ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER — Prevailing Wage Rates

Davis-Bacon prevailing wages for ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLERs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 67 Davis-Bacon rate records nationwide, the median total package (base + fringe) for ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER is $36.89/hr, with the middle 80% of counties paying between $36.89 and $84.03/hr. The highest state average is Wisconsin at $82.17/hr; the lowest is California at $39.32/hr.

Bottom 10%
$36.89
Median
$36.89
Average
$52.75
Top 10%
$84.03

Range: $36.89 – $89.37/hr across 2 states. Total package = base hourly rate + fringe benefits.

Average Rates by State

California CA
Avg base: $26.08/hr
Avg total: $39.32/hr
46 rates
Wisconsin WI
Avg base: $47.66/hr
Avg total: $82.17/hr
21 rates

All Rates

67 county-level rates for ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Del Norte CA highway $35.31 $12.75 $48.06 WD →
Del Norte CA heavy $35.31 $12.75 $48.06 WD →
Humboldt CA heavy $35.31 $12.75 $48.06 WD →
Humboldt CA highway $35.31 $12.75 $48.06 WD →
Imperial CA residential $23.52 $13.37 $36.89 WD →
Imperial CA highway $23.52 $13.37 $36.89 WD →
Imperial CA heavy $23.52 $13.37 $36.89 WD →
Imperial CA building $23.52 $13.37 $36.89 WD →
Lake CA highway $35.31 $12.75 $48.06 WD →
Lake CA heavy $35.31 $12.75 $48.06 WD →
Los Angeles CA residential $23.52 $13.37 $36.89 WD →
Los Angeles CA heavy $23.52 $13.37 $36.89 WD →
Los Angeles CA building $23.52 $13.37 $36.89 WD →
Los Angeles CA highway $23.52 $13.37 $36.89 WD →
Mendocino CA heavy $35.31 $12.75 $48.06 WD →
Mendocino CA highway $35.31 $12.75 $48.06 WD →
Orange CA building $23.52 $13.37 $36.89 WD →
Orange CA residential $23.52 $13.37 $36.89 WD →
Orange CA highway $23.52 $13.37 $36.89 WD →
Orange CA heavy $23.52 $13.37 $36.89 WD →
Riverside CA building $23.52 $13.37 $36.89 WD →
Riverside CA residential $23.52 $13.37 $36.89 WD →
Riverside CA highway $23.52 $13.37 $36.89 WD →
Riverside CA heavy $23.52 $13.37 $36.89 WD →
San Bernardino CA residential $23.52 $13.37 $36.89 WD →
San Bernardino CA highway $23.52 $13.37 $36.89 WD →
San Bernardino CA building $23.52 $13.37 $36.89 WD →
San Bernardino CA heavy $23.52 $13.37 $36.89 WD →
San Diego CA building $23.52 $13.37 $36.89 WD →
San Diego CA highway $23.52 $13.37 $36.89 WD →
San Diego CA residential $23.52 $13.37 $36.89 WD →
San Diego CA heavy $23.52 $13.37 $36.89 WD →
San Luis Obispo CA building $23.52 $13.37 $36.89 WD →
San Luis Obispo CA highway $23.52 $13.37 $36.89 WD →
San Luis Obispo CA heavy $23.52 $13.37 $36.89 WD →
San Luis Obispo CA residential $23.52 $13.37 $36.89 WD →
Santa Barbara CA heavy $23.52 $13.37 $36.89 WD →
Santa Barbara CA highway $23.52 $13.37 $36.89 WD →
Santa Barbara CA building $23.52 $13.37 $36.89 WD →
Santa Barbara CA residential $23.52 $13.37 $36.89 WD →
Tulare CA highway $35.31 $12.75 $48.06 WD →
Tulare CA heavy $35.31 $12.75 $48.06 WD →
Ventura CA building $23.52 $13.37 $36.89 WD →
Ventura CA heavy $23.52 $13.37 $36.89 WD →
Ventura CA highway $23.52 $13.37 $36.89 WD →
Ventura CA residential $23.52 $13.37 $36.89 WD →
Brown WI building $45.24 $30.56 $75.80 WD →
Brown WI building $45.88 $38.15 $84.03 WD →
Calumet WI building $45.24 $30.56 $75.80 WD →
Chippewa WI building $55.34 $34.03 $89.37 WD →
Dane WI building $45.88 $38.15 $84.03 WD →
Douglas WI building $49.17 $23.83 $73.00 WD →
Eau Claire WI building $55.34 $34.03 $89.37 WD →
Kenosha WI building $45.88 $38.15 $84.03 WD →
La Crosse WI building $45.88 $38.15 $84.03 WD →
Marathon WI building $45.24 $30.56 $75.80 WD →
Milwaukee WI building $45.88 $38.15 $84.03 WD →
Outagamie WI building $45.24 $30.56 $75.80 WD →
Ozaukee WI building $45.88 $38.15 $84.03 WD →
Pierce WI building $55.34 $34.03 $89.37 WD →
Racine WI building $45.88 $38.15 $84.03 WD →
Rock WI building $45.88 $38.15 $84.03 WD →
Sheboygan WI building $45.24 $30.56 $75.80 WD →
St Croix WI building $55.34 $34.03 $89.37 WD →
Washington WI building $45.88 $38.15 $84.03 WD →
Waukesha WI building $45.88 $38.15 $84.03 WD →
Winnebago WI building $45.24 $30.56 $75.80 WD →
Top-paying counties for ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER →