HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEEL — Prevailing Wage Rates

Davis-Bacon prevailing wages for HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 37 Davis-Bacon rate records nationwide, the median total package (base + fringe) for HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEEL is $100.38/hr, with the middle 80% of counties paying between $100.38 and $100.38/hr. The highest state average is California at $100.38/hr; the lowest is California at $100.38/hr.

Bottom 10%
$100.38
Median
$100.38
Average
$100.38
Top 10%
$100.38

Range: $100.38 – $100.38/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

California CA
Avg base: $67.18/hr
Avg total: $100.38/hr
37 rates

All Rates

37 county-level rates for HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEEL, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Imperial CA building $67.18 $33.20 $100.38 WD →
Imperial CA highway $67.18 $33.20 $100.38 WD →
Imperial CA heavy $67.18 $33.20 $100.38 WD →
Inyo CA heavy $67.18 $33.20 $100.38 WD →
Inyo CA highway $67.18 $33.20 $100.38 WD →
Inyo CA building $67.18 $33.20 $100.38 WD →
Kern CA heavy $67.18 $33.20 $100.38 WD →
Kern CA building $67.18 $33.20 $100.38 WD →
Kern CA highway $67.18 $33.20 $100.38 WD →
Los Angeles CA heavy $67.18 $33.20 $100.38 WD →
Los Angeles CA building $67.18 $33.20 $100.38 WD →
Los Angeles CA highway $67.18 $33.20 $100.38 WD →
Mono CA heavy $67.18 $33.20 $100.38 WD →
Mono CA building $67.18 $33.20 $100.38 WD →
Mono CA highway $67.18 $33.20 $100.38 WD →
Orange CA building $67.18 $33.20 $100.38 WD →
Orange CA highway $67.18 $33.20 $100.38 WD →
Orange CA heavy $67.18 $33.20 $100.38 WD →
Riverside CA building $67.18 $33.20 $100.38 WD →
Riverside CA highway $67.18 $33.20 $100.38 WD →
Riverside CA heavy $67.18 $33.20 $100.38 WD →
San Bernardino CA highway $67.18 $33.20 $100.38 WD →
San Bernardino CA building $67.18 $33.20 $100.38 WD →
San Bernardino CA heavy $67.18 $33.20 $100.38 WD →
San Diego CA building $67.18 $33.20 $100.38 WD →
San Diego CA residential $67.18 $33.20 $100.38 WD →
San Diego CA highway $67.18 $33.20 $100.38 WD →
San Diego CA heavy $67.18 $33.20 $100.38 WD →
San Luis Obispo CA highway $67.18 $33.20 $100.38 WD →
San Luis Obispo CA heavy $67.18 $33.20 $100.38 WD →
San Luis Obispo CA building $67.18 $33.20 $100.38 WD →
Santa Barbara CA highway $67.18 $33.20 $100.38 WD →
Santa Barbara CA heavy $67.18 $33.20 $100.38 WD →
Santa Barbara CA building $67.18 $33.20 $100.38 WD →
Ventura CA heavy $67.18 $33.20 $100.38 WD →
Ventura CA highway $67.18 $33.20 $100.38 WD →
Ventura CA building $67.18 $33.20 $100.38 WD →
Top-paying counties for HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEEL →