Wage Determination OK20260052-14426-bld
Rogers, OK · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination OK20260052-14426-bld covers 32 trade classifications for building construction in Rogers, OK. Total packages (base + fringe) range from $11.00/hr to $89.68/hr, with the highest going to PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: OK20260052-14426-bld
Revision: 1
Type: building
County: Rogers
State: OK
Effective: May 17, 2026
Trades covered: 32
Highest rate: $89.68/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER | $26.92 | $13.09 | $40.01 | $0.00 | $0.00 | $0.00 | $0.00 |
| CAPACITY CRANES. ALL TOWER CRANES | $38.09 | $19.05 | $57.14 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK..$ 12.38 0.00 CARPENTER | $15.07 | $1.22 | $16.29 | $0.00 | $0.00 | $0.00 | $0.00 |
| CAULKER | $20.00 | $1.61 | $21.61 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $14.26 | $1.27 | $15.53 | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL FINISHER/TAPER | $13.00 | $0.00 | $13.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $38.38 | $12.89 | $51.27 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $20.66 | $2.64 | $23.30 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: ALARM INSTALLATION | $19.00 | $3.20 | $22.20 | $0.00 | $0.00 | $0.00 | $0.00 |
| FORM WORKER | $14.17 | $0.38 | $14.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| HVAC MECHANIC | $36.65 | $16.03 | $52.68 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $13.23 | $3.95 | $17.18 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $12.52 | $0.00 | $12.52 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $13.00 | $1.91 | $14.91 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $12.39 | $0.00 | $12.39 | $0.00 | $0.00 | $0.00 | $0.00 |
| LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER | $35.40 | $19.05 | $54.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| LESS THAN 200 TON CAPACITY | $36.14 | $19.05 | $55.19 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ASPHALT PAVER | $16.88 | $0.00 | $16.88 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $17.64 | $0.38 | $18.02 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $19.34 | $1.90 | $21.24 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $14.28 | $1.70 | $15.98 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $16.18 | $0.00 | $16.18 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | $51.24 | $38.44 | $89.68 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION | $36.65 | $16.03 | $52.68 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 10 OILER; SEMI- TRAILER TRUCK DRIVER | $27.25 | $19.05 | $46.30 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER | $34.07 | $19.05 | $53.12 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT | $28.77 | $19.05 | $47.82 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $26.30 | $10.34 | $36.64 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $35.49 | $14.60 | $50.09 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 22.18 5.06 PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING | $12.22 | $0.00 | $12.22 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $21.86 | $1.19 | $23.05 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP AND FLATBED TRUCK | $11.00 | $0.00 | $11.00 | $0.00 | $0.00 | $0.00 | $0.00 |