Wage determination OK20260070-14370-bld covers 24 trade classifications for building construction in Roger Mills, OK. Total packages (base + fringe) range from $11.88/hr to $58.11/hr, with the highest going to BOILERMAKER. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: OK20260070-14370-bld
Revision: 1
Type: building
County: Roger Mills
State: OK
Effective: May 17, 2026
Trades covered: 24
Highest rate: $58.11/hr
Official source: SAM.gov reference OK20260070View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BOILERMAKER $33.70 $24.41 $58.11 $0.00 $0.00 $0.00 $0.00
BRICKLAYER $26.92 $13.09 $40.01 $0.00 $0.00 $0.00 $0.00
CAPACITY CRANES. ALL TOWER CRANES $38.09 $19.05 $57.14 $0.00 $0.00 $0.00 $0.00
CARPENTER $15.71 $5.50 $21.21 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $16.10 $0.00 $16.10 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $41.40 $13.14 $54.54 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $19.73 $4.55 $24.28 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: ALARM INSTALLATION $17.50 $2.27 $19.77 $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $32.10 $17.38 $49.48 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $11.60 $0.84 $12.44 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $11.88 $0.00 $11.88 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $13.04 $0.00 $13.04 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $13.03 $0.00 $13.03 $0.00 $0.00 $0.00 $0.00
LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER $35.40 $19.05 $54.45 $0.00 $0.00 $0.00 $0.00
LESS THAN 200 TON CAPACITY $36.14 $19.05 $55.19 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $19.34 $0.74 $20.08 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $12.15 $0.00 $12.15 $0.00 $0.00 $0.00 $0.00
PIPEFITTER $41.00 $16.03 $57.03 $0.00 $0.00 $0.00 $0.00
PLUMBER $41.00 $16.03 $57.03 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 10 OILER $27.25 $19.05 $46.30 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER $34.07 $19.05 $53.12 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT $28.77 $19.05 $47.82 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $33.38 $16.36 $49.74 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 16.32 0.00 ROOFER $15.00 $0.29 $15.29 $0.00 $0.00 $0.00 $0.00