LABORER GROUP 3 BUGGYMOBILE PERSON; CONCRETE CUTTING TORCH; CONCRETE PILE CUTTER; DRILLER, JACKHAMMER, 2-1/2 FT. DRILL STEEL OR LONGER; DRI-PAK-IT MAC — Prevailing Wage Rates
Davis-Bacon prevailing wages for LABORER GROUP 3 BUGGYMOBILE PERSON; CONCRETE CUTTING TORCH; CONCRETE PILE CUTTER; DRILLER, JACKHAMMER, 2-1/2 FT. DRILL STEEL OR LONGER; DRI-PAK-IT MACs across all covered states and counties. Rates vary by location and construction type.
Across 31 Davis-Bacon rate records nationwide, the median total package (base + fringe) for LABORER GROUP 3 BUGGYMOBILE PERSON; CONCRETE CUTTING TORCH; CONCRETE PILE CUTTER; DRILLER, JACKHAMMER, 2-1/2 FT. DRILL STEEL OR LONGER; DRI-PAK-IT MAC is $63.63/hr, with the middle 80% of counties paying between $56.43 and $73.53/hr. The highest state average is California at $66.56/hr; the lowest is California at $66.56/hr.
Range: $56.43 – $73.53/hr across 1 state. Total package = base hourly rate + fringe benefits.
Davis-Bacon vs. Market Median
Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2061 — Construction Laborers.
Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.
Average Rates by State
All Rates
31 county-level rates for LABORER GROUP 3 BUGGYMOBILE PERSON; CONCRETE CUTTING TORCH; CONCRETE PILE CUTTER; DRILLER, JACKHAMMER, 2-1/2 FT. DRILL STEEL OR LONGER; DRI-PAK-IT MAC, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Imperial | CA | heavy | $47.58 | $25.95 | $73.53 | WD → |
| Imperial | CA | residential | $36.34 | $20.09 | $56.43 | WD → |
| Imperial | CA | residential | $40.33 | $23.30 | $63.63 | WD → |
| Imperial | CA | building | $47.58 | $25.95 | $73.53 | WD → |
| Imperial | CA | highway | $47.58 | $25.95 | $73.53 | WD → |
| Inyo | CA | heavy | $47.58 | $25.95 | $73.53 | WD → |
| Inyo | CA | highway | $47.58 | $25.95 | $73.53 | WD → |
| Inyo | CA | building | $47.58 | $25.95 | $73.53 | WD → |
| Kern | CA | heavy | $47.58 | $25.95 | $73.53 | WD → |
| Kern | CA | highway | $47.58 | $25.95 | $73.53 | WD → |
| Kern | CA | building | $47.58 | $25.95 | $73.53 | WD → |
| Los Angeles | CA | residential | $36.34 | $20.09 | $56.43 | WD → |
| Los Angeles | CA | residential | $40.33 | $23.30 | $63.63 | WD → |
| Mono | CA | highway | $47.58 | $25.95 | $73.53 | WD → |
| Mono | CA | heavy | $47.58 | $25.95 | $73.53 | WD → |
| Mono | CA | building | $47.58 | $25.95 | $73.53 | WD → |
| Orange | CA | residential | $40.33 | $23.30 | $63.63 | WD → |
| Orange | CA | residential | $36.34 | $20.09 | $56.43 | WD → |
| Riverside | CA | highway | $47.58 | $25.95 | $73.53 | WD → |
| Riverside | CA | residential | $36.34 | $20.09 | $56.43 | WD → |
| Riverside | CA | residential | $40.33 | $23.30 | $63.63 | WD → |
| Riverside | CA | building | $47.58 | $25.95 | $73.53 | WD → |
| Riverside | CA | heavy | $47.58 | $25.95 | $73.53 | WD → |
| San Bernardino | CA | residential | $40.33 | $23.30 | $63.63 | WD → |
| San Bernardino | CA | residential | $36.34 | $20.09 | $56.43 | WD → |
| San Luis Obispo | CA | residential | $40.33 | $23.30 | $63.63 | WD → |
| San Luis Obispo | CA | residential | $36.34 | $20.09 | $56.43 | WD → |
| Santa Barbara | CA | residential | $40.33 | $23.30 | $63.63 | WD → |
| Santa Barbara | CA | residential | $36.34 | $20.09 | $56.43 | WD → |
| Ventura | CA | residential | $40.33 | $23.30 | $63.63 | WD → |
| Ventura | CA | residential | $36.34 | $20.09 | $56.43 | WD → |