Wage Determination OK20260054-14413-bld

Le Flore, OK · building · Rev. 2 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination OK20260054-14413-bld covers 25 trade classifications for building construction in Le Flore, OK. Total packages (base + fringe) range from $9.63/hr to $57.14/hr, with the highest going to CAPACITY CRANES. ALL TOWER CRANES. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: OK20260054-14413-bld
Revision: 2
Type: building
County: Le Flore
State: OK
Effective: May 17, 2026
Trades covered: 25
Highest rate: $57.14/hr
Official source: SAM.gov reference OK20260054View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $26.92 $13.09 $40.01 $0.00 $0.00 $0.00 $0.00
CAPACITY CRANES. ALL TOWER CRANES $38.09 $19.05 $57.14 $0.00 $0.00 $0.00 $0.00
CARPENTER $15.86 $0.00 $15.86 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $14.26 $1.27 $15.53 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (LE FLORE AND SEQUOYAH COUNTIES) $38.38 $12.89 $51.27 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (LEFLORE AND SEQUOYAH COUNTIES) $30.03 $14.03 $44.06 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $9.63 $0.00 $9.63 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $12.52 $0.00 $12.52 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $13.00 $1.91 $14.91 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $12.39 $0.00 $12.39 $0.00 $0.00 $0.00 $0.00
LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER $35.40 $19.05 $54.45 $0.00 $0.00 $0.00 $0.00
LESS THAN 200 TON CAPACITY $36.14 $19.05 $55.19 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $17.38 $4.08 $21.46 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $20.64 $2.35 $22.99 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $14.28 $1.70 $15.98 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $16.18 $0.00 $16.18 $0.00 $0.00 $0.00 $0.00
PIPEFITTER $36.65 $16.03 $52.68 $0.00 $0.00 $0.00 $0.00
PLUMBER $36.65 $16.48 $53.13 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 10 OILER; SEMI- TRAILER TRUCK DRIVER $27.25 $19.05 $46.30 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER $34.07 $19.05 $53.12 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT $28.77 $19.05 $47.82 $0.00 $0.00 $0.00 $0.00
ROOFER $26.30 $10.34 $36.64 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $35.49 $14.60 $50.09 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 22.18 5.06 PAINTER: BRUSH, ROLLER AND SPRAY $12.22 $0.00 $12.22 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP AND FLATBED TRUCK $11.00 $0.00 $11.00 $0.00 $0.00 $0.00 $0.00
View all WDs for Le Flore → Revision history →