OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 2- ASPHALT-RUBBER PLANT OPERATOR;COIL TUBING RIG OPERATOR, CONCRETE MIXER OPERATOR-SKIP TYPE; CONVEYO — Prevailing Wage Rates

Davis-Bacon prevailing wages for OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 2- ASPHALT-RUBBER PLANT OPERATOR;COIL TUBING RIG OPERATOR, CONCRETE MIXER OPERATOR-SKIP TYPE; CONVEYOs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 37 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 2- ASPHALT-RUBBER PLANT OPERATOR;COIL TUBING RIG OPERATOR, CONCRETE MIXER OPERATOR-SKIP TYPE; CONVEYO is $97.38/hr, with the middle 80% of counties paying between $97.38 and $97.38/hr. The highest state average is California at $97.38/hr; the lowest is California at $97.38/hr.

Bottom 10%
$97.38
Median
$97.38
Average
$97.38
Top 10%
$97.38

Range: $97.38 – $97.38/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

California CA
Avg base: $64.18/hr
Avg total: $97.38/hr
37 rates

All Rates

37 county-level rates for OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 2- ASPHALT-RUBBER PLANT OPERATOR;COIL TUBING RIG OPERATOR, CONCRETE MIXER OPERATOR-SKIP TYPE; CONVEYO, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Imperial CA building $64.18 $33.20 $97.38 WD →
Imperial CA highway $64.18 $33.20 $97.38 WD →
Imperial CA heavy $64.18 $33.20 $97.38 WD →
Inyo CA heavy $64.18 $33.20 $97.38 WD →
Inyo CA highway $64.18 $33.20 $97.38 WD →
Inyo CA building $64.18 $33.20 $97.38 WD →
Kern CA heavy $64.18 $33.20 $97.38 WD →
Kern CA building $64.18 $33.20 $97.38 WD →
Kern CA highway $64.18 $33.20 $97.38 WD →
Los Angeles CA heavy $64.18 $33.20 $97.38 WD →
Los Angeles CA building $64.18 $33.20 $97.38 WD →
Los Angeles CA highway $64.18 $33.20 $97.38 WD →
Mono CA heavy $64.18 $33.20 $97.38 WD →
Mono CA building $64.18 $33.20 $97.38 WD →
Mono CA highway $64.18 $33.20 $97.38 WD →
Orange CA building $64.18 $33.20 $97.38 WD →
Orange CA highway $64.18 $33.20 $97.38 WD →
Orange CA heavy $64.18 $33.20 $97.38 WD →
Riverside CA building $64.18 $33.20 $97.38 WD →
Riverside CA highway $64.18 $33.20 $97.38 WD →
Riverside CA heavy $64.18 $33.20 $97.38 WD →
San Bernardino CA highway $64.18 $33.20 $97.38 WD →
San Bernardino CA building $64.18 $33.20 $97.38 WD →
San Bernardino CA heavy $64.18 $33.20 $97.38 WD →
San Diego CA building $64.18 $33.20 $97.38 WD →
San Diego CA residential $64.18 $33.20 $97.38 WD →
San Diego CA highway $64.18 $33.20 $97.38 WD →
San Diego CA heavy $64.18 $33.20 $97.38 WD →
San Luis Obispo CA highway $64.18 $33.20 $97.38 WD →
San Luis Obispo CA heavy $64.18 $33.20 $97.38 WD →
San Luis Obispo CA building $64.18 $33.20 $97.38 WD →
Santa Barbara CA highway $64.18 $33.20 $97.38 WD →
Santa Barbara CA heavy $64.18 $33.20 $97.38 WD →
Santa Barbara CA building $64.18 $33.20 $97.38 WD →
Ventura CA heavy $64.18 $33.20 $97.38 WD →
Ventura CA highway $64.18 $33.20 $97.38 WD →
Ventura CA building $64.18 $33.20 $97.38 WD →
Top-paying counties for OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 2- ASPHALT-RUBBER PLANT OPERATOR;COIL TUBING RIG OPERATOR, CONCRETE MIXER OPERATOR-SKIP TYPE; CONVEYO →