.00 $0.00 $0.00
PLUMBER $48.84 $23.58 $72.42 $0.00 $0.00 $0.00 $0.00
PLUMBER $44.75 $26.20 $70.95 $0.00 $0.00 $0.00 $0.00
PLUMBER: PLUMBER, PIPEFITTER, STEAMFITTER, REFRIGERATION: ALL OTHER WORK FOOTNOTE: WORK FROM A SWINGING SCAFFOLD, SWINGING BASKET, SPIDER OR FROM A BO $61.73 $26.81 $88.54 $0.00 $0.00 $0.00 $0.00
PLUMBER: PLUMBER, PIPEFITTER, STEAMFITTER, REFRIGERATION: CHINA LAKE, MARINE WARFARE TRAINING CENTER FOOTNOTE: WORK FROM A SWINGING SCAFFOLD, SWINGING $72.23 $26.81 $99.04 $0.00 $0.00 $0.00 $0.00
PLUMBER: PLUMBER, PIPEFITTER, STEAMFITTER, REFRIGERATION: EDWARDS AIR FORCE BASE FOOTNOTE: WORK FROM A SWINGING SCAFFOLD, SWINGING BASKET, SPIDER OR F $68.73 $26.81 $95.54 $0.00 $0.00 $0.00 $0.00
PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTRO NAVAL FACILITY, FORT IRWIN, MARINE COR $42.12 $35.69 $77.81 $0.00 $0.00 $0.00 $0.00
ROOFER FOOTNOTE: WORK WITH PITCH, PITCH BASE OF PITCH IMPREGNATED PRODUCTS OR ANY MATERIAL CONTAINING COAL TAR PITCH, ON ANY BUILDING OLD OR NEW, WHER $45.76 $16.86 $62.62 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER (KERN & LOS ANGELES COUNTIES) $45.98 $29.24 $75.22 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: COMMERCIAL - NEW CONSTRUCTION AND REMODEL WORK (LOS ANGELESAND CATALINA ISLAND, INYO, KERN, MONO ORANGE, RIVERSIDE, AND SAN BERNAR $59.31 $30.43 $89.74 $0.00 $0.00 $0.00 $0.00
SOFT FLOOR LAYER $45.15 $19.43 $64.58 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $50.79 $29.80 $80.59 $0.00 $0.00 $0.00 $0.00
TERRAZZO FINISHER $42.11 $14.67 $56.78 $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER/SETTER $49.62 $15.26 $64.88 $0.00 $0.00 $0.00 $0.00
TILE FINISHER $37.96 $13.77 $51.73 $0.00 $0.00 $0.00 $0.00
TILE LAYER $48.29 $19.18 $67.47 $0.00 $0.00 $0.00 $0.00
TO THE FORM OF MOTIVE POWER; TOXIC WASTE REMOVAL LABORER GROUP 4 ASPHALT RAKER, LUTE PERSON, IRONER, ASPHALT DUMP PERSON, AND ASPHALT SPREADER BOXES $49.13 $25.95 $75.08 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 1 TRUCK DRIVER WORK ON ALL MILITARY BASES: PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE $41.59 $35.69 $77.28 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 10 DUMP TRUCK - 50 YDS. OR MORE WATER LEVEL; WATER PULL - SINGLE ENGINE WITH ATTACHMENT WORK ON ALL MILITARY BASES: PREMIUM PAY: $3 $43.12 $35.69 $78.81 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 11 WATER PULL - TWIN ENGINE; WATER PULL - TWIN ENGINE WITH ATTACHMENTS; WINCH TRUCK DRIVER - $1.25 ADDITIONAL WHEN OPERATING WINCH $43.62 $35.69 $79.31 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 12 BOOM TRUCK 17K AND ABOVE WORK ON ALL MILITARY BASES: PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS $44.05 $35.69 $79.74 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 2 DRIVER OF VEHICLE OR COMBINATION OF VEHICLES - 2 AXLES; TRAFFIC CONTROL PILOT CAR EXCLUDING MOVING HEAVY EQUIPMENT PERMIT LOAD; T $41.74 $35.69 $77.43 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 3 DRIVER OF VEHICLE OR COMBINATION OF VEHICLES - 3 AXLES; BOOT PERSON; CEMENT MASON DISTRIBUTION TRUCK; FUEL TRUCK DRIVER; WATER TR $41.87 $35.69 $77.56 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 5 WATER TRUCK, 3 OR MORE AXLES; TRUCK GREASER AND TIRE PERSON; PIPELINE AND UTILITY WORKING TRUCK DRIVER, INCLUDING WINCH TRUCK AND $42.09 $35.69 $77.78 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 7 $42.37 $35.69 $78.06 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 8 DUMP TRUCK, 25 YDS. TO 49 YDS. WATER LEVEL; TRUCK REPAIR PERSON; WATER PULL - SINGLE ENGINE; WELDER WORK ON ALL MILITARY BASES: P $42.62 $35.69 $78.31 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 9 TRUCK REPAIR PERSON/WELDER; LOW BED DRIVER, 9 AXLES OR OVER WORK ON ALL MILITARY BASES: PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [ $42.82 $35.69 $78.51 $0.00 $0.00 $0.00 $0.00
TYPES; CABLE BUNDLING MACHINE OPERATOR; CABLE TRENCHING MACHINE OPERATOR CAST-IN-PLACE PIPE LAYING MACHINE OPERATOR; COMBINATION MIXER AND COMPRESSOR $66.29 $33.20 $99.49 $0.00 $0.00 $0.00 $0.00
WATER LEVEL WORK ON ALL MILITARY BASES: PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTR $42.06 $35.69 $77.75 $0.00 $0.00 $0.00 $0.00
View all WDs for Kern → Revision history →