Wage Determination OK20260038-14388-bld
Garfield, OK · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination OK20260038-14388-bld covers 31 trade classifications for building construction in Garfield, OK. Total packages (base + fringe) range from $10.17/hr to $58.11/hr, with the highest going to BOILERMAKER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: OK20260038-14388-bld
Revision: 1
Type: building
County: Garfield
State: OK
Effective: May 17, 2026
Trades covered: 31
Highest rate: $58.11/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BOILERMAKER | $33.70 | $24.41 | $58.11 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $26.92 | $13.09 | $40.01 | $0.00 | $0.00 | $0.00 | $0.00 |
| CAPACITY CRANES. ALL TOWER CRANES | $38.09 | $19.05 | $57.14 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $12.96 | $0.00 | $12.96 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $12.90 | $0.00 | $12.90 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $13.02 | $0.00 | $13.02 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $16.10 | $0.00 | $16.10 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $24.26 | $9.76 | $34.02 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS | $23.36 | $4.48 | $27.84 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $20.05 | $5.94 | $25.99 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $10.87 | $1.44 | $12.31 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $11.88 | $0.00 | $11.88 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $13.04 | $0.00 | $13.04 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $13.03 | $0.00 | $13.03 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PLASTER TENDER | $10.17 | $0.00 | $10.17 | $0.00 | $0.00 | $0.00 | $0.00 |
| LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER | $35.40 | $19.05 | $54.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| LESS THAN 200 TON CAPACITY | $36.14 | $19.05 | $55.19 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.34 | $0.74 | $20.08 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $13.80 | $0.94 | $14.74 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $13.32 | $0.00 | $13.32 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: DRYWALL FINISHING/TAPING | $12.00 | $0.00 | $12.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $41.00 | $16.03 | $57.03 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER, EXCLUDES HVAC PIPE INSTALLATION | $19.00 | $0.00 | $19.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $17.21 | $0.00 | $17.21 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $41.00 | $16.03 | $57.03 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 10 OILER | $27.25 | $19.05 | $46.30 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER | $34.07 | $19.05 | $53.12 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT | $28.77 | $19.05 | $47.82 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $15.00 | $0.29 | $15.29 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $33.38 | $16.36 | $49.74 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $16.32 | $0.00 | $16.32 | $0.00 | $0.00 | $0.00 | $0.00 |