Quick Answer

Across 73 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER is $53.12/hr, with the middle 80% of counties paying between $53.12 and $53.12/hr. The highest state average is Oklahoma at $53.12/hr; the lowest is Oklahoma at $53.12/hr.

Bottom 10%
$53.12
Median
$53.12
Average
$53.12
Top 10%
$53.12

Range: $53.12 – $53.12/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073Operating Engineers and Other Construction Equipment Operators.

Davis-Bacon median
$53.12/hr
National median total package (base + fringe)
BLS OEWS market median
$28.23/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+88.2%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Oklahoma OK
Avg base: $34.07/hr
Avg total: $53.12/hr
73 rates

All Rates

73 county-level rates for POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Alfalfa OK building $34.07 $19.05 $53.12 WD →
Atoka OK building $34.07 $19.05 $53.12 WD →
Beaver OK building $34.07 $19.05 $53.12 WD →
Beckham OK building $34.07 $19.05 $53.12 WD →
Blaine OK building $34.07 $19.05 $53.12 WD →
Bryan OK building $34.07 $19.05 $53.12 WD →
Caddo OK building $34.07 $19.05 $53.12 WD →
Canadian OK heavy $34.07 $19.05 $53.12 WD →
Canadian OK building $34.07 $19.05 $53.12 WD →
Carter OK building $34.07 $19.05 $53.12 WD →
Choctaw OK building $34.07 $19.05 $53.12 WD →
Cimarron OK building $34.07 $19.05 $53.12 WD →
Cleveland OK building $34.07 $19.05 $53.12 WD →
Cleveland OK heavy $34.07 $19.05 $53.12 WD →
Coal OK building $34.07 $19.05 $53.12 WD →
Comanche OK building $34.07 $19.05 $53.12 WD →
Cotton OK building $34.07 $19.05 $53.12 WD →
Creek OK building $34.07 $19.05 $53.12 WD →
Custer OK building $34.07 $19.05 $53.12 WD →
Dewey OK building $34.07 $19.05 $53.12 WD →
Ellis OK building $34.07 $19.05 $53.12 WD →
Garfield OK building $34.07 $19.05 $53.12 WD →
Garvin OK building $34.07 $19.05 $53.12 WD →
Grady OK heavy $34.07 $19.05 $53.12 WD →
Grady OK building $34.07 $19.05 $53.12 WD →
Grant OK building $34.07 $19.05 $53.12 WD →
Greer OK building $34.07 $19.05 $53.12 WD →
Harmon OK building $34.07 $19.05 $53.12 WD →
Harper OK building $34.07 $19.05 $53.12 WD →
Haskell OK building $34.07 $19.05 $53.12 WD →
Hughes OK building $34.07 $19.05 $53.12 WD →
Jackson OK building $34.07 $19.05 $53.12 WD →
Jefferson OK building $34.07 $19.05 $53.12 WD →
Johnston OK building $34.07 $19.05 $53.12 WD →
Kay OK building $34.07 $19.05 $53.12 WD →
Kingfisher OK building $34.07 $19.05 $53.12 WD →
Kiowa OK building $34.07 $19.05 $53.12 WD →
Latimer OK building $34.07 $19.05 $53.12 WD →
Le Flore OK building $34.07 $19.05 $53.12 WD →
Lincoln OK building $34.07 $19.05 $53.12 WD →
Lincoln OK heavy $34.07 $19.05 $53.12 WD →
Logan OK heavy $34.07 $19.05 $53.12 WD →
Logan OK building $34.07 $19.05 $53.12 WD →
Love OK building $34.07 $19.05 $53.12 WD →
Major OK building $34.07 $19.05 $53.12 WD →
Marshall OK building $34.07 $19.05 $53.12 WD →
McClain OK heavy $34.07 $19.05 $53.12 WD →
McClain OK building $34.07 $19.05 $53.12 WD →
McCurtain OK building $34.07 $19.05 $53.12 WD →
Murray OK building $34.07 $19.05 $53.12 WD →
Muskogee OK building $34.07 $19.05 $53.12 WD →
Noble OK building $34.07 $19.05 $53.12 WD →
Oklahoma OK heavy $34.07 $19.05 $53.12 WD →
Okmulgee OK building $34.07 $19.05 $53.12 WD →
Osage OK building $34.07 $19.05 $53.12 WD →
Pawnee OK building $34.07 $19.05 $53.12 WD →
Payne OK building $34.07 $19.05 $53.12 WD →
Pittsburg OK building $34.07 $19.05 $53.12 WD →
Pontotoc OK building $34.07 $19.05 $53.12 WD →
Pottawatomie OK building $34.07 $19.05 $53.12 WD →
Pushmataha OK building $34.07 $19.05 $53.12 WD →
Roger Mills OK building $34.07 $19.05 $53.12 WD →
Rogers OK building $34.07 $19.05 $53.12 WD →
Seminole OK building $34.07 $19.05 $53.12 WD →
Sequoyah OK building $34.07 $19.05 $53.12 WD →
Stephens OK building $34.07 $19.05 $53.12 WD →
Texas OK building $34.07 $19.05 $53.12 WD →
Tillman OK building $34.07 $19.05 $53.12 WD →
Tulsa OK building $34.07 $19.05 $53.12 WD →
Wagoner OK building $34.07 $19.05 $53.12 WD →
Washita OK building $34.07 $19.05 $53.12 WD →
Woods OK building $34.07 $19.05 $53.12 WD →
Woodward OK building $34.07 $19.05 $53.12 WD →
Top-paying counties for POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER →