AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; J — Prevailing Wage Rates

Davis-Bacon prevailing wages for AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; Js across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 195 Davis-Bacon rate records nationwide, the median total package (base + fringe) for AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; J is $62.55/hr, with the middle 80% of counties paying between $62.55 and $63.55/hr. The highest state average is California at $62.92/hr; the lowest is California at $62.92/hr.

Bottom 10%
$62.55
Median
$62.55
Average
$62.92
Top 10%
$63.55

Range: $62.55 – $63.55/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

California CA
Avg base: $35.62/hr
Avg total: $62.92/hr
195 rates

All Rates

195 county-level rates for AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; J, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Alameda CA highway $35.25 $27.30 $62.55 WD →
Alameda CA heavy $35.25 $27.30 $62.55 WD →
Alameda CA building $35.25 $27.30 $62.55 WD →
Alpine CA heavy $35.25 $27.30 $62.55 WD →
Alpine CA highway $36.25 $27.30 $63.55 WD →
Alpine CA building $35.25 $27.30 $62.55 WD →
Alpine CA highway $35.25 $27.30 $62.55 WD →
Alpine CA heavy $36.25 $27.30 $63.55 WD →
Alpine CA building $36.25 $27.30 $63.55 WD →
Amador CA heavy $35.25 $27.30 $62.55 WD →
Amador CA highway $35.25 $27.30 $62.55 WD →
Amador CA building $36.25 $27.30 $63.55 WD →
Amador CA building $35.25 $27.30 $62.55 WD →
Amador CA heavy $36.25 $27.30 $63.55 WD →
Amador CA highway $36.25 $27.30 $63.55 WD →
Butte CA highway $36.25 $27.30 $63.55 WD →
Butte CA heavy $36.25 $27.30 $63.55 WD →
Butte CA building $36.25 $27.30 $63.55 WD →
Butte CA building $35.25 $27.30 $62.55 WD →
Butte CA heavy $35.25 $27.30 $62.55 WD →
Butte CA highway $35.25 $27.30 $62.55 WD →
Calaveras CA building $35.25 $27.30 $62.55 WD →
Calaveras CA highway $35.25 $27.30 $62.55 WD →
Calaveras CA heavy $35.25 $27.30 $62.55 WD →
Colusa CA building $36.25 $27.30 $63.55 WD →
Colusa CA heavy $35.25 $27.30 $62.55 WD →
Colusa CA heavy $36.25 $27.30 $63.55 WD →
Colusa CA highway $36.25 $27.30 $63.55 WD →
Colusa CA highway $35.25 $27.30 $62.55 WD →
Colusa CA building $35.25 $27.30 $62.55 WD →
Contra Costa CA building $35.25 $27.30 $62.55 WD →
Contra Costa CA heavy $35.25 $27.30 $62.55 WD →
Contra Costa CA highway $35.25 $27.30 $62.55 WD →
El Dorado CA heavy $35.25 $27.30 $62.55 WD →
El Dorado CA heavy $36.25 $27.30 $63.55 WD →
El Dorado CA highway $36.25 $27.30 $63.55 WD →
El Dorado CA highway $35.25 $27.30 $62.55 WD →
El Dorado CA building $36.25 $27.30 $63.55 WD →
El Dorado CA building $35.25 $27.30 $62.55 WD →
Fresno CA highway $35.25 $27.30 $62.55 WD →
Fresno CA heavy $35.25 $27.30 $62.55 WD →
Fresno CA building $35.25 $27.30 $62.55 WD →
Glenn CA highway $35.25 $27.30 $62.55 WD →
Glenn CA building $36.25 $27.30 $63.55 WD →
Glenn CA building $35.25 $27.30 $62.55 WD →
Glenn CA heavy $36.25 $27.30 $63.55 WD →
Glenn CA heavy $35.25 $27.30 $62.55 WD →
Glenn CA highway $36.25 $27.30 $63.55 WD →
Kings CA heavy $35.25 $27.30 $62.55 WD →
Kings CA building $35.25 $27.30 $62.55 WD →
Kings CA highway $35.25 $27.30 $62.55 WD →
Lassen CA heavy $35.25 $27.30 $62.55 WD →
Lassen CA heavy $36.25 $27.30 $63.55 WD →
Lassen CA highway $35.25 $27.30 $62.55 WD →
Lassen CA building $35.25 $27.30 $62.55 WD →
Lassen CA building $36.25 $27.30 $63.55 WD →
Lassen CA highway $36.25 $27.30 $63.55 WD →
Madera CA building $35.25 $27.30 $62.55 WD →
Madera CA heavy $35.25 $27.30 $62.55 WD →
Madera CA highway $35.25 $27.30 $62.55 WD →
Marin CA building $35.25 $27.30 $62.55 WD →
Marin CA highway $36.25 $27.30 $63.55 WD →
Marin CA highway $35.25 $27.30 $62.55 WD →
Marin CA heavy $36.25 $27.30 $63.55 WD →
Marin CA heavy $35.25 $27.30 $62.55 WD →
Marin CA building $36.25 $27.30 $63.55 WD →
Mariposa CA highway $35.25 $27.30 $62.55 WD →
Mariposa CA heavy $35.25 $27.30 $62.55 WD →
Mariposa CA building $35.25 $27.30 $62.55 WD →
Merced CA highway $35.25 $27.30 $62.55 WD →
Merced CA heavy $35.25 $27.30 $62.55 WD →
Merced CA building $35.25 $27.30 $62.55 WD →
Modoc CA building $36.25 $27.30 $63.55 WD →
Modoc CA highway $35.25 $27.30 $62.55 WD →
Modoc CA highway $36.25 $27.30 $63.55 WD →
Modoc CA heavy $36.25 $27.30 $63.55 WD →
Modoc CA heavy $35.25 $27.30 $62.55 WD →
Modoc CA building $35.25 $27.30 $62.55 WD →
Monterey CA highway $35.25 $27.30 $62.55 WD →
Monterey CA building $35.25 $27.30 $62.55 WD →
Monterey CA heavy $35.25 $27.30 $62.55 WD →
Napa CA heavy $35.25 $27.30 $62.55 WD →
Napa CA building $35.25 $27.30 $62.55 WD →
Napa CA building $36.25 $27.30 $63.55 WD →
Napa CA highway $35.25 $27.30 $62.55 WD →
Napa CA highway $36.25 $27.30 $63.55 WD →
Napa CA heavy $36.25 $27.30 $63.55 WD →
Nevada CA heavy $36.25 $27.30 $63.55 WD →
Nevada CA highway $35.25 $27.30 $62.55 WD →
Nevada CA building $36.25 $27.30 $63.55 WD →
Nevada CA heavy $35.25 $27.30 $62.55 WD →
Nevada CA building $35.25 $27.30 $62.55 WD →
Nevada CA highway $36.25 $27.30 $63.55 WD →
Placer CA highway $35.25 $27.30 $62.55 WD →
Placer CA building $36.25 $27.30 $63.55 WD →
Placer CA building $35.25 $27.30 $62.55 WD →
Placer CA highway $36.25 $27.30 $63.55 WD →
Placer CA heavy $36.25 $27.30 $63.55 WD →
Placer CA heavy $35.25 $27.30 $62.55 WD →
Plumas CA highway $36.25 $27.30 $63.55 WD →
Top-paying counties for AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; J →