TRUCK DRIVER GROUP 10 DUMP TRUCK - 50 YDS. OR MORE WATER LEVEL; WATER PULL - SINGLE ENGINE WITH ATTACHMENT WORK ON ALL MILITARY BASES: PREMIUM PAY: $3 — Prevailing Wage Rates
Davis-Bacon prevailing wages for TRUCK DRIVER GROUP 10 DUMP TRUCK - 50 YDS. OR MORE WATER LEVEL; WATER PULL - SINGLE ENGINE WITH ATTACHMENT WORK ON ALL MILITARY BASES: PREMIUM PAY: $3s across all covered states and counties. Rates vary by location and construction type.
Across 33 Davis-Bacon rate records nationwide, the median total package (base + fringe) for TRUCK DRIVER GROUP 10 DUMP TRUCK - 50 YDS. OR MORE WATER LEVEL; WATER PULL - SINGLE ENGINE WITH ATTACHMENT WORK ON ALL MILITARY BASES: PREMIUM PAY: $3 is $78.81/hr, with the middle 80% of counties paying between $78.81 and $78.81/hr. The highest state average is California at $78.81/hr; the lowest is California at $78.81/hr.
Range: $78.81 – $78.81/hr across 1 state. Total package = base hourly rate + fringe benefits.
Davis-Bacon vs. Market Median
Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 53-3032 — Heavy and Tractor-Trailer Truck Drivers.
Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.
Average Rates by State
All Rates
33 county-level rates for TRUCK DRIVER GROUP 10 DUMP TRUCK - 50 YDS. OR MORE WATER LEVEL; WATER PULL - SINGLE ENGINE WITH ATTACHMENT WORK ON ALL MILITARY BASES: PREMIUM PAY: $3, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Imperial | CA | building | $43.12 | $35.69 | $78.81 | WD → |
| Imperial | CA | highway | $43.12 | $35.69 | $78.81 | WD → |
| Imperial | CA | heavy | $43.12 | $35.69 | $78.81 | WD → |
| Inyo | CA | highway | $43.12 | $35.69 | $78.81 | WD → |
| Inyo | CA | building | $43.12 | $35.69 | $78.81 | WD → |
| Inyo | CA | heavy | $43.12 | $35.69 | $78.81 | WD → |
| Kern | CA | highway | $43.12 | $35.69 | $78.81 | WD → |
| Kern | CA | building | $43.12 | $35.69 | $78.81 | WD → |
| Kern | CA | heavy | $43.12 | $35.69 | $78.81 | WD → |
| Los Angeles | CA | building | $43.12 | $35.69 | $78.81 | WD → |
| Los Angeles | CA | highway | $43.12 | $35.69 | $78.81 | WD → |
| Los Angeles | CA | heavy | $43.12 | $35.69 | $78.81 | WD → |
| Mono | CA | building | $43.12 | $35.69 | $78.81 | WD → |
| Mono | CA | heavy | $43.12 | $35.69 | $78.81 | WD → |
| Mono | CA | highway | $43.12 | $35.69 | $78.81 | WD → |
| Orange | CA | heavy | $43.12 | $35.69 | $78.81 | WD → |
| Orange | CA | highway | $43.12 | $35.69 | $78.81 | WD → |
| Orange | CA | building | $43.12 | $35.69 | $78.81 | WD → |
| Riverside | CA | building | $43.12 | $35.69 | $78.81 | WD → |
| Riverside | CA | highway | $43.12 | $35.69 | $78.81 | WD → |
| Riverside | CA | heavy | $43.12 | $35.69 | $78.81 | WD → |
| San Bernardino | CA | highway | $43.12 | $35.69 | $78.81 | WD → |
| San Bernardino | CA | building | $43.12 | $35.69 | $78.81 | WD → |
| San Bernardino | CA | heavy | $43.12 | $35.69 | $78.81 | WD → |
| San Luis Obispo | CA | building | $43.12 | $35.69 | $78.81 | WD → |
| San Luis Obispo | CA | highway | $43.12 | $35.69 | $78.81 | WD → |
| San Luis Obispo | CA | heavy | $43.12 | $35.69 | $78.81 | WD → |
| Santa Barbara | CA | highway | $43.12 | $35.69 | $78.81 | WD → |
| Santa Barbara | CA | heavy | $43.12 | $35.69 | $78.81 | WD → |
| Santa Barbara | CA | building | $43.12 | $35.69 | $78.81 | WD → |
| Ventura | CA | heavy | $43.12 | $35.69 | $78.81 | WD → |
| Ventura | CA | highway | $43.12 | $35.69 | $78.81 | WD → |
| Ventura | CA | building | $43.12 | $35.69 | $78.81 | WD → |