Wage Determination OK20260043-16841-bld

Comanche, OK · building · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination OK20260043-16841-bld covers 29 trade classifications for building construction in Comanche, OK. Total packages (base + fringe) range from $9.31/hr to $57.14/hr, with the highest going to CAPACITY CRANES. ALL TOWER CRANES. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: OK20260043-16841-bld
Revision: 1
Type: building
County: Comanche
State: OK
Effective: May 17, 2026
Trades covered: 29
Highest rate: $57.14/hr
Official source: SAM.gov reference OK20260043View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $26.92 $13.09 $40.01 $0.00 $0.00 $0.00 $0.00
CAPACITY CRANES. ALL TOWER CRANES $38.09 $19.05 $57.14 $0.00 $0.00 $0.00 $0.00
CARPENTER $15.50 $2.80 $18.30 $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES DRYWALL HANGING $15.50 $2.80 $18.30 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $16.72 $0.00 $16.72 $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $13.80 $0.00 $13.80 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $41.40 $13.14 $54.54 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $20.08 $5.43 $25.51 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $17.11 $0.00 $17.11 $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL AND STRUCTURAL $32.10 $17.38 $49.48 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $9.31 $0.00 $9.31 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $12.00 $0.00 $12.00 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $13.00 $1.91 $14.91 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $12.39 $0.00 $12.39 $0.00 $0.00 $0.00 $0.00
LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER $35.40 $19.05 $54.45 $0.00 $0.00 $0.00 $0.00
LESS THAN 200 TON CAPACITY $36.14 $19.05 $55.19 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $21.25 $4.35 $25.60 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $20.64 $2.35 $22.99 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $14.28 $1.70 $15.98 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $16.18 $0.00 $16.18 $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION $41.00 $16.03 $57.03 $0.00 $0.00 $0.00 $0.00
PLUMBER $41.00 $16.03 $57.03 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 10 OILER; SEMI- TRAILER TRUCK DRIVER $27.25 $19.05 $46.30 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER $34.07 $19.05 $53.12 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT $28.77 $19.05 $47.82 $0.00 $0.00 $0.00 $0.00
ROOFER $26.30 $10.34 $36.64 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $33.38 $16.36 $49.74 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 21.82 0.00 PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING $12.91 $0.00 $12.91 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP AND FLATBED TRUCK $11.60 $0.00 $11.60 $0.00 $0.00 $0.00 $0.00
View all WDs for Comanche → Revision history →