Wage Determination CA20260018-16364-hvy

Tuolumne, CA · heavy · Rev. 5 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination CA20260018-16364-hvy covers 328 trade classifications for heavy construction in Tuolumne, CA. Total packages (base + fringe) range from $23.74/hr to $154.14/hr, with the highest going to CABLE SPLICER FOOTNOTES: WORK UNDER COMPRESSED AIR OR WHERE GAS MASKS ARE REQUIRED, ORWORK ON LADDERS, SCAFFOLDS, STACKS, ""BOSUN'S CHAIRS,"" OR OTHER. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: CA20260018-16364-hvy
Revision: 5
Type: heavy
County: Tuolumne
State: CA
Effective: May 17, 2026
Trades covered: 328
Highest rate: $154.14/hr
Official source: SAM.gov reference CA20260018View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. T $37.05 $27.30 $64.35 $0.00 $0.00 $0.00 $0.00
220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00 PER FOOT SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RAT $59.51 $34.69 $94.20 $0.00 $0.00 $0.00 $0.00
220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00 PER FOOT SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RAT $64.51 $34.69 $99.20 $0.00 $0.00 $0.00 $0.00
ADDITIONAL OVER 180 FEET - $6.00 PER HOUIR ADDITIONAL $53.38 $28.04 $81.42 $0.00 $0.00 $0.00 $0.00
ADDITIONAL PER HOUR $43.45 $22.80 $66.25 $0.00 $0.00 $0.00 $0.00
AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; J $35.25 $27.30 $62.55 $0.00 $0.00 $0.00 $0.00
AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUN $29.94 $27.30 $57.24 $0.00 $0.00 $0.00 $0.00
AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUN $36.50 $27.30 $63.80 $0.00 $0.00 $0.00 $0.00
AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUN $36.08 $27.30 $63.38 $0.00 $0.00 $0.00 $0.00
AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUN $36.05 $27.30 $63.35 $0.00 $0.00 $0.00 $0.00
AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUN $35.55 $27.30 $62.85 $0.00 $0.00 $0.00 $0.00
AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUN $35.50 $27.30 $62.80 $0.00 $0.00 $0.00 $0.00
APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF INCEPTION. FOOTNOTES: LABORERS WORKING OF $38.70 $29.89 $68.59 $0.00 $0.00 $0.00 $0.00
AREA EXTENDING 5 MILES EAST AND WEST OF HIGHWAY 101 SOUTH TO THE SAN LUIS OBISPO COUNTY LINE $70.41 $33.76 $104.17 $0.00 $0.00 $0.00 $0.00
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF $44.73 $12.75 $57.48 $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANI $64.56 $25.07 $89.63 $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANI $84.76 $25.07 $109.83 $0.00 $0.00 $0.00 $0.00
BOILERMAKER $45.60 $38.99 $84.59 $0.00 $0.00 $0.00 $0.00
BOILERMAKER $49.62 $41.27 $90.89 $0.00 $0.00 $0.00 $0.00
BORDER WITH SHASTA COUNTY AREA 2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PAR $57.65 $39.55 $97.20 $0.00 $0.00 $0.00 $0.00
BORDER WITH SHASTA COUNTY AREA 2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PAR $55.65 $39.55 $95.20 $0.00 $0.00 $0.00 $0.00
BRICK TENDER FOOTNOTES: WORK ON JOBS WHERE HEAT-PROTECTIVE CLOTHING IS REQUIRED: $2.00 PER HOUR ADDITIONAL. WORK AT GRINDERS: $.25 PER HOUR ADDITIONAL $37.05 $27.45 $64.50 $0.00 $0.00 $0.00 $0.00
BRICKLAYER ALAMEDA, CONTRA COSTA, SAN BENITO, SANTA CLARA) $56.94 $26.28 $83.22 $0.00 $0.00 $0.00 $0.00
BRICKLAYER CALAVERAS, SAN JOAQUIN, STANISLAUS, TOULUMNE $52.76 $25.01 $77.77 $0.00 $0.00 $0.00 $0.00
BRICKLAYER FRESNO, KINGS, MADERA, MARIPOSA, MERCED $51.17 $25.80 $76.97 $0.00 $0.00 $0.00 $0.00
BRICKLAYER MONTEREY, SANTA CRUZ $54.18 $27.82 $82.00 $0.00 $0.00 $0.00 $0.00
BRICKLAYER SAN FRANCISCO, SAN MATEO $57.02 $28.50 $85.52 $0.00 $0.00 $0.00 $0.00
BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANER; MATERIAL CLEANER. THE CLASSIFICATION ""MATERIAL CL $29.94 $27.30 $57.24 $0.00 $0.00 $0.00 $0.00
BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANER; MATERIAL CLEANER. THE CLASSIFICATION ""MATERIAL CL $28.94 $27.30 $56.24 $0.00 $0.00 $0.00 $0.00
BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH $53.23 $39.55 $92.78 $0.00 $0.00 $0.00 $0.00
BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH $56.53 $39.55 $96.08 $0.00 $0.00 $0.00 $0.00
BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH $51.23 $39.55 $90.78 $0.00 $0.00 $0.00 $0.00
BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH $54.53 $39.55 $94.08 $0.00 $0.00 $0.00 $0.00
CABLE SPLICER $74.54 $36.09 $110.63 $0.00 $0.00 $0.00 $0.00
CABLE SPLICER $87.40 $49.41 $136.81 $0.00 $0.00 $0.00 $0.00
CABLE SPLICER FOOTNOTES: WORK UNDER COMPRESSED AIR OR WHERE GAS MASKS ARE REQUIRED, ORWORK ON LADDERS, SCAFFOLDS, STACKS, ""BOSUN'S CHAIRS,"" OR OTHER $104.68 $49.46 $154.14 $0.00 $0.00 $0.00 $0.00
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER $60.39 $33.52 $93.91 $0.00 $0.00 $0.00 $0.00
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER $52.65 $30.82 $83.47 $0.00 $0.00 $0.00 $0.00
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER $54.85 $31.49 $86.34 $0.00 $0.00 $0.00 $0.00
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER $60.54 $33.52 $94.06 $0.00 $0.00 $0.00 $0.00
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER $52.80 $30.82 $83.62 $0.00 $0.00 $0.00 $0.00
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER $46.92 $30.82 $77.74 $0.00 $0.00 $0.00 $0.00
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER $55.00 $31.49 $86.49 $0.00 $0.00 $0.00 $0.00
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER $49.12 $31.49 $80.61 $0.00 $0.00 $0.00 $0.00
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER $47.77 $31.49 $79.26 $0.00 $0.00 $0.00 $0.00
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER KINGS COUNTY $47.77 $31.49 $79.26 $0.00 $0.00 $0.00 $0.00
CARPENTERS: JOURNEYMAN CARPENTER $60.39 $33.52 $93.91 $0.00 $0.00 $0.00 $0.00
CARPENTERS: JOURNEYMAN CARPENTER $52.65 $30.82 $83.47 $0.00 $0.00 $0.00 $0.00
CARPENTERS: JOURNEYMAN CARPENTER $46.77 $30.82 $77.59 $0.00 $0.00 $0.00 $0.00
CARPENTERS: JOURNEYMAN CARPENTER $54.85 $31.49 $86.34 $0.00 $0.00 $0.00 $0.00
CARPENTERS: JOURNEYMAN CARPENTER $48.97 $31.49 $80.46 $0.00 $0.00 $0.00 $0.00
CARPENTERS: JOURNEYMAN CARPENTER $47.62 $31.49 $79.11 $0.00 $0.00 $0.00 $0.00
CARPENTERS: JOURNEYMAN CARPENTER.$ 45.42 30.82 CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR $45.57 $30.82 $76.39 $0.00 $0.00 $0.00 $0.00
CARPENTERS: JOURNEYMAN CARPENTER.$ 60.39 33.52 CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR $60.54 $33.52 $94.06 $0.00 $0.00 $0.00 $0.00
CARPENTERS: JOURNEYMAN CARPENTER..$ 48.97 31.49 CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR $49.12 $31.49 $80.61 $0.00 $0.00 $0.00 $0.00
CARPENTERS: MILLWRIGHT $47.92 $32.41 $80.33 $0.00 $0.00 $0.00 $0.00
CARPENTERS: MILLWRIGHT $60.49 $35.11 $95.60 $0.00 $0.00 $0.00 $0.00
CARPENTERS: MILLWRIGHT $52.75 $32.41 $85.16 $0.00 $0.00 $0.00 $0.00
CARPENTERS: MILLWRIGHT $49.27 $32.41 $81.68 $0.00 $0.00 $0.00 $0.00
CARPENTERS: MILLWRIGHT $54.95 $33.08 $88.03 $0.00 $0.00 $0.00 $0.00
CARPENTERS: MILLWRIGHT $51.47 $33.08 $84.55 $0.00 $0.00 $0.00 $0.00
CARPENTERS: MILLWRIGHT $50.12 $33.08 $83.20 $0.00 $0.00 $0.00 $0.00
CARPENTERS: MILLWRIGHT.$ 50.12 33.08 CARPENTERS: JOURNEYMAN CARPENTER $47.62 $31.49 $79.11 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $32.15 $23.27 $55.42 $0.00 $0.00 $0.00 $0.00
COMMUNICATIONS SYSTEM: INSTALLER SCOPE OF WORK INCLUDES THE INSTALLATION TESTING, SERVICE AND MAINTENANCE, OF THE FOLLOWING SYSTEMS WHICH UTILIZE THE $45.28 $28.01 $73.29 $0.00 $0.00 $0.00 $0.00
COMMUNICATIONS SYSTEM: INSTALLER SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTH $45.28 $28.01 $73.29 $0.00 $0.00 $0.00 $0.00
COMMUNICATIONS SYSTEM: TECHNICIAN SCOPE OF WORK INCLUDES THE INSTALLATION TESTING, SERVICE AND MAINTENANCE, OF THE FOLLOWING SYSTEMS WHICH UTILIZE THE $52.07 $28.21 $80.28 $0.00 $0.00 $0.00 $0.00
COMMUNICATIONS SYSTEM: TECHNICIAN SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OT $52.07 $28.21 $80.28 $0.00 $0.00 $0.00 $0.00
COUNTIES) FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANE $28.94 $27.30 $56.24 $0.00 $0.00 $0.00 $0.00
DIVER: ASSISTANT TENDER, ROV TENDER/TECHNICIAN DEPTH PAY: 050 TO 100 FT $2.00 PER FOOT 101 TO 150 FT $3.00 PER FOOT 151 TO 220 FT $4.00 PER FOOT 221 F $54.10 $34.69 $88.79 $0.00 $0.00 $0.00 $0.00
DIVER: DIVER WET DEPTH PAY: 050 TO 100 FT $2.00 PER FOOT 101 TO 150 FT $3.00 PER FOOT 151 TO 220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00 PER FOOT SATUR $103.62 $34.69 $138.31 $0.00 $0.00 $0.00 $0.00
DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WOR $59.51 $34.69 $94.20 $0.00 $0.00 $0.00 $0.00
DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WOR $60.51 $34.69 $95.20 $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $59.63 $31.29 $90.92 $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $63.76 $32.69 $96.45 $0.00 $0.00 $0.00 $0.00
DRYWALL INSTALLERS/LATHERS $45.92 $31.26 $77.18 $0.00 $0.00 $0.00 $0.00
DRYWALL INSTALLERS/LATHERS $47.27 $31.26 $78.53 $0.00 $0.00 $0.00 $0.00
DRYWALL INSTALLERS/LATHERS $46.77 $31.26 $78.03 $0.00 $0.00 $0.00 $0.00
DRYWALL INSTALLERS/LATHERS $52.65 $31.26 $83.91 $0.00 $0.00 $0.00 $0.00
DRYWALL STOCKER/SCRAPPER $22.97 $18.22 $41.19 $0.00 $0.00 $0.00 $0.00
DRYWALL STOCKER/SCRAPPER $23.64 $18.22 $41.86 $0.00 $0.00 $0.00 $0.00
DRYWALL STOCKER/SCRAPPER $23.39 $18.22 $41.61 $0.00 $0.00 $0.00 $0.00
DRYWALL STOCKER/SCRAPPER $26.33 $18.22 $44.55 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $91.25 $48.05 $139.30 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $50.00 $30.15 $80.15 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $66.26 $35.84 $102.10 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $76.00 $49.07 $125.07 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $86.00 $51.07 $137.07 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN CABLE SPLICER = 110% OF JOURNEYMAN ELECTRICIAN $48.50 $30.09 $78.59 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN FOOTNOTES: WORK UNDER COMPRESSED AIR OR WHERE GAS MASKS ARE REQUIRED, ORWORK ON LADDERS, SCAFFOLDS, STACKS, ""BOSUN'S CHAIRS,"" OR OTHER S $91.03 $49.05 $140.08 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN ZONE B: ANY AREA OUTSIDE OF ZONE A $77.45 $33.97 $111.42 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: ALL OTHER WORK $49.45 $31.96 $81.41 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: TUNNEL WORK $51.92 $32.04 $83.96 $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC FOOTNOTE: A. PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEA $84.05 $38.44 $122.49 $0.00 $0.00 $0.00 $0.00
FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED. TRUCK DRIVERS: GROUP 1: DUMP TRUCKS, UNDER 6 YDS.; SINGLE UNIT FLAT RACK; NIPPER TRUCK; CONCRETE PUMP TR $43.26 $34.28 $77.54 $0.00 $0.00 $0.00 $0.00
GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; JETTI $36.25 $27.30 $63.55 $0.00 $0.00 $0.00 $0.00
GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; JETTI $35.25 $27.30 $62.55 $0.00 $0.00 $0.00 $0.00
GLAZIER $44.33 $28.88 $73.21 $0.00 $0.00 $0.00 $0.00
GLAZIER $56.22 $34.00 $90.22 $0.00 $0.00 $0.00 $0.00
GLAZIER PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR. DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSG $43.25 $35.62 $78.87 $0.00 $0.00 $0.00 $0.00
GUNITING OR SHOT CRETE FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE $36.08 $27.30 $63.38 $0.00 $0.00 $0.00 $0.00
HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER; CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE LABORER; DRILLER TE $36.35 $27.30 $63.65 $0.00 $0.00 $0.00 $0.00
HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER; CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE LABORER; DRILLER TE $35.35 $27.30 $62.65 $0.00 $0.00 $0.00 $0.00
INSTALLER AREA 1 $28.76 $22.53 $51.29 $0.00 $0.00 $0.00 $0.00
INSTALLER AREA 2 $26.11 $22.53 $48.64 $0.00 $0.00 $0.00 $0.00
IRONWORKER: FENCE ERECTOR $45.78 $26.51 $72.29 $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL $50.70 $35.15 $85.85 $0.00 $0.00 $0.00 $0.00
IRONWORKERS: FENCE ERECTOR $45.78 $26.51 $72.29 $0.00 $0.00 $0.00 $0.00
IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL $55.33 $35.15 $90.48 $0.00 $0.00 $0.00 $0.00
IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL $55.83 $35.15 $90.98 $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1-f CALAVERAS AND SAN JOAQUIN COUNTIES $30.37 $29.89 $60.26 $0.00 $0.00 $0.00 $0.00
LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 1 $39.15 $30.03 $69.18 $0.00 $0.00 $0.00 $0.00
LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 2 $38.15 $30.03 $68.18 $0.00 $0.00 $0.00 $0.00
LABORER, BRICK: MASON TENDER-BRICK $36.29 $25.55 $61.84 $0.00 $0.00 $0.00 $0.00
LABORER, CONSTRUCTION CRAFT LABORERS - AREA A: CONSTRUCTION SPECIALIST GROUP ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORER $37.20 $27.30 $64.50 $0.00 $0.00 $0.00 $0.00
LABORER, CONSTRUCTION CRAFT LABORERS - AREA A:: GROUP 1 $36.50 $27.30 $63.80 $0.00 $0.00 $0.00 $0.00
LABORER, CONSTRUCTION CRAFT LABORERS - AREA B: CONSTRUCTION SPECIALIST GROUP ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORER $36.20 $27.30 $63.50 $0.00 $0.00 $0.00 $0.00
LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST GROUP ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK $38.85 $29.89 $68.74 $0.00 $0.00 $0.00 $0.00
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES; BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPP $38.15 $29.89 $68.04 $0.00 $0.00 $0.00 $0.00
LABORER, GUNITE - AREA A: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLD $36.50 $27.30 $63.80 $0.00 $0.00 $0.00 $0.00
LABORER, GUNITE - AREA A: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLD $36.70 $27.30 $64.00 $0.00 $0.00 $0.00 $0.00
LABORER, GUNITE - AREA A: GROUP 3 REBOUNDMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0 $36.37 $27.30 $63.67 $0.00 $0.00 $0.00 $0.00
LABORER, GUNITE - AREA A: GROUP 3REBOUNDMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.2 $36.37 $27.30 $63.67 $0.00 $0.00 $0.00 $0.00
LABORER, GUNITE - AREA A: GROUP 4 GUNITE LABORER FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $36.25 $27.30 $63.55 $0.00 $0.00 $0.00 $0.00
LABORER, GUNITE - AREA A:: GROUP 1 $37.46 $27.30 $64.76 $0.00 $0.00 $0.00 $0.00
LABORER, GUNITE - AREA A:: GROUP 1.$ 37.46 27.30 LABORER, GUNITE - AREA A: GROUP 4 GUNITE LABORER FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS' $36.25 $27.30 $63.55 $0.00 $0.00 $0.00 $0.00
LABORER, GUNITE - AREA B: GROUP 1 $36.46 $27.30 $63.76 $0.00 $0.00 $0.00 $0.00
LABORER, GUNITE - AREA B: GROUP 1- GROUP 1: STRUCTURAL NOZZLEMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BEL $36.46 $27.30 $63.76 $0.00 $0.00 $0.00 $0.00
LABORER, GUNITE - AREA B: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLD $35.96 $27.30 $63.26 $0.00 $0.00 $0.00 $0.00
LABORER, GUNITE - AREA B: GROUP 3 REBOUNDMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0 $35.37 $27.30 $62.67 $0.00 $0.00 $0.00 $0.00
LABORER, GUNITE - AREA B: GROUP 4 GUNITE LABORER FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $35.96 $27.30 $63.26 $0.00 $0.00 $0.00 $0.00
LABORER, GUNITE - AREA B: GROUP 4 GUNITE LABORER FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $35.37 $27.30 $62.67 $0.00 $0.00 $0.00 $0.00
LABORER, GUNITE - AREA B: GROUP 4 Gunite laborer FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $35.25 $27.30 $62.55 $0.00 $0.00 $0.00 $0.00
LABORER, GUNITE - AREA B:: GROUP 1 $36.46 $27.30 $63.76 $0.00 $0.00 $0.00 $0.00
LABORER, GUNITE: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS $39.11 $29.89 $69.00 $0.00 $0.00 $0.00 $0.00
LABORER, GUNITE: GROUP 3 REBOUNDMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HO $38.02 $29.89 $67.91 $0.00 $0.00 $0.00 $0.00
LABORER, GUNITE: GROUP 4 GUINTE LABORER FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PE $37.90 $29.89 $67.79 $0.00 $0.00 $0.00 $0.00
LABORER, PLASTER TENDER $39.77 $28.54 $68.31 $0.00 $0.00 $0.00 $0.00
LABORER, PLASTER TENDER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL $39.77 $28.54 $68.31 $0.00 $0.00 $0.00 $0.00
LABORER, PLASTER TENDER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL $40.68 $29.68 $70.36 $0.00 $0.00 $0.00 $0.00
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON $37.26 $27.30 $64.56 $0.00 $0.00 $0.00 $0.00
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON $36.26 $27.30 $63.56 $0.00 $0.00 $0.00 $0.00
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I $36.56 $27.30 $63.86 $0.00 $0.00 $0.00 $0.00
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I $37.56 $27.30 $64.86 $0.00 $0.00 $0.00 $0.00
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE $36.56 $27.30 $63.86 $0.00 $0.00 $0.00 $0.00
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE $37.56 $27.30 $64.86 $0.00 $0.00 $0.00 $0.00
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II $34.06 $27.30 $61.36 $0.00 $0.00 $0.00 $0.00
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II $35.06 $27.30 $62.36 $0.00 $0.00 $0.00 $0.00
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH $34.06 $27.30 $61.36 $0.00 $0.00 $0.00 $0.00
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH $35.06 $27.30 $62.36 $0.00 $0.00 $0.00 $0.00
LABORER, WRECKING - AREA A: GROUP 2 Semi-skilled wrecker FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL $36.35 $27.30 $63.65 $0.00 $0.00 $0.00 $0.00
LABORER, WRECKING - AREA A:: GROUP 1 $36.50 $27.30 $63.80 $0.00 $0.00 $0.00 $0.00
LABORER, WRECKING - AREA A:: GROUP 2 Semi-skilled wrecker FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHAL $36.35 $27.30 $63.65 $0.00 $0.00 $0.00 $0.00
LABORER, WRECKING - AREA B: GROUP 1- SKILLED WRECKER FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL REC $35.50 $27.30 $62.80 $0.00 $0.00 $0.00 $0.00
LABORER, WRECKING - AREA B: GROUP 2 SEMI-SKILLED WRECKER FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL $35.35 $27.30 $62.65 $0.00 $0.00 $0.00 $0.00
LABORER, WRECKING - AREA B: GROUP 2 Semi-skilled wrecker FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL $35.50 $27.30 $62.80 $0.00 $0.00 $0.00 $0.00
LABORER, WRECKING - AREA B: GROUP 2 Semi-skilled wrecker FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL $35.35 $27.30 $62.65 $0.00 $0.00 $0.00 $0.00
LABORER, WRECKING - AREA B:: GROUP 1 $35.50 $27.30 $62.80 $0.00 $0.00 $0.00 $0.00
LABORER, WRECKING: GROUP 1 $38.15 $29.89 $68.04 $0.00 $0.00 $0.00 $0.00
LABORER, WRECKING: GROUP 2 Semi-skilled wrecker FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $38.00 $29.89 $67.89 $0.00 $0.00 $0.00 $0.00
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A:- Establishment Warranty Period $29.94 $27.30 $57.24 $0.00 $0.00 $0.00 $0.00
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A:- New Construction $36.25 $27.30 $63.55 $0.00 $0.00 $0.00 $0.00
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B- Establishment Warranty Period $28.94 $27.30 $56.24 $0.00 $0.00 $0.00 $0.00
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B- New Construction $35.25 $27.30 $62.55 $0.00 $0.00 $0.00 $0.00
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B:- Establishment Warranty Period $28.94 $27.30 $56.24 $0.00 $0.00 $0.00 $0.00
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B:- New Construction $35.25 $27.30 $62.55 $0.00 $0.00 $0.00 $0.00
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS- Establishment Warranty Period $31.59 $29.89 $61.48 $0.00 $0.00 $0.00 $0.00
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS- New Construction $37.90 $29.89 $67.79 $0.00 $0.00 $0.00 $0.00
LABORER: GARDENERS, HORTICULURAL & LANDSCAPE LABORERS - AREA A:- Establishment Warranty Period $29.94 $27.30 $57.24 $0.00 $0.00 $0.00 $0.00
LABORER: GARDENERS, HORTICULURAL & LANDSCAPE LABORERS - AREA A:- New Construction $36.25 $27.30 $63.55 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER-BRICK $36.29 $25.55 $61.84 $0.00 $0.00 $0.00 $0.00
LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BE $36.55 $27.30 $63.85 $0.00 $0.00 $0.00 $0.00
LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BE $35.55 $27.30 $62.85 $0.00 $0.00 $0.00 $0.00
LABORERS:, GUNITE - AREA A: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFO $36.96 $27.30 $64.26 $0.00 $0.00 $0.00 $0.00
LABORERS:, GUNITE - AREA A: GROUP 4 GUNITE LABORER FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEI $36.37 $27.30 $63.67 $0.00 $0.00 $0.00 $0.00
LABORERS:, GUNITE - AREA A:: GROUP 1 $37.46 $27.30 $64.76 $0.00 $0.00 $0.00 $0.00
LANDSCAPE/IRRIGATION FITTER: UNDERGROUND/UTILITY FITTER $77.35 $36.53 $113.88 $0.00 $0.00 $0.00 $0.00
LEAD INSTALLER AREA 3.$ 27.96 23.03 LEAD INSTALLER AREA 2.$ 29.08 23.03 LEAD INSTALLER AREA 1.$ 32.21 23.03 INSTALLER AREA 3 $25.16 $22.53 $47.69 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: EQUIPMENT SPECIALIST (OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES, OVERHEAD & UNDERGROUND DIS $53.30 $22.26 $75.56 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DA $40.76 $21.76 $62.52 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMAN; CABLE SPLICER HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVI $70.16 $24.71 $94.87 $0.00 $0.00 $0.00 $0.00
MARBLE FINISHER $42.06 $19.80 $61.86 $0.00 $0.00 $0.00 $0.00
MARBLE MASON $61.72 $30.31 $92.03 $0.00 $0.00 $0.00 $0.00
MASON TENDER, BRICK SAN FRANCISCO AND SAN MATEO COUNTIES FOOTNOTES: UNDERGROUND WORK SUCH AS SEWERS, MANHOLES, CATCH BASINS, SEWER PIPES, TELEPHONE CO $37.05 $27.45 $64.50 $0.00 $0.00 $0.00 $0.00
MASTER INSTALLER AREA 1 $36.43 $23.03 $59.46 $0.00 $0.00 $0.00 $0.00
MASTER INSTALLER AREA 2 $32.71 $23.03 $55.74 $0.00 $0.00 $0.00 $0.00
MASTER INSTALLER AREA 3 $31.38 $23.03 $54.41 $0.00 $0.00 $0.00 $0.00
MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF PO $36.72 $27.30 $64.02 $0.00 $0.00 $0.00 $0.00
MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF PO $35.72 $27.30 $63.02 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 1 $66.96 $32.53 $99.49 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 2 $65.43 $32.53 $97.96 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 3 $63.95 $32.53 $96.48 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 4 $62.57 $32.53 $95.10 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 5 $61.30 $32.53 $93.83 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 6 $59.98 $32.53 $92.51 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 7 $58.84 $32.53 $91.37 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 8 $57.70 $32.53 $90.23 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 8-A $55.49 $32.53 $88.02 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 1 $68.59 $32.53 $101.12 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 2 $66.08 $32.53 $98.61 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 3 $59.98 $32.53 $92.51 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 3 $64.34 $32.53 $96.87 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 4 $61.30 $32.53 $93.83 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1 $57.85 $28.56 $86.41 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1 $55.85 $28.56 $84.41 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2 $54.25 $28.56 $82.81 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2 $52.25 $28.56 $80.81 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3 $49.64 $28.56 $78.20 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3 $47.64 $28.56 $76.20 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 1 $45.66 $31.15 $76.81 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 1 $43.38 $31.15 $74.53 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 1 $52.64 $31.15 $83.79 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 2 $45.41 $31.15 $76.56 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 2 $43.11 $31.15 $74.26 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 2 $50.82 $31.15 $81.97 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 3 $45.12 $31.15 $76.27 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 3 $42.89 $31.15 $74.04 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 3 $49.14 $31.15 $80.29 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 4 $47.37 $31.15 $78.52 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 5 $44.73 $31.15 $75.88 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 6 $42.50 $31.15 $73.65 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 1 $68.81 $32.53 $101.34 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 2 $67.04 $32.53 $99.57 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 3 $65.56 $32.53 $98.09 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 4 $63.54 $32.53 $96.07 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 5 $62.24 $32.53 $94.77 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES $58.19 $32.53 $90.72 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES $59.33 $32.53 $91.86 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES $60.47 $32.53 $93.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES $61.80 $32.53 $94.33 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES:.$ 65.53 32.53 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGRO $63.06 $32.53 $95.59 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND $58.09 $32.53 $90.62 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND $59.23 $32.53 $91.76 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND $60.37 $32.53 $92.90 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND $61.70 $32.53 $94.23 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND $65.43 $32.53 $97.96 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND $62.96 $32.53 $95.49 $0.00 $0.00 $0.00 $0.00
PAINTER $57.00 $28.04 $85.04 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER FOOTNOTE: SPRAY PAINTERS & PAPERHANGERS RECIVE $1.00 ADDITIONAL PER HOUR. PAINTERS DOING DRYWALL PATCHING RECEIVE $1.25 ADDITIO $34.49 $21.80 $56.29 $0.00 $0.00 $0.00 $0.00
PAINTER: DRYWALL FINISHER/TAPER FOOTNOTE: SPRAY PAINTERS & PAPERHANGERS RECIVE $1.00 ADDITIONAL PER HOUR. PAINTERS DOING DRYWALL PATCHING RECEIVE $1.2 $35.74 $21.80 $57.54 $0.00 $0.00 $0.00 $0.00
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMEMT: GROUP 2 GAMECOURT & PLAYGROUND INSTALLER $34.71 $17.62 $52.33 $0.00 $0.00 $0.00 $0.00
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 1 STRIPER: LAYOUT AND APPLICATION OF PAINTED TRAFFIC STRIPES AND MARKING; HOT THERMO $40.83 $17.62 $58.45 $0.00 $0.00 $0.00 $0.00
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 3 PROTECTIVE COATING, PAVEMENT SEALING $35.11 $17.62 $52.73 $0.00 $0.00 $0.00 $0.00
PILEDRIVER $54.10 $34.69 $88.79 $0.00 $0.00 $0.00 $0.00
PIPEFITTER: CONTRA COSTA COUNTY $80.50 $50.45 $130.95 $0.00 $0.00 $0.00 $0.00
PLASTER TENDER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL $41.93 $30.32 $72.25 $0.00 $0.00 $0.00 $0.00
PLASTERER $42.41 $30.73 $73.14 $0.00 $0.00 $0.00 $0.00
PLASTERER $32.88 $31.68 $64.56 $0.00 $0.00 $0.00 $0.00
PLASTERER $32.70 $31.68 $64.38 $0.00 $0.00 $0.00 $0.00
PLASTERER TENDER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL $39.77 $28.54 $68.31 $0.00 $0.00 $0.00 $0.00
PLASTERER TENDER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL $41.93 $30.32 $72.25 $0.00 $0.00 $0.00 $0.00
PLUMBER & STEAMFITTER $57.75 $43.60 $101.35 $0.00 $0.00 $0.00 $0.00
PLUMBER & STEAMFITTER $54.50 $42.54 $97.04 $0.00 $0.00 $0.00 $0.00
PLUMBER & STEAMFITTER $58.45 $38.74 $97.19 $0.00 $0.00 $0.00 $0.00
PLUMBER AND STEAMFITTER: ALL OTHER WORK $68.57 $49.04 $117.61 $0.00 $0.00 $0.00 $0.00
PLUMBER AND STEAMFITTER: REFRIGERATION $67.68 $49.04 $116.72 $0.00 $0.00 $0.00 $0.00
PLUMBER, PIPEFITTER, STEAMFITTER $80.50 $50.45 $130.95 $0.00 $0.00 $0.00 $0.00
PLUMBER, PLUMBER, STEAMFITTER, REFRIGERATION FITTER $85.50 $48.98 $134.48 $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER $68.76 $46.63 $115.39 $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER/STEAMFITTER $87.75 $41.44 $129.19 $0.00 $0.00 $0.00 $0.00
PLUMBER: PIPE TRADESMAN PIPE TRADESMAN SCOPE OF WORK: INSTALLATION OF CORRUGATED METAL PIPING FOR DRAINAGE, AS WELL AS INSTALLATION OF CORRUGATED META $13.00 $10.74 $23.74 $0.00 $0.00 $0.00 $0.00
ROOFER $45.76 $16.86 $62.62 $0.00 $0.00 $0.00 $0.00
ROOFER $55.30 $22.97 $78.27 $0.00 $0.00 $0.00 $0.00
ROOFER $54.94 $23.34 $78.28 $0.00 $0.00 $0.00 $0.00
ROOFER $49.65 $22.19 $71.84 $0.00 $0.00 $0.00 $0.00
ROOFER: BITUMASTIC, ENAMELER, COAL TAR, PITCH AND MASTIC WORKER $57.17 $21.51 $78.68 $0.00 $0.00 $0.00 $0.00
ROOFER: JOURNEYMAN $53.17 $21.51 $74.68 $0.00 $0.00 $0.00 $0.00
ROOFER: KETTLE PERSON $55.17 $21.51 $76.68 $0.00 $0.00 $0.00 $0.00
SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. IN THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DE $37.05 $27.30 $64.35 $0.00 $0.00 $0.00 $0.00
SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. IN THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DE $36.05 $27.30 $63.35 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $64.23 $39.65 $103.88 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $44.34 $39.22 $83.56 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $44.07 $40.79 $84.86 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: EXCLUDING METAL DECK AND SIDING $41.28 $45.41 $86.69 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: METAL DECKING AND SIDING ONLY ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SANTA CRUZ CO $56.23 $37.52 $93.75 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: METAL DECKING AND SIDING ONLY CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES $56.23 $37.52 $93.75 $0.00 $0.00 $0.00 $0.00
SOFT FLOOR LAYER $38.53 $23.19 $61.72 $0.00 $0.00 $0.00 $0.00
SOFT FLOOR LAYER $48.54 $26.59 $75.13 $0.00 $0.00 $0.00 $0.00
SOFT FLOOR LAYER ALAMEDA, CONTRA COSTA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SANTA CRUZ COUNTIES $59.00 $33.03 $92.03 $0.00 $0.00 $0.00 $0.00
SOUND & COMMUNICATIONS, INSTALLER $47.93 $24.09 $72.02 $0.00 $0.00 $0.00 $0.00
SOUND & COMMUNICATIONS, TECHNICIAN SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL O $55.12 $24.30 $79.42 $0.00 $0.00 $0.00 $0.00
SOUND & COMMUNICATIONS: INSTALLER SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OT $58.83 $31.51 $90.34 $0.00 $0.00 $0.00 $0.00
SOUND & COMMUNICATIONS: INSTALLER SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OT $53.08 $30.84 $83.92 $0.00 $0.00 $0.00 $0.00
SOUND & COMMUNICATIONS: INSTALLER SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OT $58.33 $31.00 $89.33 $0.00 $0.00 $0.00 $0.00
SOUND & COMMUNICATIONS: INSTALLER..$ 58.33 31.00 SOUND & COMMUNICATIONS, TECHNICIAN SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO $67.08 $31.26 $98.34 $0.00 $0.00 $0.00 $0.00
SOUND & COMMUNICATIONS: TECHNICIAN SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL O $67.65 $31.78 $99.43 $0.00 $0.00 $0.00 $0.00
SOUND & COMMUNICATIONS: TECHNICIAN SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL O $61.04 $31.08 $92.12 $0.00 $0.00 $0.00 $0.00
SOUND & COMMUNICATIONS: TECHNICIAN SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL O $67.08 $31.26 $98.34 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS AND TUOLUMNE COUNTIES $49.69 $29.72 $79.41 $0.00 $0.00 $0.00 $0.00
TERRA COBRA, LETOURNEAU PULLS, TOURNOROCKER, EUCLID AND SIMILAR TYPE EQUIPMENT WHEN PULLING FUEL AND/OR GREASE TANK TRAILERS OR OTHER MISCELLANEOUS TR $44.21 $34.28 $78.49 $0.00 $0.00 $0.00 $0.00
TERRAZZO FINISHER $44.93 $20.98 $65.91 $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER/SETTER $60.58 $29.79 $90.37 $0.00 $0.00 $0.00 $0.00
THE CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY: AREA 1: WESTERN PORTION AREA 2: REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER $62.61 $39.55 $102.16 $0.00 $0.00 $0.00 $0.00
THE CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY: AREA 1: WESTERN PORTION AREA 2: REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER $60.61 $39.55 $100.16 $0.00 $0.00 $0.00 $0.00
TILE FINISHER AREA 1 $37.75 $19.28 $57.03 $0.00 $0.00 $0.00 $0.00
TILE FINISHER AREA 2 $34.76 $19.22 $53.98 $0.00 $0.00 $0.00 $0.00
TILE FINISHER AREA 3 $32.68 $18.32 $51.00 $0.00 $0.00 $0.00 $0.00
TILE LAYER AREA 1 $59.92 $22.62 $82.54 $0.00 $0.00 $0.00 $0.00
TILE LAYER AREA 2 $55.17 $22.52 $77.69 $0.00 $0.00 $0.00 $0.00
TILE LAYER AREA 3 $50.28 $22.05 $72.33 $0.00 $0.00 $0.00 $0.00
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDE $37.20 $27.30 $64.50 $0.00 $0.00 $0.00 $0.00
TRUCK; BULK CEMENT SPREADER; DUMPCRETE TRUCK; SKID TRUCK; DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YA $44.56 $34.28 $78.84 $0.00 $0.00 $0.00 $0.00
TUNNEL AND SHAFT LABORERS: GROUP 1 DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN $45.89 $27.72 $73.61 $0.00 $0.00 $0.00 $0.00
TUNNEL AND SHAFT LABORERS: GROUP 1: DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN $45.89 $27.72 $73.61 $0.00 $0.00 $0.00 $0.00
TUNNEL AND SHAFT LABORERS: GROUP 2 RODMEN; SHAFT WORK & RAISE $45.66 $27.72 $73.38 $0.00 $0.00 $0.00 $0.00
TUNNEL AND SHAFT LABORERS: GROUP 3 BIT GRINDER; BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER IN TUN $45.41 $27.72 $73.13 $0.00 $0.00 $0.00 $0.00
TUNNEL AND SHAFT LABORERS: GROUP 4 VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING $44.96 $27.72 $72.68 $0.00 $0.00 $0.00 $0.00
TUNNEL AND SHAFT LABORERS: GROUP 5 GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN $44.42 $27.72 $72.14 $0.00 $0.00 $0.00 $0.00
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST $46.41 $27.72 $74.13 $0.00 $0.00 $0.00 $0.00
TUNNEL AND SHAFT LABORERS:, GROUP 1 DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN $45.89 $27.72 $73.61 $0.00 $0.00 $0.00 $0.00
TUNNEL AND SHAFT LABORERS:, GROUP 2 RODMEN; SHAFT WORK & RAISE $45.66 $27.72 $73.38 $0.00 $0.00 $0.00 $0.00
TUNNEL AND SHAFT LABORERS:, GROUP 3 BIT GRINDER; BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER IN TU $45.41 $27.72 $73.13 $0.00 $0.00 $0.00 $0.00
TUNNEL AND SHAFT LABORERS:, GROUP 4 VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING $44.96 $27.72 $72.68 $0.00 $0.00 $0.00 $0.00
TUNNEL AND SHAFT LABORERS:, GROUP 5 GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN $44.42 $27.72 $72.14 $0.00 $0.00 $0.00 $0.00
TUNNEL AND SHAFT LABORERS:, GROUP 5 GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN.$ 44.42 27.72 TUNNEL AND SHAFT LABORERS:, GROUP 4 VIBRATOR OPERATOR, PAV $44.96 $27.72 $72.68 $0.00 $0.00 $0.00 $0.00
UNDERGROUND UTILITY WORKER: /LANDSCAPE FITTER ALAMEDA, CALAVERAS, CONTRA COSTA, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN JOA $36.01 $18.50 $54.51 $0.00 $0.00 $0.00 $0.00
UNIT); HIGHBED HEAVY DUTY TRANSPORT; SCISSOR TRUCK; RUBBER-TIRED MUCK CAR; RUBBER-TIRED TRUCK JUMBO; WINCH TRUCK AND ""A"" FRAME DRIVERS; COMBINATION $43.56 $34.28 $77.84 $0.00 $0.00 $0.00 $0.00
WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER INCLUDI $35.50 $27.30 $62.80 $0.00 $0.00 $0.00 $0.00
WATER TRUCKS, 7,000 GALS. AND OVER; JETTING TRUCKS, 7,000 GALS. AND OVER; VACUUM TRUCKS UNDER 7500 GALS. TRUCKS TOWING TILT BED OR FLAT BED PULL TRAIL $43.86 $34.28 $78.14 $0.00 $0.00 $0.00 $0.00
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL $31.59 $29.89 $61.48 $0.00 $0.00 $0.00 $0.00
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL $37.90 $29.89 $67.79 $0.00 $0.00 $0.00 $0.00
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL $38.00 $29.89 $67.89 $0.00 $0.00 $0.00 $0.00
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL $38.20 $29.89 $68.09 $0.00 $0.00 $0.00 $0.00
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL $38.37 $29.89 $68.26 $0.00 $0.00 $0.00 $0.00
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL $37.08 $27.30 $64.38 $0.00 $0.00 $0.00 $0.00
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL $36.55 $27.30 $63.85 $0.00 $0.00 $0.00 $0.00
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL $36.05 $27.30 $63.35 $0.00 $0.00 $0.00 $0.00
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL $35.50 $27.30 $62.80 $0.00 $0.00 $0.00 $0.00
View all WDs for Tuolumne → Revision history →