Wage Determination OK20260052-14426-bld

Rogers, OK · building · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination OK20260052-14426-bld covers 32 trade classifications for building construction in Rogers, OK. Total packages (base + fringe) range from $11.00/hr to $89.68/hr, with the highest going to PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: OK20260052-14426-bld
Revision: 1
Type: building
County: Rogers
State: OK
Effective: May 17, 2026
Trades covered: 32
Highest rate: $89.68/hr
Official source: SAM.gov reference OK20260052View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $26.92 $13.09 $40.01 $0.00 $0.00 $0.00 $0.00
CAPACITY CRANES. ALL TOWER CRANES $38.09 $19.05 $57.14 $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK..$ 12.38 0.00 CARPENTER $15.07 $1.22 $16.29 $0.00 $0.00 $0.00 $0.00
CAULKER $20.00 $1.61 $21.61 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $14.26 $1.27 $15.53 $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $13.00 $0.00 $13.00 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $38.38 $12.89 $51.27 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $20.66 $2.64 $23.30 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: ALARM INSTALLATION $19.00 $3.20 $22.20 $0.00 $0.00 $0.00 $0.00
FORM WORKER $14.17 $0.38 $14.55 $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC $36.65 $16.03 $52.68 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $13.23 $3.95 $17.18 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $12.52 $0.00 $12.52 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $13.00 $1.91 $14.91 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $12.39 $0.00 $12.39 $0.00 $0.00 $0.00 $0.00
LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER $35.40 $19.05 $54.45 $0.00 $0.00 $0.00 $0.00
LESS THAN 200 TON CAPACITY $36.14 $19.05 $55.19 $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT PAVER $16.88 $0.00 $16.88 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $17.64 $0.38 $18.02 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $19.34 $1.90 $21.24 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $14.28 $1.70 $15.98 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $16.18 $0.00 $16.18 $0.00 $0.00 $0.00 $0.00
PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE $51.24 $38.44 $89.68 $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION $36.65 $16.03 $52.68 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 10 OILER; SEMI- TRAILER TRUCK DRIVER $27.25 $19.05 $46.30 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER $34.07 $19.05 $53.12 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT $28.77 $19.05 $47.82 $0.00 $0.00 $0.00 $0.00
ROOFER $26.30 $10.34 $36.64 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $35.49 $14.60 $50.09 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 22.18 5.06 PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING $12.22 $0.00 $12.22 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $21.86 $1.19 $23.05 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP AND FLATBED TRUCK $11.00 $0.00 $11.00 $0.00 $0.00 $0.00 $0.00