WATER LEVEL WORK ON ALL MILITARY BASES: PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTR — Prevailing Wage Rates
Davis-Bacon prevailing wages for WATER LEVEL WORK ON ALL MILITARY BASES: PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTRs across all covered states and counties. Rates vary by location and construction type.
Across 33 Davis-Bacon rate records nationwide, the median total package (base + fringe) for WATER LEVEL WORK ON ALL MILITARY BASES: PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTR is $77.75/hr, with the middle 80% of counties paying between $77.75 and $77.75/hr. The highest state average is California at $77.75/hr; the lowest is California at $77.75/hr.
Range: $77.75 – $77.75/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
33 county-level rates for WATER LEVEL WORK ON ALL MILITARY BASES: PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTR, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Imperial | CA | building | $42.06 | $35.69 | $77.75 | WD → |
| Imperial | CA | highway | $42.06 | $35.69 | $77.75 | WD → |
| Imperial | CA | heavy | $42.06 | $35.69 | $77.75 | WD → |
| Inyo | CA | highway | $42.06 | $35.69 | $77.75 | WD → |
| Inyo | CA | building | $42.06 | $35.69 | $77.75 | WD → |
| Inyo | CA | heavy | $42.06 | $35.69 | $77.75 | WD → |
| Kern | CA | highway | $42.06 | $35.69 | $77.75 | WD → |
| Kern | CA | building | $42.06 | $35.69 | $77.75 | WD → |
| Kern | CA | heavy | $42.06 | $35.69 | $77.75 | WD → |
| Los Angeles | CA | building | $42.06 | $35.69 | $77.75 | WD → |
| Los Angeles | CA | highway | $42.06 | $35.69 | $77.75 | WD → |
| Los Angeles | CA | heavy | $42.06 | $35.69 | $77.75 | WD → |
| Mono | CA | building | $42.06 | $35.69 | $77.75 | WD → |
| Mono | CA | heavy | $42.06 | $35.69 | $77.75 | WD → |
| Mono | CA | highway | $42.06 | $35.69 | $77.75 | WD → |
| Orange | CA | heavy | $42.06 | $35.69 | $77.75 | WD → |
| Orange | CA | highway | $42.06 | $35.69 | $77.75 | WD → |
| Orange | CA | building | $42.06 | $35.69 | $77.75 | WD → |
| Riverside | CA | building | $42.06 | $35.69 | $77.75 | WD → |
| Riverside | CA | highway | $42.06 | $35.69 | $77.75 | WD → |
| Riverside | CA | heavy | $42.06 | $35.69 | $77.75 | WD → |
| San Bernardino | CA | highway | $42.06 | $35.69 | $77.75 | WD → |
| San Bernardino | CA | building | $42.06 | $35.69 | $77.75 | WD → |
| San Bernardino | CA | heavy | $42.06 | $35.69 | $77.75 | WD → |
| San Luis Obispo | CA | building | $42.06 | $35.69 | $77.75 | WD → |
| San Luis Obispo | CA | highway | $42.06 | $35.69 | $77.75 | WD → |
| San Luis Obispo | CA | heavy | $42.06 | $35.69 | $77.75 | WD → |
| Santa Barbara | CA | highway | $42.06 | $35.69 | $77.75 | WD → |
| Santa Barbara | CA | heavy | $42.06 | $35.69 | $77.75 | WD → |
| Santa Barbara | CA | building | $42.06 | $35.69 | $77.75 | WD → |
| Ventura | CA | heavy | $42.06 | $35.69 | $77.75 | WD → |
| Ventura | CA | highway | $42.06 | $35.69 | $77.75 | WD → |
| Ventura | CA | building | $42.06 | $35.69 | $77.75 | WD → |