CARPENTER: SCAFFOLD BUILDER FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGIN — Prevailing Wage Rates
Davis-Bacon prevailing wages for CARPENTER: SCAFFOLD BUILDER FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGINs across all covered states and counties. Rates vary by location and construction type.
Across 33 Davis-Bacon rate records nationwide, the median total package (base + fringe) for CARPENTER: SCAFFOLD BUILDER FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGIN is $70.80/hr, with the middle 80% of counties paying between $59.08 and $70.80/hr. The highest state average is California at $67.60/hr; the lowest is California at $67.60/hr.
Range: $59.08 – $70.80/hr across 1 state. Total package = base hourly rate + fringe benefits.
Davis-Bacon vs. Market Median
Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2031 — Carpenters.
Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.
Average Rates by State
All Rates
33 county-level rates for CARPENTER: SCAFFOLD BUILDER FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGIN, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Imperial | CA | building | $45.37 | $25.43 | $70.80 | WD → |
| Imperial | CA | highway | $45.37 | $25.43 | $70.80 | WD → |
| Imperial | CA | heavy | $45.37 | $25.43 | $70.80 | WD → |
| Inyo | CA | highway | $42.80 | $16.28 | $59.08 | WD → |
| Inyo | CA | building | $42.80 | $16.28 | $59.08 | WD → |
| Inyo | CA | heavy | $42.80 | $16.28 | $59.08 | WD → |
| Kern | CA | highway | $42.80 | $16.28 | $59.08 | WD → |
| Kern | CA | building | $42.80 | $16.28 | $59.08 | WD → |
| Kern | CA | heavy | $42.80 | $16.28 | $59.08 | WD → |
| Los Angeles | CA | building | $45.37 | $25.43 | $70.80 | WD → |
| Los Angeles | CA | highway | $45.37 | $25.43 | $70.80 | WD → |
| Los Angeles | CA | heavy | $45.37 | $25.43 | $70.80 | WD → |
| Mono | CA | building | $42.80 | $16.28 | $59.08 | WD → |
| Mono | CA | heavy | $42.80 | $16.28 | $59.08 | WD → |
| Mono | CA | highway | $42.80 | $16.28 | $59.08 | WD → |
| Orange | CA | heavy | $45.37 | $25.43 | $70.80 | WD → |
| Orange | CA | highway | $45.37 | $25.43 | $70.80 | WD → |
| Orange | CA | building | $45.37 | $25.43 | $70.80 | WD → |
| Riverside | CA | building | $45.37 | $25.43 | $70.80 | WD → |
| Riverside | CA | highway | $45.37 | $25.43 | $70.80 | WD → |
| Riverside | CA | heavy | $45.37 | $25.43 | $70.80 | WD → |
| San Bernardino | CA | highway | $45.37 | $25.43 | $70.80 | WD → |
| San Bernardino | CA | building | $45.37 | $25.43 | $70.80 | WD → |
| San Bernardino | CA | heavy | $45.37 | $25.43 | $70.80 | WD → |
| San Luis Obispo | CA | building | $45.37 | $25.43 | $70.80 | WD → |
| San Luis Obispo | CA | highway | $45.37 | $25.43 | $70.80 | WD → |
| San Luis Obispo | CA | heavy | $45.37 | $25.43 | $70.80 | WD → |
| Santa Barbara | CA | highway | $45.37 | $25.43 | $70.80 | WD → |
| Santa Barbara | CA | heavy | $45.37 | $25.43 | $70.80 | WD → |
| Santa Barbara | CA | building | $45.37 | $25.43 | $70.80 | WD → |
| Ventura | CA | heavy | $45.37 | $25.43 | $70.80 | WD → |
| Ventura | CA | highway | $45.37 | $25.43 | $70.80 | WD → |
| Ventura | CA | building | $45.37 | $25.43 | $70.80 | WD → |