PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTRO NAVAL FACILITY, FORT IRWIN, MARINE COR — Prevailing Wage Rates
Davis-Bacon prevailing wages for PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTRO NAVAL FACILITY, FORT IRWIN, MARINE CORs across all covered states and counties. Rates vary by location and construction type.
Across 33 Davis-Bacon rate records nationwide, the median total package (base + fringe) for PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTRO NAVAL FACILITY, FORT IRWIN, MARINE COR is $77.81/hr, with the middle 80% of counties paying between $77.81 and $77.81/hr. The highest state average is California at $77.81/hr; the lowest is California at $77.81/hr.
Range: $77.81 – $77.81/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
33 county-level rates for PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTRO NAVAL FACILITY, FORT IRWIN, MARINE COR, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Imperial | CA | building | $42.12 | $35.69 | $77.81 | WD → |
| Imperial | CA | highway | $42.12 | $35.69 | $77.81 | WD → |
| Imperial | CA | heavy | $42.12 | $35.69 | $77.81 | WD → |
| Inyo | CA | highway | $42.12 | $35.69 | $77.81 | WD → |
| Inyo | CA | building | $42.12 | $35.69 | $77.81 | WD → |
| Inyo | CA | heavy | $42.12 | $35.69 | $77.81 | WD → |
| Kern | CA | highway | $42.12 | $35.69 | $77.81 | WD → |
| Kern | CA | building | $42.12 | $35.69 | $77.81 | WD → |
| Kern | CA | heavy | $42.12 | $35.69 | $77.81 | WD → |
| Los Angeles | CA | building | $42.12 | $35.69 | $77.81 | WD → |
| Los Angeles | CA | highway | $42.12 | $35.69 | $77.81 | WD → |
| Los Angeles | CA | heavy | $42.12 | $35.69 | $77.81 | WD → |
| Mono | CA | building | $42.12 | $35.69 | $77.81 | WD → |
| Mono | CA | heavy | $42.12 | $35.69 | $77.81 | WD → |
| Mono | CA | highway | $42.12 | $35.69 | $77.81 | WD → |
| Orange | CA | heavy | $42.12 | $35.69 | $77.81 | WD → |
| Orange | CA | highway | $42.12 | $35.69 | $77.81 | WD → |
| Orange | CA | building | $42.12 | $35.69 | $77.81 | WD → |
| Riverside | CA | building | $42.12 | $35.69 | $77.81 | WD → |
| Riverside | CA | highway | $42.12 | $35.69 | $77.81 | WD → |
| Riverside | CA | heavy | $42.12 | $35.69 | $77.81 | WD → |
| San Bernardino | CA | highway | $42.12 | $35.69 | $77.81 | WD → |
| San Bernardino | CA | building | $42.12 | $35.69 | $77.81 | WD → |
| San Bernardino | CA | heavy | $42.12 | $35.69 | $77.81 | WD → |
| San Luis Obispo | CA | building | $42.12 | $35.69 | $77.81 | WD → |
| San Luis Obispo | CA | highway | $42.12 | $35.69 | $77.81 | WD → |
| San Luis Obispo | CA | heavy | $42.12 | $35.69 | $77.81 | WD → |
| Santa Barbara | CA | highway | $42.12 | $35.69 | $77.81 | WD → |
| Santa Barbara | CA | heavy | $42.12 | $35.69 | $77.81 | WD → |
| Santa Barbara | CA | building | $42.12 | $35.69 | $77.81 | WD → |
| Ventura | CA | heavy | $42.12 | $35.69 | $77.81 | WD → |
| Ventura | CA | highway | $42.12 | $35.69 | $77.81 | WD → |
| Ventura | CA | building | $42.12 | $35.69 | $77.81 | WD → |