LABORER, TUNNEL: GROUP 1: BATCH PLANT LABORER; CHANGEHOUSE PERSON; DUMP PERSON; DUMP PERSON; SWAMPER; TUNNEL MATERIALS HANDLING PERSON; NIPPER; POT TE — Prevailing Wage Rates

Davis-Bacon prevailing wages for LABORER, TUNNEL: GROUP 1: BATCH PLANT LABORER; CHANGEHOUSE PERSON; DUMP PERSON; DUMP PERSON; SWAMPER; TUNNEL MATERIALS HANDLING PERSON; NIPPER; POT TEs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 27 Davis-Bacon rate records nationwide, the median total package (base + fringe) for LABORER, TUNNEL: GROUP 1: BATCH PLANT LABORER; CHANGEHOUSE PERSON; DUMP PERSON; DUMP PERSON; SWAMPER; TUNNEL MATERIALS HANDLING PERSON; NIPPER; POT TE is $79.34/hr, with the middle 80% of counties paying between $79.34 and $79.34/hr. The highest state average is California at $79.34/hr; the lowest is California at $79.34/hr.

Bottom 10%
$79.34
Median
$79.34
Average
$79.34
Top 10%
$79.34

Range: $79.34 – $79.34/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2061Construction Laborers.

Davis-Bacon median
$79.34/hr
National median total package (base + fringe)
BLS OEWS market median
$22.47/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+253.1%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

California CA
Avg base: $53.60/hr
Avg total: $79.34/hr
27 rates

All Rates

27 county-level rates for LABORER, TUNNEL: GROUP 1: BATCH PLANT LABORER; CHANGEHOUSE PERSON; DUMP PERSON; DUMP PERSON; SWAMPER; TUNNEL MATERIALS HANDLING PERSON; NIPPER; POT TE, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Inyo CA heavy $53.60 $25.74 $79.34 WD →
Inyo CA highway $53.60 $25.74 $79.34 WD →
Inyo CA building $53.60 $25.74 $79.34 WD →
Kern CA building $53.60 $25.74 $79.34 WD →
Kern CA heavy $53.60 $25.74 $79.34 WD →
Kern CA highway $53.60 $25.74 $79.34 WD →
Los Angeles CA highway $53.60 $25.74 $79.34 WD →
Los Angeles CA heavy $53.60 $25.74 $79.34 WD →
Los Angeles CA building $53.60 $25.74 $79.34 WD →
Mono CA highway $53.60 $25.74 $79.34 WD →
Mono CA building $53.60 $25.74 $79.34 WD →
Mono CA heavy $53.60 $25.74 $79.34 WD →
Orange CA heavy $53.60 $25.74 $79.34 WD →
Orange CA highway $53.60 $25.74 $79.34 WD →
Orange CA building $53.60 $25.74 $79.34 WD →
San Bernardino CA highway $53.60 $25.74 $79.34 WD →
San Bernardino CA building $53.60 $25.74 $79.34 WD →
San Bernardino CA heavy $53.60 $25.74 $79.34 WD →
San Luis Obispo CA building $53.60 $25.74 $79.34 WD →
San Luis Obispo CA highway $53.60 $25.74 $79.34 WD →
San Luis Obispo CA heavy $53.60 $25.74 $79.34 WD →
Santa Barbara CA highway $53.60 $25.74 $79.34 WD →
Santa Barbara CA heavy $53.60 $25.74 $79.34 WD →
Santa Barbara CA building $53.60 $25.74 $79.34 WD →
Ventura CA heavy $53.60 $25.74 $79.34 WD →
Ventura CA highway $53.60 $25.74 $79.34 WD →
Ventura CA building $53.60 $25.74 $79.34 WD →
Top-paying counties for LABORER, TUNNEL: GROUP 1: BATCH PLANT LABORER; CHANGEHOUSE PERSON; DUMP PERSON; DUMP PERSON; SWAMPER; TUNNEL MATERIALS HANDLING PERSON; NIPPER; POT TE →