ASBESTOS REMOVAL LABORER SCOPE OF WORK: INCLUDES SITE MOBILIZATION, INITIAL SITE CLEANUP, SITE PREPARATION, REMOVAL OF ASBESTOS-CONTAINING MATERIAL AN — Prevailing Wage Rates
Davis-Bacon prevailing wages for ASBESTOS REMOVAL LABORER SCOPE OF WORK: INCLUDES SITE MOBILIZATION, INITIAL SITE CLEANUP, SITE PREPARATION, REMOVAL OF ASBESTOS-CONTAINING MATERIAL ANs across all covered states and counties. Rates vary by location and construction type.
Across 37 Davis-Bacon rate records nationwide, the median total package (base + fringe) for ASBESTOS REMOVAL LABORER SCOPE OF WORK: INCLUDES SITE MOBILIZATION, INITIAL SITE CLEANUP, SITE PREPARATION, REMOVAL OF ASBESTOS-CONTAINING MATERIAL AN is $72.41/hr, with the middle 80% of counties paying between $72.41 and $72.41/hr. The highest state average is California at $72.41/hr; the lowest is California at $72.41/hr.
Range: $72.41 – $72.41/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
37 county-level rates for ASBESTOS REMOVAL LABORER SCOPE OF WORK: INCLUDES SITE MOBILIZATION, INITIAL SITE CLEANUP, SITE PREPARATION, REMOVAL OF ASBESTOS-CONTAINING MATERIAL AN, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Imperial | CA | building | $46.48 | $25.93 | $72.41 | WD → |
| Imperial | CA | highway | $46.48 | $25.93 | $72.41 | WD → |
| Imperial | CA | heavy | $46.48 | $25.93 | $72.41 | WD → |
| Inyo | CA | heavy | $46.48 | $25.93 | $72.41 | WD → |
| Inyo | CA | highway | $46.48 | $25.93 | $72.41 | WD → |
| Inyo | CA | building | $46.48 | $25.93 | $72.41 | WD → |
| Kern | CA | heavy | $46.48 | $25.93 | $72.41 | WD → |
| Kern | CA | building | $46.48 | $25.93 | $72.41 | WD → |
| Kern | CA | highway | $46.48 | $25.93 | $72.41 | WD → |
| Los Angeles | CA | heavy | $46.48 | $25.93 | $72.41 | WD → |
| Los Angeles | CA | building | $46.48 | $25.93 | $72.41 | WD → |
| Los Angeles | CA | highway | $46.48 | $25.93 | $72.41 | WD → |
| Mono | CA | heavy | $46.48 | $25.93 | $72.41 | WD → |
| Mono | CA | building | $46.48 | $25.93 | $72.41 | WD → |
| Mono | CA | highway | $46.48 | $25.93 | $72.41 | WD → |
| Orange | CA | building | $46.48 | $25.93 | $72.41 | WD → |
| Orange | CA | highway | $46.48 | $25.93 | $72.41 | WD → |
| Orange | CA | heavy | $46.48 | $25.93 | $72.41 | WD → |
| Riverside | CA | building | $46.48 | $25.93 | $72.41 | WD → |
| Riverside | CA | highway | $46.48 | $25.93 | $72.41 | WD → |
| Riverside | CA | heavy | $46.48 | $25.93 | $72.41 | WD → |
| San Bernardino | CA | highway | $46.48 | $25.93 | $72.41 | WD → |
| San Bernardino | CA | building | $46.48 | $25.93 | $72.41 | WD → |
| San Bernardino | CA | heavy | $46.48 | $25.93 | $72.41 | WD → |
| San Diego | CA | building | $46.48 | $25.93 | $72.41 | WD → |
| San Diego | CA | residential | $46.48 | $25.93 | $72.41 | WD → |
| San Diego | CA | highway | $46.48 | $25.93 | $72.41 | WD → |
| San Diego | CA | heavy | $46.48 | $25.93 | $72.41 | WD → |
| San Luis Obispo | CA | highway | $46.48 | $25.93 | $72.41 | WD → |
| San Luis Obispo | CA | heavy | $46.48 | $25.93 | $72.41 | WD → |
| San Luis Obispo | CA | building | $46.48 | $25.93 | $72.41 | WD → |
| Santa Barbara | CA | highway | $46.48 | $25.93 | $72.41 | WD → |
| Santa Barbara | CA | heavy | $46.48 | $25.93 | $72.41 | WD → |
| Santa Barbara | CA | building | $46.48 | $25.93 | $72.41 | WD → |
| Ventura | CA | heavy | $46.48 | $25.93 | $72.41 | WD → |
| Ventura | CA | highway | $46.48 | $25.93 | $72.41 | WD → |
| Ventura | CA | building | $46.48 | $25.93 | $72.41 | WD → |