OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 13 Crane operator; Derrick barge operator; Helicopter pilot; Hoist operator, stiff le — Prevailing Wage Rates
Davis-Bacon prevailing wages for OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 13 Crane operator; Derrick barge operator; Helicopter pilot; Hoist operator, stiff les across all covered states and counties. Rates vary by location and construction type.
Across 33 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 13 Crane operator; Derrick barge operator; Helicopter pilot; Hoist operator, stiff le is $103.95/hr, with the middle 80% of counties paying between $103.95 and $103.95/hr. The highest state average is California at $103.95/hr; the lowest is California at $103.95/hr.
Range: $103.95 – $103.95/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
33 county-level rates for OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 13 Crane operator; Derrick barge operator; Helicopter pilot; Hoist operator, stiff le, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Imperial | CA | building | $70.75 | $33.20 | $103.95 | WD → |
| Imperial | CA | highway | $70.75 | $33.20 | $103.95 | WD → |
| Imperial | CA | heavy | $70.75 | $33.20 | $103.95 | WD → |
| Inyo | CA | highway | $70.75 | $33.20 | $103.95 | WD → |
| Inyo | CA | building | $70.75 | $33.20 | $103.95 | WD → |
| Inyo | CA | heavy | $70.75 | $33.20 | $103.95 | WD → |
| Kern | CA | highway | $70.75 | $33.20 | $103.95 | WD → |
| Kern | CA | building | $70.75 | $33.20 | $103.95 | WD → |
| Kern | CA | heavy | $70.75 | $33.20 | $103.95 | WD → |
| Los Angeles | CA | building | $70.75 | $33.20 | $103.95 | WD → |
| Los Angeles | CA | highway | $70.75 | $33.20 | $103.95 | WD → |
| Los Angeles | CA | heavy | $70.75 | $33.20 | $103.95 | WD → |
| Mono | CA | building | $70.75 | $33.20 | $103.95 | WD → |
| Mono | CA | heavy | $70.75 | $33.20 | $103.95 | WD → |
| Mono | CA | highway | $70.75 | $33.20 | $103.95 | WD → |
| Orange | CA | heavy | $70.75 | $33.20 | $103.95 | WD → |
| Orange | CA | highway | $70.75 | $33.20 | $103.95 | WD → |
| Orange | CA | building | $70.75 | $33.20 | $103.95 | WD → |
| Riverside | CA | building | $70.75 | $33.20 | $103.95 | WD → |
| Riverside | CA | highway | $70.75 | $33.20 | $103.95 | WD → |
| Riverside | CA | heavy | $70.75 | $33.20 | $103.95 | WD → |
| San Bernardino | CA | highway | $70.75 | $33.20 | $103.95 | WD → |
| San Bernardino | CA | building | $70.75 | $33.20 | $103.95 | WD → |
| San Bernardino | CA | heavy | $70.75 | $33.20 | $103.95 | WD → |
| San Luis Obispo | CA | building | $70.75 | $33.20 | $103.95 | WD → |
| San Luis Obispo | CA | highway | $70.75 | $33.20 | $103.95 | WD → |
| San Luis Obispo | CA | heavy | $70.75 | $33.20 | $103.95 | WD → |
| Santa Barbara | CA | highway | $70.75 | $33.20 | $103.95 | WD → |
| Santa Barbara | CA | heavy | $70.75 | $33.20 | $103.95 | WD → |
| Santa Barbara | CA | building | $70.75 | $33.20 | $103.95 | WD → |
| Ventura | CA | heavy | $70.75 | $33.20 | $103.95 | WD → |
| Ventura | CA | highway | $70.75 | $33.20 | $103.95 | WD → |
| Ventura | CA | building | $70.75 | $33.20 | $103.95 | WD → |