ASBESTOS REMOVAL LABORER SCOPE OF WORK: INCLUDES SITE MOBILIZATION, INITIAL SITE CLEANUP, SITE PREPARATION, REMOVAL OF ASBESTOS-CONTAINING MATERIAL AN — Prevailing Wage Rates

Davis-Bacon prevailing wages for ASBESTOS REMOVAL LABORER SCOPE OF WORK: INCLUDES SITE MOBILIZATION, INITIAL SITE CLEANUP, SITE PREPARATION, REMOVAL OF ASBESTOS-CONTAINING MATERIAL ANs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 37 Davis-Bacon rate records nationwide, the median total package (base + fringe) for ASBESTOS REMOVAL LABORER SCOPE OF WORK: INCLUDES SITE MOBILIZATION, INITIAL SITE CLEANUP, SITE PREPARATION, REMOVAL OF ASBESTOS-CONTAINING MATERIAL AN is $72.41/hr, with the middle 80% of counties paying between $72.41 and $72.41/hr. The highest state average is California at $72.41/hr; the lowest is California at $72.41/hr.

Bottom 10%
$72.41
Median
$72.41
Average
$72.41
Top 10%
$72.41

Range: $72.41 – $72.41/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

California CA
Avg base: $46.48/hr
Avg total: $72.41/hr
37 rates

All Rates

37 county-level rates for ASBESTOS REMOVAL LABORER SCOPE OF WORK: INCLUDES SITE MOBILIZATION, INITIAL SITE CLEANUP, SITE PREPARATION, REMOVAL OF ASBESTOS-CONTAINING MATERIAL AN, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Imperial CA building $46.48 $25.93 $72.41 WD →
Imperial CA highway $46.48 $25.93 $72.41 WD →
Imperial CA heavy $46.48 $25.93 $72.41 WD →
Inyo CA heavy $46.48 $25.93 $72.41 WD →
Inyo CA highway $46.48 $25.93 $72.41 WD →
Inyo CA building $46.48 $25.93 $72.41 WD →
Kern CA heavy $46.48 $25.93 $72.41 WD →
Kern CA building $46.48 $25.93 $72.41 WD →
Kern CA highway $46.48 $25.93 $72.41 WD →
Los Angeles CA heavy $46.48 $25.93 $72.41 WD →
Los Angeles CA building $46.48 $25.93 $72.41 WD →
Los Angeles CA highway $46.48 $25.93 $72.41 WD →
Mono CA heavy $46.48 $25.93 $72.41 WD →
Mono CA building $46.48 $25.93 $72.41 WD →
Mono CA highway $46.48 $25.93 $72.41 WD →
Orange CA building $46.48 $25.93 $72.41 WD →
Orange CA highway $46.48 $25.93 $72.41 WD →
Orange CA heavy $46.48 $25.93 $72.41 WD →
Riverside CA building $46.48 $25.93 $72.41 WD →
Riverside CA highway $46.48 $25.93 $72.41 WD →
Riverside CA heavy $46.48 $25.93 $72.41 WD →
San Bernardino CA highway $46.48 $25.93 $72.41 WD →
San Bernardino CA building $46.48 $25.93 $72.41 WD →
San Bernardino CA heavy $46.48 $25.93 $72.41 WD →
San Diego CA building $46.48 $25.93 $72.41 WD →
San Diego CA residential $46.48 $25.93 $72.41 WD →
San Diego CA highway $46.48 $25.93 $72.41 WD →
San Diego CA heavy $46.48 $25.93 $72.41 WD →
San Luis Obispo CA highway $46.48 $25.93 $72.41 WD →
San Luis Obispo CA heavy $46.48 $25.93 $72.41 WD →
San Luis Obispo CA building $46.48 $25.93 $72.41 WD →
Santa Barbara CA highway $46.48 $25.93 $72.41 WD →
Santa Barbara CA heavy $46.48 $25.93 $72.41 WD →
Santa Barbara CA building $46.48 $25.93 $72.41 WD →
Ventura CA heavy $46.48 $25.93 $72.41 WD →
Ventura CA highway $46.48 $25.93 $72.41 WD →
Ventura CA building $46.48 $25.93 $72.41 WD →
Top-paying counties for ASBESTOS REMOVAL LABORER SCOPE OF WORK: INCLUDES SITE MOBILIZATION, INITIAL SITE CLEANUP, SITE PREPARATION, REMOVAL OF ASBESTOS-CONTAINING MATERIAL AN →