Wage Determination OK20260046-14396-bld

Lincoln, OK · building · Rev. 2 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination OK20260046-14396-bld covers 40 trade classifications for building construction in Lincoln, OK. Total packages (base + fringe) range from $10.20/hr to $89.55/hr, with the highest going to PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: OK20260046-14396-bld
Revision: 2
Type: building
County: Lincoln
State: OK
Effective: May 17, 2026
Trades covered: 40
Highest rate: $89.55/hr
Official source: SAM.gov reference OK20260046View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $26.92 $13.09 $40.01 $0.00 $0.00 $0.00 $0.00
CAPACITY CRANES. ALL TOWER CRANES $38.09 $19.05 $57.14 $0.00 $0.00 $0.00 $0.00
CARPENTER $27.79 $10.05 $37.84 $0.00 $0.00 $0.00 $0.00
CARPENTER $14.45 $0.00 $14.45 $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION $16.31 $2.96 $19.27 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $16.72 $0.00 $16.72 $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $14.25 $0.00 $14.25 $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER, INCLUDES METAL STUD INSTALLATION $14.08 $0.00 $14.08 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $41.40 $13.14 $54.54 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $24.26 $9.76 $34.02 $0.00 $0.00 $0.00 $0.00
FENCE ERECTOR $16.00 $0.00 $16.00 $0.00 $0.00 $0.00 $0.00
GLAZIER $12.02 $2.42 $14.44 $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC $21.64 $6.46 $28.10 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $17.11 $0.00 $17.11 $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL AND STRUCTURAL $32.10 $17.38 $49.48 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $10.20 $0.00 $10.20 $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $13.75 $0.00 $13.75 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $12.00 $0.00 $12.00 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $13.00 $1.91 $14.91 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $12.39 $0.00 $12.39 $0.00 $0.00 $0.00 $0.00
LABORER: PLASTER TENDER $12.00 $0.00 $12.00 $0.00 $0.00 $0.00 $0.00
LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER $35.40 $19.05 $54.45 $0.00 $0.00 $0.00 $0.00
LESS THAN 200 TON CAPACITY $36.14 $19.05 $55.19 $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $29.15 $11.81 $40.96 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $21.25 $4.35 $25.60 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $20.64 $2.35 $22.99 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $14.28 $1.70 $15.98 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $16.18 $0.00 $16.18 $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $13.38 $1.54 $14.92 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING $12.17 $0.00 $12.17 $0.00 $0.00 $0.00 $0.00
PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE $51.11 $38.44 $89.55 $0.00 $0.00 $0.00 $0.00
PIPEFITTER $41.00 $16.03 $57.03 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 10 OILER; SEMI- TRAILER TRUCK DRIVER $27.25 $19.05 $46.30 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER $34.07 $19.05 $53.12 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT $28.77 $19.05 $47.82 $0.00 $0.00 $0.00 $0.00
ROOFER $26.30 $10.34 $36.64 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $33.38 $16.36 $49.74 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 19.45 6.38 PLASTERER $17.50 $0.00 $17.50 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $39.05 $25.77 $64.82 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP AND FLATBED TRUCK $11.60 $0.00 $11.60 $0.00 $0.00 $0.00 $0.00
View all WDs for Lincoln → Revision history →