OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 15- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM; RUBBER-T — Prevailing Wage Rates

Davis-Bacon prevailing wages for OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 15- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM; RUBBER-Ts across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 37 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 15- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM; RUBBER-T is $99.99/hr, with the middle 80% of counties paying between $99.99 and $99.99/hr. The highest state average is California at $99.99/hr; the lowest is California at $99.99/hr.

Bottom 10%
$99.99
Median
$99.99
Average
$99.99
Top 10%
$99.99

Range: $99.99 – $99.99/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

California CA
Avg base: $66.79/hr
Avg total: $99.99/hr
37 rates

All Rates

37 county-level rates for OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 15- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM; RUBBER-T, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Imperial CA building $66.79 $33.20 $99.99 WD →
Imperial CA highway $66.79 $33.20 $99.99 WD →
Imperial CA heavy $66.79 $33.20 $99.99 WD →
Inyo CA heavy $66.79 $33.20 $99.99 WD →
Inyo CA highway $66.79 $33.20 $99.99 WD →
Inyo CA building $66.79 $33.20 $99.99 WD →
Kern CA heavy $66.79 $33.20 $99.99 WD →
Kern CA building $66.79 $33.20 $99.99 WD →
Kern CA highway $66.79 $33.20 $99.99 WD →
Los Angeles CA heavy $66.79 $33.20 $99.99 WD →
Los Angeles CA building $66.79 $33.20 $99.99 WD →
Los Angeles CA highway $66.79 $33.20 $99.99 WD →
Mono CA heavy $66.79 $33.20 $99.99 WD →
Mono CA building $66.79 $33.20 $99.99 WD →
Mono CA highway $66.79 $33.20 $99.99 WD →
Orange CA building $66.79 $33.20 $99.99 WD →
Orange CA highway $66.79 $33.20 $99.99 WD →
Orange CA heavy $66.79 $33.20 $99.99 WD →
Riverside CA building $66.79 $33.20 $99.99 WD →
Riverside CA highway $66.79 $33.20 $99.99 WD →
Riverside CA heavy $66.79 $33.20 $99.99 WD →
San Bernardino CA highway $66.79 $33.20 $99.99 WD →
San Bernardino CA building $66.79 $33.20 $99.99 WD →
San Bernardino CA heavy $66.79 $33.20 $99.99 WD →
San Diego CA building $66.79 $33.20 $99.99 WD →
San Diego CA residential $66.79 $33.20 $99.99 WD →
San Diego CA highway $66.79 $33.20 $99.99 WD →
San Diego CA heavy $66.79 $33.20 $99.99 WD →
San Luis Obispo CA highway $66.79 $33.20 $99.99 WD →
San Luis Obispo CA heavy $66.79 $33.20 $99.99 WD →
San Luis Obispo CA building $66.79 $33.20 $99.99 WD →
Santa Barbara CA highway $66.79 $33.20 $99.99 WD →
Santa Barbara CA heavy $66.79 $33.20 $99.99 WD →
Santa Barbara CA building $66.79 $33.20 $99.99 WD →
Ventura CA heavy $66.79 $33.20 $99.99 WD →
Ventura CA highway $66.79 $33.20 $99.99 WD →
Ventura CA building $66.79 $33.20 $99.99 WD →
Top-paying counties for OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 15- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM; RUBBER-T →