OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 17- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM; TANDEM T — Prevailing Wage Rates

Davis-Bacon prevailing wages for OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 17- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM; TANDEM Ts across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 37 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 17- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM; TANDEM T is $100.28/hr, with the middle 80% of counties paying between $100.28 and $100.28/hr. The highest state average is California at $100.28/hr; the lowest is California at $100.28/hr.

Bottom 10%
$100.28
Median
$100.28
Average
$100.28
Top 10%
$100.28

Range: $100.28 – $100.28/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

California CA
Avg base: $67.08/hr
Avg total: $100.28/hr
37 rates

All Rates

37 county-level rates for OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 17- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM; TANDEM T, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Imperial CA building $67.08 $33.20 $100.28 WD →
Imperial CA highway $67.08 $33.20 $100.28 WD →
Imperial CA heavy $67.08 $33.20 $100.28 WD →
Inyo CA heavy $67.08 $33.20 $100.28 WD →
Inyo CA highway $67.08 $33.20 $100.28 WD →
Inyo CA building $67.08 $33.20 $100.28 WD →
Kern CA heavy $67.08 $33.20 $100.28 WD →
Kern CA building $67.08 $33.20 $100.28 WD →
Kern CA highway $67.08 $33.20 $100.28 WD →
Los Angeles CA heavy $67.08 $33.20 $100.28 WD →
Los Angeles CA building $67.08 $33.20 $100.28 WD →
Los Angeles CA highway $67.08 $33.20 $100.28 WD →
Mono CA heavy $67.08 $33.20 $100.28 WD →
Mono CA building $67.08 $33.20 $100.28 WD →
Mono CA highway $67.08 $33.20 $100.28 WD →
Orange CA building $67.08 $33.20 $100.28 WD →
Orange CA highway $67.08 $33.20 $100.28 WD →
Orange CA heavy $67.08 $33.20 $100.28 WD →
Riverside CA building $67.08 $33.20 $100.28 WD →
Riverside CA highway $67.08 $33.20 $100.28 WD →
Riverside CA heavy $67.08 $33.20 $100.28 WD →
San Bernardino CA highway $67.08 $33.20 $100.28 WD →
San Bernardino CA building $67.08 $33.20 $100.28 WD →
San Bernardino CA heavy $67.08 $33.20 $100.28 WD →
San Diego CA building $67.08 $33.20 $100.28 WD →
San Diego CA residential $67.08 $33.20 $100.28 WD →
San Diego CA highway $67.08 $33.20 $100.28 WD →
San Diego CA heavy $67.08 $33.20 $100.28 WD →
San Luis Obispo CA highway $67.08 $33.20 $100.28 WD →
San Luis Obispo CA heavy $67.08 $33.20 $100.28 WD →
San Luis Obispo CA building $67.08 $33.20 $100.28 WD →
Santa Barbara CA highway $67.08 $33.20 $100.28 WD →
Santa Barbara CA heavy $67.08 $33.20 $100.28 WD →
Santa Barbara CA building $67.08 $33.20 $100.28 WD →
Ventura CA heavy $67.08 $33.20 $100.28 WD →
Ventura CA highway $67.08 $33.20 $100.28 WD →
Ventura CA building $67.08 $33.20 $100.28 WD →
Top-paying counties for OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 17- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM; TANDEM T →