CARPENTER: SAW FILER FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGING IS US — Prevailing Wage Rates

Davis-Bacon prevailing wages for CARPENTER: SAW FILER FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGING IS USs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 9 Davis-Bacon rate records nationwide, the median total package (base + fringe) for CARPENTER: SAW FILER FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGING IS US is $67.31/hr, with the middle 80% of counties paying between $67.31 and $67.31/hr. The highest state average is California at $67.31/hr; the lowest is California at $67.31/hr.

Bottom 10%
$67.31
Median
$67.31
Average
$67.31
Top 10%
$67.31

Range: $67.31 – $67.31/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2031Carpenters.

Davis-Bacon median
$67.31/hr
National median total package (base + fringe)
BLS OEWS market median
$28.51/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+136.1%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

California CA
Avg base: $51.03/hr
Avg total: $67.31/hr
9 rates

All Rates

9 county-level rates for CARPENTER: SAW FILER FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGING IS US, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Inyo CA highway $51.03 $16.28 $67.31 WD →
Inyo CA heavy $51.03 $16.28 $67.31 WD →
Inyo CA building $51.03 $16.28 $67.31 WD →
Kern CA heavy $51.03 $16.28 $67.31 WD →
Kern CA building $51.03 $16.28 $67.31 WD →
Kern CA highway $51.03 $16.28 $67.31 WD →
Mono CA highway $51.03 $16.28 $67.31 WD →
Mono CA heavy $51.03 $16.28 $67.31 WD →
Mono CA building $51.03 $16.28 $67.31 WD →
Top-paying counties for CARPENTER: SAW FILER FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGING IS US →