WATER LEVEL WORK ON ALL MILITARY BASES: PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTR — Prevailing Wage Rates

Davis-Bacon prevailing wages for WATER LEVEL WORK ON ALL MILITARY BASES: PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTRs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 33 Davis-Bacon rate records nationwide, the median total package (base + fringe) for WATER LEVEL WORK ON ALL MILITARY BASES: PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTR is $77.75/hr, with the middle 80% of counties paying between $77.75 and $77.75/hr. The highest state average is California at $77.75/hr; the lowest is California at $77.75/hr.

Bottom 10%
$77.75
Median
$77.75
Average
$77.75
Top 10%
$77.75

Range: $77.75 – $77.75/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

California CA
Avg base: $42.06/hr
Avg total: $77.75/hr
33 rates

All Rates

33 county-level rates for WATER LEVEL WORK ON ALL MILITARY BASES: PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTR, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Imperial CA building $42.06 $35.69 $77.75 WD →
Imperial CA highway $42.06 $35.69 $77.75 WD →
Imperial CA heavy $42.06 $35.69 $77.75 WD →
Inyo CA highway $42.06 $35.69 $77.75 WD →
Inyo CA building $42.06 $35.69 $77.75 WD →
Inyo CA heavy $42.06 $35.69 $77.75 WD →
Kern CA highway $42.06 $35.69 $77.75 WD →
Kern CA building $42.06 $35.69 $77.75 WD →
Kern CA heavy $42.06 $35.69 $77.75 WD →
Los Angeles CA building $42.06 $35.69 $77.75 WD →
Los Angeles CA highway $42.06 $35.69 $77.75 WD →
Los Angeles CA heavy $42.06 $35.69 $77.75 WD →
Mono CA building $42.06 $35.69 $77.75 WD →
Mono CA heavy $42.06 $35.69 $77.75 WD →
Mono CA highway $42.06 $35.69 $77.75 WD →
Orange CA heavy $42.06 $35.69 $77.75 WD →
Orange CA highway $42.06 $35.69 $77.75 WD →
Orange CA building $42.06 $35.69 $77.75 WD →
Riverside CA building $42.06 $35.69 $77.75 WD →
Riverside CA highway $42.06 $35.69 $77.75 WD →
Riverside CA heavy $42.06 $35.69 $77.75 WD →
San Bernardino CA highway $42.06 $35.69 $77.75 WD →
San Bernardino CA building $42.06 $35.69 $77.75 WD →
San Bernardino CA heavy $42.06 $35.69 $77.75 WD →
San Luis Obispo CA building $42.06 $35.69 $77.75 WD →
San Luis Obispo CA highway $42.06 $35.69 $77.75 WD →
San Luis Obispo CA heavy $42.06 $35.69 $77.75 WD →
Santa Barbara CA highway $42.06 $35.69 $77.75 WD →
Santa Barbara CA heavy $42.06 $35.69 $77.75 WD →
Santa Barbara CA building $42.06 $35.69 $77.75 WD →
Ventura CA heavy $42.06 $35.69 $77.75 WD →
Ventura CA highway $42.06 $35.69 $77.75 WD →
Ventura CA building $42.06 $35.69 $77.75 WD →
Top-paying counties for WATER LEVEL WORK ON ALL MILITARY BASES: PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTR →