Wage Determination CA20260002-16352-bld

Imperial, CA · building · Rev. 3 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination CA20260002-16352-bld covers 135 trade classifications for building construction in Imperial, CA. Total packages (base + fringe) range from $32.72/hr to $116.01/hr, with the highest going to DIVER (WET). Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: CA20260002-16352-bld
Revision: 3
Type: building
County: Imperial
State: CA
Effective: May 17, 2026
Trades covered: 135
Highest rate: $116.01/hr
Official source: SAM.gov reference CA20260002View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ABOVE THE 75'-0"" LEVEL SHALL BE COMPENSATED FOR AT 35 CENTS PER HOUR ABOVE THE APPLICABLE CLASSIFICATION WAGE RATE $55.88 $23.77 $79.65 $0.00 $0.00 $0.00 $0.00
ASBESTOS REMOVAL LABORER SCOPE OF WORK: INCLUDES SITE MOBILIZATION, INITIAL SITE CLEANUP, SITE PREPARATION, REMOVAL OF ASBESTOS-CONTAINING MATERIAL AN $46.48 $25.93 $72.41 $0.00 $0.00 $0.00 $0.00
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER $23.52 $13.37 $36.89 $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKERS/INSULATOR $56.32 $26.52 $82.84 $0.00 $0.00 $0.00 $0.00
BRICK TENDER $42.60 $22.13 $64.73 $0.00 $0.00 $0.00 $0.00
BRICKLAYER; MARBLE SETTER $58.81 $19.14 $77.95 $0.00 $0.00 $0.00 $0.00
CARPENTER: CARPENTER, CABINET INSTALLER, INSULATION INSTALLER, HARDWOOD FLOOR WORKER AND ACOUSTICAL INSTALLER FOOTNOTE: WORK OF FORMING IN THE CONSTRU $52.24 $26.18 $78.42 $0.00 $0.00 $0.00 $0.00
CARPENTER: MILLWRIGHT FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGING IS U $52.24 $26.68 $78.92 $0.00 $0.00 $0.00 $0.00
CARPENTER: PILEDRIVERMEN/DERRICK BARGEMAN, BRIDGE OR DOCK CARPENTER, HEAVY FRAMER, ROCK BARGEMAN OR SCOWMAN, ROCKSLINGER, SHINGLER FOOTNOTE: WORK OF F $52.37 $26.18 $78.55 $0.00 $0.00 $0.00 $0.00
CARPENTER: PNEUMATIC NAILER, POWER STAPLER FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HO $52.37 $26.18 $78.55 $0.00 $0.00 $0.00 $0.00
CARPENTER: SAWFILER FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGING IS USE $52.34 $26.18 $78.52 $0.00 $0.00 $0.00 $0.00
CARPENTER: SCAFFOLD BUILDER FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGIN $45.37 $25.43 $70.80 $0.00 $0.00 $0.00 $0.00
CARPENTER: TABLE POWER SAW OPERATOR FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTA $52.34 $26.18 $78.52 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $47.70 $27.07 $74.77 $0.00 $0.00 $0.00 $0.00
CENTS PER HOUR ABOVE THE APPLICABLE CLASSIFICATION WAGE RATE $51.39 $23.77 $75.16 $0.00 $0.00 $0.00 $0.00
CENTS PER HOUR ABOVE THE APPLICABLE CLASSIFICATION WAGE RATE $54.93 $23.77 $78.70 $0.00 $0.00 $0.00 $0.00
CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR. OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 25- CONCRETE PUMP OPERATOR-TRUCK MOUNTED; RUBBER-TIRE $67.91 $33.20 $101.11 $0.00 $0.00 $0.00 $0.00
DIVER (ASSISTANT TENDER) $52.37 $3.27 $55.64 $0.00 $0.00 $0.00 $0.00
DIVER (STANDBY) $56.37 $3.27 $59.64 $0.00 $0.00 $0.00 $0.00
DIVER (TENDER) $55.37 $3.27 $58.64 $0.00 $0.00 $0.00 $0.00
DIVER (WET) $112.74 $3.27 $116.01 $0.00 $0.00 $0.00 $0.00
DRYWALL $21.45 $11.27 $32.72 $0.00 $0.00 $0.00 $0.00
DRYWALL $52.24 $26.18 $78.42 $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $49.33 $26.82 $76.15 $0.00 $0.00 $0.00 $0.00
ELECTRICIANS: CABLE SPLICER $54.36 $16.51 $70.87 $0.00 $0.00 $0.00 $0.00
ELECTRICIANS: CABLE SPLICER $48.40 $16.33 $64.73 $0.00 $0.00 $0.00 $0.00
ELECTRICIANS: CABLE SPLICER $57.36 $16.60 $73.96 $0.00 $0.00 $0.00 $0.00
ELECTRICIANS: CABLE SPLICER $51.40 $16.42 $67.82 $0.00 $0.00 $0.00 $0.00
ELECTRICIANS: ELECTRICIAN $53.61 $16.49 $70.10 $0.00 $0.00 $0.00 $0.00
ELECTRICIANS: ELECTRICIAN $47.65 $16.31 $63.96 $0.00 $0.00 $0.00 $0.00
ELECTRICIANS: ELECTRICIAN $56.61 $16.58 $73.19 $0.00 $0.00 $0.00 $0.00
ELECTRICIANS: ELECTRICIAN $50.65 $16.40 $67.05 $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC FOOTNOTE: A. PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEA $69.43 $38.44 $107.87 $0.00 $0.00 $0.00 $0.00
EQUIPMENT OPERATOR, TOWER CRANE REPAIRMAN; TRACTOR LOADER OPERATOR; WOODS MIXER OPERATOR PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIP $66.41 $33.20 $99.61 $0.00 $0.00 $0.00 $0.00
FIRE STOP TECHNICIAN $39.94 $20.65 $60.59 $0.00 $0.00 $0.00 $0.00
GLAZIER $52.90 $22.16 $75.06 $0.00 $0.00 $0.00 $0.00
HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEEL $67.18 $33.20 $100.38 $0.00 $0.00 $0.00 $0.00
IRONWORKER.$ 50.70 35.15 IRONWORKER $45.78 $26.51 $72.29 $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1 CLEANING AND HANDLING OF PANEL FORMS; CONCRETE SCREEDING FOR ROUGH STRIKE-OFF; CONCRETE, WATER CURING; DEMOLITION LABORER, THE CLEANIN $46.48 $25.95 $72.43 $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 ASPHALT SHOVELER; CEMENT DUMPER; CESSPOOL DIGGER AND INSTALLER; CHUCKTENDER; CHUTE HANDLER, POURING CONCRETE, THE HANDLING OF THE CHUT $47.03 $25.95 $72.98 $0.00 $0.00 $0.00 $0.00
LABORER GROUP 3 BUGGYMOBILE PERSON; CONCRETE CUTTING TORCH; CONCRETE PILE CUTTER; DRILLER, JACKHAMMER, 2-1/2 FT. DRILL STEEL OR LONGER; DRI-PAK-IT MAC $47.58 $25.95 $73.53 $0.00 $0.00 $0.00 $0.00
LABORER GROUP 5 BLASTER POWDER, ALL WORK OF LOADING HOLES, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE, REGARDLESS OF METHOD US $49.48 $25.95 $75.43 $0.00 $0.00 $0.00 $0.00
LABORER, TUNNEL: GROUP 1 Batch plant laborer; Changehouse person; Dump person; Dump person; Swamper; Tunnel materials handling person; Nipper; Pot ten $53.60 $25.74 $79.34 $0.00 $0.00 $0.00 $0.00
LABORER, TUNNEL: GROUP 2 Chucktender, cabletender; Loading and unloading agitator cars; Vibrator person, jack hammer, pneumatic tools; Bull gang mucke $53.92 $25.74 $79.66 $0.00 $0.00 $0.00 $0.00
LABORER, TUNNEL: GROUP 3 Blaster, driller, powder person; Chemical grout jet person; Cherry picker person; Grout gun person; Grout mixer person; Grout $54.38 $25.74 $80.12 $0.00 $0.00 $0.00 $0.00
LABORER, TUNNEL: GROUP 4 Diamond driller; Sandblaster; Shaft and raise work $55.07 $25.74 $80.81 $0.00 $0.00 $0.00 $0.00
LABORER: PLASTER CLEAN-UP LABORER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. WORK AT MILITARY BASES - $3.00 ADDITIONAL PER HOUR: CORON $46.17 $25.97 $72.14 $0.00 $0.00 $0.00 $0.00
LABORER: PLASTER TENDER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. WORK AT MILITARY BASES - $3.00 ADDITIONAL PER HOUR: CORONADO NAVAL $48.72 $25.97 $74.69 $0.00 $0.00 $0.00 $0.00
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: DRILLING CREW LABORER $47.94 $20.86 $68.80 $0.00 $0.00 $0.00 $0.00
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: ELECTRONIC TRACKING LOCATOR $51.96 $20.86 $72.82 $0.00 $0.00 $0.00 $0.00
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: HORIZONTAL DIRECTIONAL DRILL OPERATOR $49.96 $20.86 $70.82 $0.00 $0.00 $0.00 $0.00
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: VEHICLE OPERATOR/HAULER $48.11 $20.86 $68.97 $0.00 $0.00 $0.00 $0.00
LABORERS:, STRIPING/SLURRY SEAL: GROUP 1 PROTECTIVE COATING, PAVEMENT SEALING, INCLUDING REPAIR AND FILLING OF CRACKS BY ANY METHOD ON ANY SURFACE IN $49.30 $23.97 $73.27 $0.00 $0.00 $0.00 $0.00
LABORERS:, STRIPING/SLURRY SEAL: GROUP 2 TRAFFIC SURFACE ABRASIVE BLASTER; POT TENDER - REMOVAL OF ALL TRAFFIC LINES AND MARKINGS BY ANY METHOD AND PR $50.60 $23.97 $74.57 $0.00 $0.00 $0.00 $0.00
LABORERS:, STRIPING/SLURRY SEAL: GROUP 3 TRAFFIC DELINEATING DEVICE APPLICATOR: LAYOUT AND APPLICATION OF PAVEMENT MARKERS, DELINEATING SIGNS, RUMBLE $52.61 $23.97 $76.58 $0.00 $0.00 $0.00 $0.00
LABORERS:, STRIPING/SLURRY SEAL: GROUP 4 STRIPER: LAYOUT AND APPLICATION OF TRAFFIC STRIPES AND MARKINGS; HOT THERMO PLASTIC; TAPE TRAFFIC STRIPES AND $54.35 $23.97 $78.32 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: EQUIPMENT SPECIALIST (OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES, OVERHEAD & UNDERGROUND DIS $53.30 $22.26 $75.56 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DA $40.76 $21.76 $62.52 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMAN; CABLE SPLICER HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVI $70.16 $24.71 $94.87 $0.00 $0.00 $0.00 $0.00
MARBLE FINISHER $43.38 $15.36 $58.74 $0.00 $0.00 $0.00 $0.00
MODULAR FURNITURE INSTALLER $25.00 $13.06 $38.06 $0.00 $0.00 $0.00 $0.00
OPERATOR, POWER EQUIPMENT: BARGE MATE $61.34 $40.95 $102.29 $0.00 $0.00 $0.00 $0.00
OPERATOR, POWER EQUIPMENT: DECKMATE..$ 61.82 40.95 OPERATOR, POWER EQUIPMENT: DREDGE DOZER $61.93 $40.95 $102.88 $0.00 $0.00 $0.00 $0.00
OPERATOR, POWER EQUIPMENT: FIREMAN-OILER, DECKHAND, BARGEMAN, LEVEEHAND $60.73 $40.95 $101.68 $0.00 $0.00 $0.00 $0.00
OPERATOR, POWER EQUIPMENT: WINCH OPERATOR $61.27 $40.95 $102.22 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 12- AUTO GRADER OPERATOR; AUTOMATIC SLIP FORM OPERATOR; DRILLING MACHINE OPERATOR, BUCKET OR AUGER TY $66.58 $33.20 $99.78 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 13- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM PREMIUM PA $66.68 $33.20 $99.88 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 14- CANAL LINER OPERATOR; CANAL TRIMMER OPERATOR; REMOTE- CONTROL EARTH-MOVING EQUIPMENT OPERATOR; WH $66.71 $33.20 $99.91 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 15- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM; RUBBER-T $66.79 $33.20 $99.99 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 16- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM; RUBBER-T $66.91 $33.20 $100.11 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 17- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM; TANDEM T $67.08 $33.20 $100.28 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 19- ROTEX CONCRETE BELT OPERATOR; RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM $67.29 $33.20 $100.49 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 2- ASPHALT-RUBBER PLANT OPERATOR;COIL TUBING RIG OPERATOR, CONCRETE MIXER OPERATOR-SKIP TYPE; CONVEYO $64.18 $33.20 $97.38 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 2-0 RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM; RUBBER-TIRED EARTH-MOVING EQUI $67.41 $33.20 $100.61 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 21- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM PREMIUM PAY: $10.00 PER HOUR SH $67.58 $33.20 $100.78 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 22- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL SYSTE $67.68 $33.20 $100.88 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 23- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL SYSTE $67.79 $33.20 $100.99 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 3- ASPHALT-RUBBER BLEND OPERATOR; BOBCAT OR SIMILAR TYPE; EQUIPMENT GREASER; FORD FERGUSON; HELICOPTE $64.67 $33.20 $97.87 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 4- ASPHALT PLANT FIREMAN; BACKHOE OPERATOR; BORING MACHINE OPERATOR; BOXMAN OR MIXERMAN; CHIP SPREADI $65.96 $33.20 $99.16 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 6- ARTICULATING MATERIAL HAULER; ASPHALT PLANT ENGINEER; BATCH PLANT OPERATOR; BIT SHARPENER; CONCRET $66.18 $33.20 $99.38 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 1- Engineer oiler; Fork lift operator PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON A $64.75 $33.20 $97.95 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 10- Crane operator; Derrick barge operator; Hoist operator, stiff legs, Guy derrick o $67.75 $33.20 $100.95 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 11- Crane operator; Derrick barge operator; Hoist operator, stiff legs, Guy derrick o $68.75 $33.20 $101.95 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 12- Crane operator; Derrick barge operator; Hoist operator, stiff legs, Guy derrick o $69.75 $33.20 $102.95 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 13 Crane operator; Derrick barge operator; Helicopter pilot; Hoist operator, stiff le $70.75 $33.20 $103.95 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 2- Truck crane oiler PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMEN $65.53 $33.20 $98.73 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 3- A-frame or winch truck operator; Ross carrier operator PREMIUM PAY: $10.00 PER HOU $65.82 $33.20 $99.02 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 4- Bridge-type unloader and turntable operator; Helicopter hoist operator PREMIUM PAY $65.96 $33.20 $99.16 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 5 HYDRAULIC BOOM TRUCK; STINGER CRANE; TUGGER HOIST OPERATOR PREMIUM PAY: $10.00 PER $66.18 $33.20 $99.38 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 6 Bridge crane operator; Cretor crane operator; Hoist operator; Lift mobile operator $66.29 $33.20 $99.49 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 7 PEDESTAL CRANE OPERATOR; SHOVEL, BACKHOE, DRAGLINE, CLAMSHELL OPERATOR; TOWER CRANE $66.41 $33.20 $99.61 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 8 Crane operator; Crawler transporter operator; Derrick barge operator; Hoist operato $66.58 $33.20 $99.78 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 9 Crane operator; Derrick barge operator; Highline cableway operator; Hoist operator $66.75 $33.20 $99.95 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 1- Skiploader PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the fol $65.25 $33.20 $98.45 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 2- Power-driven jumbo form setter operator PREMIUM PAY: $10.00 per hour shall be paid on all Power Equip $66.03 $33.20 $99.23 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 3- Dinkey locomotive or motorperson PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Op $66.32 $33.20 $99.52 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 4- Bit sharpener; Equipment greaser; Slip form pump operator; Tugger hoist operator; Tunnel locomotive o $66.46 $33.20 $99.66 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 5- Backhoe operator; Small Ford, Case or similar; Drill doctor; Grouting machine operator; Heading shiel $66.68 $33.20 $99.88 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 6- Heavy Duty Repairman PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work $66.79 $33.20 $99.99 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 7- Tunnel mole boring machine operator PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment $66.91 $33.20 $100.11 $0.00 $0.00 $0.00 $0.00
OR COMPRESSOR PLANT OPERATOR; PUMP OPERATOR; SIGNALMAN; SWITCHMAN PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON T $63.40 $33.20 $96.60 $0.00 $0.00 $0.00 $0.00
PAINTERS: INCLUDING LEAD ABATEMENT: ALL OTHER WORK $38.52 $18.64 $57.16 $0.00 $0.00 $0.00 $0.00
PLASTERER WORK AT NAVAL AIR FACILITY SEELEY: $3.00 ADDITIONAL PER HOUR $47.37 $19.64 $67.01 $0.00 $0.00 $0.00 $0.00
PLUMBER $48.84 $23.58 $72.42 $0.00 $0.00 $0.00 $0.00
PLUMBER $44.75 $26.20 $70.95 $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER $44.29 $24.16 $68.45 $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER $72.23 $26.81 $99.04 $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER $61.73 $26.81 $88.54 $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER: WORK ONLY ON NEW ADDITIONS AND REMODELING OF BARS, RESTAURANTS, STORES AND COMMERCIAL BUILDINGS, NOT TO EXCEED 5,000 SQ. FT. OF FL $59.85 $25.83 $85.68 $0.00 $0.00 $0.00 $0.00
PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTRO NAVAL FACILITY, FORT IRWIN, MARINE COR $42.12 $35.69 $77.81 $0.00 $0.00 $0.00 $0.00
ROOFER $42.80 $12.64 $55.44 $0.00 $0.00 $0.00 $0.00
SHEET METAL TECHNICIAN SHEET METAL TECHNICIAN - SCOPE: LIGHT COMMERCIAL WORK: ANY SHEET METAL, HEATING AND AIR CONDITIONING WORK PERFORMED ON A PROJEC $38.65 $10.31 $48.96 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER SHEET METAL TECHNICIAN - SCOPE: LIGHT COMMERCIAL WORK: ANY SHEET METAL, HEATING AND AIR CONDITIONING WORK PERFORMED ON A PROJECT WH $51.45 $30.92 $82.37 $0.00 $0.00 $0.00 $0.00
SOFT FLOOR LAYER $40.77 $19.37 $60.14 $0.00 $0.00 $0.00 $0.00
SOUND & COMMUNICATIONS: SOUND TECHNICIAN SOUND TECHNICIAN: TERMINATING, OPERATING AND PERFORMING FINAL CHECK-OUT SCOPE OF WORK: ASSEMBLY, INSTALLATION $43.78 $15.39 $59.17 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $50.79 $29.80 $80.59 $0.00 $0.00 $0.00 $0.00
TERRAZZO FINISHER $42.11 $14.67 $56.78 $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER/SETTER $49.62 $15.26 $64.88 $0.00 $0.00 $0.00 $0.00
TILE FINISHER $37.96 $13.77 $51.73 $0.00 $0.00 $0.00 $0.00
TILE LAYER $51.82 $19.32 $71.14 $0.00 $0.00 $0.00 $0.00
TO THE FORM OF MOTIVE POWER; TOXIC WASTE REMOVAL LABORER GROUP 4 ASPHALT RAKER, LUTE PERSON, IRONER, ASPHALT DUMP PERSON, AND ASPHALT SPREADER BOXES $49.13 $25.95 $75.08 $0.00 $0.00 $0.00 $0.00
TRAFFIC SIGNAL, STREET LIGHT AND UNDERGROUND WORK: UTILITY TECHNICIAN #1 WORK ON STREET LIGHTING; TRAFFIC SIGNALS; AND UNDERGROUND SYSTEMS AND/OR ESTA $43.62 $14.41 $58.03 $0.00 $0.00 $0.00 $0.00
TRAFFIC SIGNAL, STREET LIGHT AND UNDERGROUND WORK: UTILITY TECHNICIAN #2 WORK ON STREET LIGHTING; TRAFFIC SIGNALS; AND UNDERGROUND SYSTEMS AND/OR ESTA $33.10 $14.09 $47.19 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 1 TRUCK DRIVER WORK ON ALL MILITARY BASES: PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE $41.59 $35.69 $77.28 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 10 DUMP TRUCK - 50 YDS. OR MORE WATER LEVEL; WATER PULL - SINGLE ENGINE WITH ATTACHMENT WORK ON ALL MILITARY BASES: PREMIUM PAY: $3 $43.12 $35.69 $78.81 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 11 WATER PULL - TWIN ENGINE; WATER PULL - TWIN ENGINE WITH ATTACHMENTS; WINCH TRUCK DRIVER - $1.25 ADDITIONAL WHEN OPERATING WINCH $43.62 $35.69 $79.31 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 12 BOOM TRUCK 17K AND ABOVE WORK ON ALL MILITARY BASES: PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS $44.05 $35.69 $79.74 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 2 DRIVER OF VEHICLE OR COMBINATION OF VEHICLES - 2 AXLES; TRAFFIC CONTROL PILOT CAR EXCLUDING MOVING HEAVY EQUIPMENT PERMIT LOAD; T $41.74 $35.69 $77.43 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 3 DRIVER OF VEHICLE OR COMBINATION OF VEHICLES - 3 AXLES; BOOT PERSON; CEMENT MASON DISTRIBUTION TRUCK; FUEL TRUCK DRIVER; WATER TR $41.87 $35.69 $77.56 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 5 WATER TRUCK, 3 OR MORE AXLES; TRUCK GREASER AND TIRE PERSON; PIPELINE AND UTILITY WORKING TRUCK DRIVER, INCLUDING WINCH TRUCK AND $42.09 $35.69 $77.78 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 7 $42.37 $35.69 $78.06 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 8 DUMP TRUCK, 25 YDS. TO 49 YDS. WATER LEVEL; TRUCK REPAIR PERSON; WATER PULL - SINGLE ENGINE; WELDER WORK ON ALL MILITARY BASES: P $42.62 $35.69 $78.31 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 9 TRUCK REPAIR PERSON/WELDER; LOW BED DRIVER, 9 AXLES OR OVER WORK ON ALL MILITARY BASES: PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [ $42.82 $35.69 $78.51 $0.00 $0.00 $0.00 $0.00
TYPES; CABLE BUNDLING MACHINE OPERATOR; CABLE TRENCHING MACHINE OPERATOR CAST-IN-PLACE PIPE LAYING MACHINE OPERATOR; COMBINATION MIXER AND COMPRESSOR $66.29 $33.20 $99.49 $0.00 $0.00 $0.00 $0.00
WATER LEVEL WORK ON ALL MILITARY BASES: PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTR $42.06 $35.69 $77.75 $0.00 $0.00 $0.00 $0.00
View all WDs for Imperial → Revision history →