ELECTRICIAN CABLE SPLICER: $1.50 ABOVE ELECTRICIAN. TUNNEL WORK: 10% ABOVE ELECTRICIAN. ZONE PAY: ZONE A - 80 ROAD MILES FROM POST OFFICE, 455 ORANGE — Prevailing Wage Rates
Davis-Bacon prevailing wages for ELECTRICIAN CABLE SPLICER: $1.50 ABOVE ELECTRICIAN. TUNNEL WORK: 10% ABOVE ELECTRICIAN. ZONE PAY: ZONE A - 80 ROAD MILES FROM POST OFFICE, 455 ORANGEs across all covered states and counties. Rates vary by location and construction type.
Across 9 Davis-Bacon rate records nationwide, the median total package (base + fringe) for ELECTRICIAN CABLE SPLICER: $1.50 ABOVE ELECTRICIAN. TUNNEL WORK: 10% ABOVE ELECTRICIAN. ZONE PAY: ZONE A - 80 ROAD MILES FROM POST OFFICE, 455 ORANGE is $82.22/hr, with the middle 80% of counties paying between $82.22 and $82.22/hr. The highest state average is California at $82.22/hr; the lowest is California at $82.22/hr.
Range: $82.22 – $82.22/hr across 1 state. Total package = base hourly rate + fringe benefits.
Davis-Bacon vs. Market Median
Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2111 — Electricians.
Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.
Average Rates by State
All Rates
9 county-level rates for ELECTRICIAN CABLE SPLICER: $1.50 ABOVE ELECTRICIAN. TUNNEL WORK: 10% ABOVE ELECTRICIAN. ZONE PAY: ZONE A - 80 ROAD MILES FROM POST OFFICE, 455 ORANGE, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Inyo | CA | highway | $53.15 | $29.07 | $82.22 | WD → |
| Inyo | CA | heavy | $53.15 | $29.07 | $82.22 | WD → |
| Inyo | CA | building | $53.15 | $29.07 | $82.22 | WD → |
| Kern | CA | heavy | $53.15 | $29.07 | $82.22 | WD → |
| Kern | CA | building | $53.15 | $29.07 | $82.22 | WD → |
| Kern | CA | highway | $53.15 | $29.07 | $82.22 | WD → |
| Mono | CA | highway | $53.15 | $29.07 | $82.22 | WD → |
| Mono | CA | heavy | $53.15 | $29.07 | $82.22 | WD → |
| Mono | CA | building | $53.15 | $29.07 | $82.22 | WD → |