Wage Determination OK20260070-16842-bld
Cotton, OK · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination OK20260070-16842-bld covers 24 trade classifications for building construction in Cotton, OK. Total packages (base + fringe) range from $11.88/hr to $58.11/hr, with the highest going to BOILERMAKER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: OK20260070-16842-bld
Revision: 1
Type: building
County: Cotton
State: OK
Effective: May 17, 2026
Trades covered: 24
Highest rate: $58.11/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BOILERMAKER | $33.70 | $24.41 | $58.11 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $26.92 | $13.09 | $40.01 | $0.00 | $0.00 | $0.00 | $0.00 |
| CAPACITY CRANES. ALL TOWER CRANES | $38.09 | $19.05 | $57.14 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $15.71 | $5.50 | $21.21 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $16.10 | $0.00 | $16.10 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $41.40 | $13.14 | $54.54 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $19.73 | $4.55 | $24.28 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: ALARM INSTALLATION | $17.50 | $2.27 | $19.77 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $32.10 | $17.38 | $49.48 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $11.60 | $0.84 | $12.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $11.88 | $0.00 | $11.88 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $13.04 | $0.00 | $13.04 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $13.03 | $0.00 | $13.03 | $0.00 | $0.00 | $0.00 | $0.00 |
| LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER | $35.40 | $19.05 | $54.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| LESS THAN 200 TON CAPACITY | $36.14 | $19.05 | $55.19 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.34 | $0.74 | $20.08 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $12.15 | $0.00 | $12.15 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $41.00 | $16.03 | $57.03 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $41.00 | $16.03 | $57.03 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 10 OILER | $27.25 | $19.05 | $46.30 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER | $34.07 | $19.05 | $53.12 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT | $28.77 | $19.05 | $47.82 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $33.38 | $16.36 | $49.74 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 16.32 0.00 ROOFER | $15.00 | $0.29 | $15.29 | $0.00 | $0.00 | $0.00 | $0.00 |