OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 2- ASPHALT-RUBBER PLANT OPERATOR;COIL TUBING RIG OPERATOR, CONCRETE MIXER OPERATOR-SKIP TYPE; CONVEYO — Prevailing Wage Rates
Davis-Bacon prevailing wages for OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 2- ASPHALT-RUBBER PLANT OPERATOR;COIL TUBING RIG OPERATOR, CONCRETE MIXER OPERATOR-SKIP TYPE; CONVEYOs across all covered states and counties. Rates vary by location and construction type.
Across 37 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 2- ASPHALT-RUBBER PLANT OPERATOR;COIL TUBING RIG OPERATOR, CONCRETE MIXER OPERATOR-SKIP TYPE; CONVEYO is $97.38/hr, with the middle 80% of counties paying between $97.38 and $97.38/hr. The highest state average is California at $97.38/hr; the lowest is California at $97.38/hr.
Range: $97.38 – $97.38/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
37 county-level rates for OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 2- ASPHALT-RUBBER PLANT OPERATOR;COIL TUBING RIG OPERATOR, CONCRETE MIXER OPERATOR-SKIP TYPE; CONVEYO, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Imperial | CA | building | $64.18 | $33.20 | $97.38 | WD → |
| Imperial | CA | highway | $64.18 | $33.20 | $97.38 | WD → |
| Imperial | CA | heavy | $64.18 | $33.20 | $97.38 | WD → |
| Inyo | CA | heavy | $64.18 | $33.20 | $97.38 | WD → |
| Inyo | CA | highway | $64.18 | $33.20 | $97.38 | WD → |
| Inyo | CA | building | $64.18 | $33.20 | $97.38 | WD → |
| Kern | CA | heavy | $64.18 | $33.20 | $97.38 | WD → |
| Kern | CA | building | $64.18 | $33.20 | $97.38 | WD → |
| Kern | CA | highway | $64.18 | $33.20 | $97.38 | WD → |
| Los Angeles | CA | heavy | $64.18 | $33.20 | $97.38 | WD → |
| Los Angeles | CA | building | $64.18 | $33.20 | $97.38 | WD → |
| Los Angeles | CA | highway | $64.18 | $33.20 | $97.38 | WD → |
| Mono | CA | heavy | $64.18 | $33.20 | $97.38 | WD → |
| Mono | CA | building | $64.18 | $33.20 | $97.38 | WD → |
| Mono | CA | highway | $64.18 | $33.20 | $97.38 | WD → |
| Orange | CA | building | $64.18 | $33.20 | $97.38 | WD → |
| Orange | CA | highway | $64.18 | $33.20 | $97.38 | WD → |
| Orange | CA | heavy | $64.18 | $33.20 | $97.38 | WD → |
| Riverside | CA | building | $64.18 | $33.20 | $97.38 | WD → |
| Riverside | CA | highway | $64.18 | $33.20 | $97.38 | WD → |
| Riverside | CA | heavy | $64.18 | $33.20 | $97.38 | WD → |
| San Bernardino | CA | highway | $64.18 | $33.20 | $97.38 | WD → |
| San Bernardino | CA | building | $64.18 | $33.20 | $97.38 | WD → |
| San Bernardino | CA | heavy | $64.18 | $33.20 | $97.38 | WD → |
| San Diego | CA | building | $64.18 | $33.20 | $97.38 | WD → |
| San Diego | CA | residential | $64.18 | $33.20 | $97.38 | WD → |
| San Diego | CA | highway | $64.18 | $33.20 | $97.38 | WD → |
| San Diego | CA | heavy | $64.18 | $33.20 | $97.38 | WD → |
| San Luis Obispo | CA | highway | $64.18 | $33.20 | $97.38 | WD → |
| San Luis Obispo | CA | heavy | $64.18 | $33.20 | $97.38 | WD → |
| San Luis Obispo | CA | building | $64.18 | $33.20 | $97.38 | WD → |
| Santa Barbara | CA | highway | $64.18 | $33.20 | $97.38 | WD → |
| Santa Barbara | CA | heavy | $64.18 | $33.20 | $97.38 | WD → |
| Santa Barbara | CA | building | $64.18 | $33.20 | $97.38 | WD → |
| Ventura | CA | heavy | $64.18 | $33.20 | $97.38 | WD → |
| Ventura | CA | highway | $64.18 | $33.20 | $97.38 | WD → |
| Ventura | CA | building | $64.18 | $33.20 | $97.38 | WD → |