MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF PO — Prevailing Wage Rates

Davis-Bacon prevailing wages for MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 246 Davis-Bacon rate records nationwide, the median total package (base + fringe) for MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF PO is $63.52/hr, with the middle 80% of counties paying between $63.02 and $64.02/hr. The highest state average is California at $63.52/hr; the lowest is California at $63.52/hr.

Bottom 10%
$63.02
Median
$63.52
Average
$63.52
Top 10%
$64.02

Range: $63.02 – $64.02/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

California CA
Avg base: $36.22/hr
Avg total: $63.52/hr
246 rates

All Rates

246 county-level rates for MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF PO, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Alameda CA heavy $35.72 $27.30 $63.02 WD →
Alameda CA heavy $36.72 $27.30 $64.02 WD →
Alameda CA highway $36.72 $27.30 $64.02 WD →
Alameda CA building $35.72 $27.30 $63.02 WD →
Alameda CA highway $35.72 $27.30 $63.02 WD →
Alameda CA building $36.72 $27.30 $64.02 WD →
Alpine CA highway $36.72 $27.30 $64.02 WD →
Alpine CA building $35.72 $27.30 $63.02 WD →
Alpine CA highway $35.72 $27.30 $63.02 WD →
Alpine CA heavy $36.72 $27.30 $64.02 WD →
Alpine CA heavy $35.72 $27.30 $63.02 WD →
Alpine CA building $36.72 $27.30 $64.02 WD →
Amador CA heavy $35.72 $27.30 $63.02 WD →
Amador CA building $35.72 $27.30 $63.02 WD →
Amador CA heavy $36.72 $27.30 $64.02 WD →
Amador CA highway $36.72 $27.30 $64.02 WD →
Amador CA highway $35.72 $27.30 $63.02 WD →
Amador CA building $36.72 $27.30 $64.02 WD →
Butte CA building $35.72 $27.30 $63.02 WD →
Butte CA highway $35.72 $27.30 $63.02 WD →
Butte CA heavy $36.72 $27.30 $64.02 WD →
Butte CA building $36.72 $27.30 $64.02 WD →
Butte CA highway $36.72 $27.30 $64.02 WD →
Butte CA heavy $35.72 $27.30 $63.02 WD →
Calaveras CA heavy $36.72 $27.30 $64.02 WD →
Calaveras CA building $36.72 $27.30 $64.02 WD →
Calaveras CA heavy $35.72 $27.30 $63.02 WD →
Calaveras CA highway $36.72 $27.30 $64.02 WD →
Calaveras CA highway $35.72 $27.30 $63.02 WD →
Calaveras CA building $35.72 $27.30 $63.02 WD →
Colusa CA building $35.72 $27.30 $63.02 WD →
Colusa CA heavy $36.72 $27.30 $64.02 WD →
Colusa CA highway $35.72 $27.30 $63.02 WD →
Colusa CA highway $36.72 $27.30 $64.02 WD →
Colusa CA building $36.72 $27.30 $64.02 WD →
Colusa CA heavy $35.72 $27.30 $63.02 WD →
Contra Costa CA building $36.72 $27.30 $64.02 WD →
Contra Costa CA heavy $35.72 $27.30 $63.02 WD →
Contra Costa CA heavy $36.72 $27.30 $64.02 WD →
Contra Costa CA highway $35.72 $27.30 $63.02 WD →
Contra Costa CA highway $36.72 $27.30 $64.02 WD →
Contra Costa CA building $35.72 $27.30 $63.02 WD →
El Dorado CA building $36.72 $27.30 $64.02 WD →
El Dorado CA highway $35.72 $27.30 $63.02 WD →
El Dorado CA heavy $35.72 $27.30 $63.02 WD →
El Dorado CA highway $36.72 $27.30 $64.02 WD →
El Dorado CA heavy $36.72 $27.30 $64.02 WD →
El Dorado CA building $35.72 $27.30 $63.02 WD →
Fresno CA highway $36.72 $27.30 $64.02 WD →
Fresno CA building $36.72 $27.30 $64.02 WD →
Fresno CA heavy $35.72 $27.30 $63.02 WD →
Fresno CA heavy $36.72 $27.30 $64.02 WD →
Fresno CA highway $35.72 $27.30 $63.02 WD →
Fresno CA building $35.72 $27.30 $63.02 WD →
Glenn CA building $35.72 $27.30 $63.02 WD →
Glenn CA building $36.72 $27.30 $64.02 WD →
Glenn CA highway $36.72 $27.30 $64.02 WD →
Glenn CA highway $35.72 $27.30 $63.02 WD →
Glenn CA heavy $36.72 $27.30 $64.02 WD →
Glenn CA heavy $35.72 $27.30 $63.02 WD →
Kings CA building $35.72 $27.30 $63.02 WD →
Kings CA heavy $35.72 $27.30 $63.02 WD →
Kings CA heavy $36.72 $27.30 $64.02 WD →
Kings CA building $36.72 $27.30 $64.02 WD →
Kings CA highway $36.72 $27.30 $64.02 WD →
Kings CA highway $35.72 $27.30 $63.02 WD →
Lassen CA heavy $36.72 $27.30 $64.02 WD →
Lassen CA highway $35.72 $27.30 $63.02 WD →
Lassen CA heavy $35.72 $27.30 $63.02 WD →
Lassen CA building $36.72 $27.30 $64.02 WD →
Lassen CA highway $36.72 $27.30 $64.02 WD →
Lassen CA building $35.72 $27.30 $63.02 WD →
Madera CA building $35.72 $27.30 $63.02 WD →
Madera CA heavy $35.72 $27.30 $63.02 WD →
Madera CA building $36.72 $27.30 $64.02 WD →
Madera CA highway $35.72 $27.30 $63.02 WD →
Madera CA highway $36.72 $27.30 $64.02 WD →
Madera CA heavy $36.72 $27.30 $64.02 WD →
Marin CA heavy $35.72 $27.30 $63.02 WD →
Marin CA building $36.72 $27.30 $64.02 WD →
Marin CA highway $35.72 $27.30 $63.02 WD →
Marin CA heavy $36.72 $27.30 $64.02 WD →
Marin CA highway $36.72 $27.30 $64.02 WD →
Marin CA building $35.72 $27.30 $63.02 WD →
Mariposa CA building $35.72 $27.30 $63.02 WD →
Mariposa CA building $36.72 $27.30 $64.02 WD →
Mariposa CA heavy $35.72 $27.30 $63.02 WD →
Mariposa CA heavy $36.72 $27.30 $64.02 WD →
Mariposa CA highway $35.72 $27.30 $63.02 WD →
Mariposa CA highway $36.72 $27.30 $64.02 WD →
Merced CA building $36.72 $27.30 $64.02 WD →
Merced CA heavy $35.72 $27.30 $63.02 WD →
Merced CA heavy $36.72 $27.30 $64.02 WD →
Merced CA highway $35.72 $27.30 $63.02 WD →
Merced CA highway $36.72 $27.30 $64.02 WD →
Merced CA building $35.72 $27.30 $63.02 WD →
Modoc CA building $35.72 $27.30 $63.02 WD →
Modoc CA heavy $35.72 $27.30 $63.02 WD →
Modoc CA building $36.72 $27.30 $64.02 WD →
Modoc CA heavy $36.72 $27.30 $64.02 WD →
Top-paying counties for MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF PO →