OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 16- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM; RUBBER-T — Prevailing Wage Rates
Davis-Bacon prevailing wages for OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 16- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM; RUBBER-Ts across all covered states and counties. Rates vary by location and construction type.
Across 37 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 16- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM; RUBBER-T is $100.11/hr, with the middle 80% of counties paying between $100.11 and $100.11/hr. The highest state average is California at $100.11/hr; the lowest is California at $100.11/hr.
Range: $100.11 – $100.11/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
37 county-level rates for OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 16- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM; RUBBER-T, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Imperial | CA | building | $66.91 | $33.20 | $100.11 | WD → |
| Imperial | CA | highway | $66.91 | $33.20 | $100.11 | WD → |
| Imperial | CA | heavy | $66.91 | $33.20 | $100.11 | WD → |
| Inyo | CA | heavy | $66.91 | $33.20 | $100.11 | WD → |
| Inyo | CA | highway | $66.91 | $33.20 | $100.11 | WD → |
| Inyo | CA | building | $66.91 | $33.20 | $100.11 | WD → |
| Kern | CA | heavy | $66.91 | $33.20 | $100.11 | WD → |
| Kern | CA | building | $66.91 | $33.20 | $100.11 | WD → |
| Kern | CA | highway | $66.91 | $33.20 | $100.11 | WD → |
| Los Angeles | CA | heavy | $66.91 | $33.20 | $100.11 | WD → |
| Los Angeles | CA | building | $66.91 | $33.20 | $100.11 | WD → |
| Los Angeles | CA | highway | $66.91 | $33.20 | $100.11 | WD → |
| Mono | CA | heavy | $66.91 | $33.20 | $100.11 | WD → |
| Mono | CA | building | $66.91 | $33.20 | $100.11 | WD → |
| Mono | CA | highway | $66.91 | $33.20 | $100.11 | WD → |
| Orange | CA | building | $66.91 | $33.20 | $100.11 | WD → |
| Orange | CA | highway | $66.91 | $33.20 | $100.11 | WD → |
| Orange | CA | heavy | $66.91 | $33.20 | $100.11 | WD → |
| Riverside | CA | building | $66.91 | $33.20 | $100.11 | WD → |
| Riverside | CA | highway | $66.91 | $33.20 | $100.11 | WD → |
| Riverside | CA | heavy | $66.91 | $33.20 | $100.11 | WD → |
| San Bernardino | CA | highway | $66.91 | $33.20 | $100.11 | WD → |
| San Bernardino | CA | building | $66.91 | $33.20 | $100.11 | WD → |
| San Bernardino | CA | heavy | $66.91 | $33.20 | $100.11 | WD → |
| San Diego | CA | building | $66.91 | $33.20 | $100.11 | WD → |
| San Diego | CA | residential | $66.91 | $33.20 | $100.11 | WD → |
| San Diego | CA | highway | $66.91 | $33.20 | $100.11 | WD → |
| San Diego | CA | heavy | $66.91 | $33.20 | $100.11 | WD → |
| San Luis Obispo | CA | highway | $66.91 | $33.20 | $100.11 | WD → |
| San Luis Obispo | CA | heavy | $66.91 | $33.20 | $100.11 | WD → |
| San Luis Obispo | CA | building | $66.91 | $33.20 | $100.11 | WD → |
| Santa Barbara | CA | highway | $66.91 | $33.20 | $100.11 | WD → |
| Santa Barbara | CA | heavy | $66.91 | $33.20 | $100.11 | WD → |
| Santa Barbara | CA | building | $66.91 | $33.20 | $100.11 | WD → |
| Ventura | CA | heavy | $66.91 | $33.20 | $100.11 | WD → |
| Ventura | CA | highway | $66.91 | $33.20 | $100.11 | WD → |
| Ventura | CA | building | $66.91 | $33.20 | $100.11 | WD → |