PAINTERS: INCLUDING LEAD ABATEMENT: ALL OTHER WORK — Prevailing Wage Rates
Davis-Bacon prevailing wages for PAINTERS: INCLUDING LEAD ABATEMENT: ALL OTHER WORKs across all covered states and counties. Rates vary by location and construction type.
Across 19 Davis-Bacon rate records nationwide, the median total package (base + fringe) for PAINTERS: INCLUDING LEAD ABATEMENT: ALL OTHER WORK is $57.16/hr, with the middle 80% of counties paying between $57.16 and $57.16/hr. The highest state average is California at $57.16/hr; the lowest is California at $57.16/hr.
Range: $57.16 – $57.16/hr across 1 state. Total package = base hourly rate + fringe benefits.
Davis-Bacon vs. Market Median
Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2141 — Painters, Construction and Maintenance.
Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.
Average Rates by State
All Rates
19 county-level rates for PAINTERS: INCLUDING LEAD ABATEMENT: ALL OTHER WORK, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Imperial | CA | highway | $38.52 | $18.64 | $57.16 | WD → |
| Imperial | CA | building | $38.52 | $18.64 | $57.16 | WD → |
| Imperial | CA | heavy | $38.52 | $18.64 | $57.16 | WD → |
| Los Angeles | CA | highway | $38.52 | $18.64 | $57.16 | WD → |
| Los Angeles | CA | heavy | $38.52 | $18.64 | $57.16 | WD → |
| Los Angeles | CA | building | $38.52 | $18.64 | $57.16 | WD → |
| Orange | CA | heavy | $38.52 | $18.64 | $57.16 | WD → |
| Orange | CA | building | $38.52 | $18.64 | $57.16 | WD → |
| Orange | CA | highway | $38.52 | $18.64 | $57.16 | WD → |
| Riverside | CA | highway | $38.52 | $18.64 | $57.16 | WD → |
| Riverside | CA | building | $38.52 | $18.64 | $57.16 | WD → |
| Riverside | CA | heavy | $38.52 | $18.64 | $57.16 | WD → |
| San Bernardino | CA | highway | $38.52 | $18.64 | $57.16 | WD → |
| San Bernardino | CA | building | $38.52 | $18.64 | $57.16 | WD → |
| San Bernardino | CA | heavy | $38.52 | $18.64 | $57.16 | WD → |
| San Diego | CA | heavy | $38.52 | $18.64 | $57.16 | WD → |
| San Diego | CA | building | $38.52 | $18.64 | $57.16 | WD → |
| San Diego | CA | residential | $38.52 | $18.64 | $57.16 | WD → |
| San Diego | CA | highway | $38.52 | $18.64 | $57.16 | WD → |