LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES; BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPP — Prevailing Wage Rates

Davis-Bacon prevailing wages for LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES; BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 51 Davis-Bacon rate records nationwide, the median total package (base + fringe) for LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES; BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPP is $68.04/hr, with the middle 80% of counties paying between $68.04 and $68.04/hr. The highest state average is California at $68.04/hr; the lowest is California at $68.04/hr.

Bottom 10%
$68.04
Median
$68.04
Average
$68.04
Top 10%
$68.04

Range: $68.04 – $68.04/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2061Construction Laborers.

Davis-Bacon median
$68.04/hr
National median total package (base + fringe)
BLS OEWS market median
$22.47/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+202.8%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

California CA
Avg base: $38.15/hr
Avg total: $68.04/hr
51 rates

All Rates

51 county-level rates for LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES; BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPP, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Alameda CA highway $38.15 $29.89 $68.04 WD →
Alameda CA building $38.15 $29.89 $68.04 WD →
Alameda CA heavy $38.15 $29.89 $68.04 WD →
Calaveras CA building $38.15 $29.89 $68.04 WD →
Calaveras CA heavy $38.15 $29.89 $68.04 WD →
Calaveras CA highway $38.15 $29.89 $68.04 WD →
Contra Costa CA highway $38.15 $29.89 $68.04 WD →
Contra Costa CA building $38.15 $29.89 $68.04 WD →
Contra Costa CA heavy $38.15 $29.89 $68.04 WD →
Fresno CA building $38.15 $29.89 $68.04 WD →
Fresno CA highway $38.15 $29.89 $68.04 WD →
Fresno CA heavy $38.15 $29.89 $68.04 WD →
Kings CA heavy $38.15 $29.89 $68.04 WD →
Kings CA building $38.15 $29.89 $68.04 WD →
Kings CA highway $38.15 $29.89 $68.04 WD →
Madera CA building $38.15 $29.89 $68.04 WD →
Madera CA highway $38.15 $29.89 $68.04 WD →
Madera CA heavy $38.15 $29.89 $68.04 WD →
Mariposa CA highway $38.15 $29.89 $68.04 WD →
Mariposa CA heavy $38.15 $29.89 $68.04 WD →
Mariposa CA building $38.15 $29.89 $68.04 WD →
Merced CA building $38.15 $29.89 $68.04 WD →
Merced CA highway $38.15 $29.89 $68.04 WD →
Merced CA heavy $38.15 $29.89 $68.04 WD →
Monterey CA highway $38.15 $29.89 $68.04 WD →
Monterey CA building $38.15 $29.89 $68.04 WD →
Monterey CA heavy $38.15 $29.89 $68.04 WD →
San Benito CA building $38.15 $29.89 $68.04 WD →
San Benito CA heavy $38.15 $29.89 $68.04 WD →
San Benito CA highway $38.15 $29.89 $68.04 WD →
San Francisco CA heavy $38.15 $29.89 $68.04 WD →
San Francisco CA building $38.15 $29.89 $68.04 WD →
San Francisco CA highway $38.15 $29.89 $68.04 WD →
San Joaquin CA building $38.15 $29.89 $68.04 WD →
San Joaquin CA heavy $38.15 $29.89 $68.04 WD →
San Joaquin CA highway $38.15 $29.89 $68.04 WD →
San Mateo CA heavy $38.15 $29.89 $68.04 WD →
San Mateo CA building $38.15 $29.89 $68.04 WD →
San Mateo CA highway $38.15 $29.89 $68.04 WD →
Santa Clara CA heavy $38.15 $29.89 $68.04 WD →
Santa Clara CA highway $38.15 $29.89 $68.04 WD →
Santa Clara CA building $38.15 $29.89 $68.04 WD →
Santa Cruz CA building $38.15 $29.89 $68.04 WD →
Santa Cruz CA heavy $38.15 $29.89 $68.04 WD →
Santa Cruz CA highway $38.15 $29.89 $68.04 WD →
Stanislaus CA highway $38.15 $29.89 $68.04 WD →
Stanislaus CA building $38.15 $29.89 $68.04 WD →
Stanislaus CA heavy $38.15 $29.89 $68.04 WD →
Tuolumne CA building $38.15 $29.89 $68.04 WD →
Tuolumne CA highway $38.15 $29.89 $68.04 WD →
Tuolumne CA heavy $38.15 $29.89 $68.04 WD →
Top-paying counties for LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES; BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPP →