LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE — Prevailing Wage Rates

Davis-Bacon prevailing wages for LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGEs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 102 Davis-Bacon rate records nationwide, the median total package (base + fringe) for LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE is $64.36/hr, with the middle 80% of counties paying between $63.86 and $64.86/hr. The highest state average is California at $64.36/hr; the lowest is California at $64.36/hr.

Bottom 10%
$63.86
Median
$64.36
Average
$64.36
Top 10%
$64.86

Range: $63.86 – $64.86/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2061Construction Laborers.

Davis-Bacon median
$64.36/hr
National median total package (base + fringe)
BLS OEWS market median
$22.47/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+186.4%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

California CA
Avg base: $37.06/hr
Avg total: $64.36/hr
102 rates

All Rates

102 county-level rates for LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Alameda CA building $37.56 $27.30 $64.86 WD →
Alameda CA heavy $37.56 $27.30 $64.86 WD →
Alameda CA highway $36.56 $27.30 $63.86 WD →
Alameda CA highway $37.56 $27.30 $64.86 WD →
Alameda CA heavy $36.56 $27.30 $63.86 WD →
Alameda CA building $36.56 $27.30 $63.86 WD →
Calaveras CA highway $37.56 $27.30 $64.86 WD →
Calaveras CA heavy $37.56 $27.30 $64.86 WD →
Calaveras CA heavy $36.56 $27.30 $63.86 WD →
Calaveras CA building $37.56 $27.30 $64.86 WD →
Calaveras CA building $36.56 $27.30 $63.86 WD →
Calaveras CA highway $36.56 $27.30 $63.86 WD →
Contra Costa CA heavy $36.56 $27.30 $63.86 WD →
Contra Costa CA heavy $37.56 $27.30 $64.86 WD →
Contra Costa CA building $36.56 $27.30 $63.86 WD →
Contra Costa CA building $37.56 $27.30 $64.86 WD →
Contra Costa CA highway $37.56 $27.30 $64.86 WD →
Contra Costa CA highway $36.56 $27.30 $63.86 WD →
Fresno CA highway $36.56 $27.30 $63.86 WD →
Fresno CA highway $37.56 $27.30 $64.86 WD →
Fresno CA building $36.56 $27.30 $63.86 WD →
Fresno CA building $37.56 $27.30 $64.86 WD →
Fresno CA heavy $37.56 $27.30 $64.86 WD →
Fresno CA heavy $36.56 $27.30 $63.86 WD →
Kings CA highway $37.56 $27.30 $64.86 WD →
Kings CA heavy $36.56 $27.30 $63.86 WD →
Kings CA building $36.56 $27.30 $63.86 WD →
Kings CA building $37.56 $27.30 $64.86 WD →
Kings CA heavy $37.56 $27.30 $64.86 WD →
Kings CA highway $36.56 $27.30 $63.86 WD →
Madera CA building $37.56 $27.30 $64.86 WD →
Madera CA heavy $36.56 $27.30 $63.86 WD →
Madera CA heavy $37.56 $27.30 $64.86 WD →
Madera CA highway $37.56 $27.30 $64.86 WD →
Madera CA building $36.56 $27.30 $63.86 WD →
Madera CA highway $36.56 $27.30 $63.86 WD →
Mariposa CA heavy $37.56 $27.30 $64.86 WD →
Mariposa CA building $36.56 $27.30 $63.86 WD →
Mariposa CA building $37.56 $27.30 $64.86 WD →
Mariposa CA highway $37.56 $27.30 $64.86 WD →
Mariposa CA highway $36.56 $27.30 $63.86 WD →
Mariposa CA heavy $36.56 $27.30 $63.86 WD →
Merced CA building $36.56 $27.30 $63.86 WD →
Merced CA highway $37.56 $27.30 $64.86 WD →
Merced CA heavy $36.56 $27.30 $63.86 WD →
Merced CA heavy $37.56 $27.30 $64.86 WD →
Merced CA highway $36.56 $27.30 $63.86 WD →
Merced CA building $37.56 $27.30 $64.86 WD →
Monterey CA highway $37.56 $27.30 $64.86 WD →
Monterey CA building $36.56 $27.30 $63.86 WD →
Monterey CA building $37.56 $27.30 $64.86 WD →
Monterey CA heavy $36.56 $27.30 $63.86 WD →
Monterey CA heavy $37.56 $27.30 $64.86 WD →
Monterey CA highway $36.56 $27.30 $63.86 WD →
San Benito CA heavy $37.56 $27.30 $64.86 WD →
San Benito CA building $37.56 $27.30 $64.86 WD →
San Benito CA highway $37.56 $27.30 $64.86 WD →
San Benito CA highway $36.56 $27.30 $63.86 WD →
San Benito CA building $36.56 $27.30 $63.86 WD →
San Benito CA heavy $36.56 $27.30 $63.86 WD →
San Francisco CA highway $36.56 $27.30 $63.86 WD →
San Francisco CA building $36.56 $27.30 $63.86 WD →
San Francisco CA building $37.56 $27.30 $64.86 WD →
San Francisco CA highway $37.56 $27.30 $64.86 WD →
San Francisco CA heavy $37.56 $27.30 $64.86 WD →
San Francisco CA heavy $36.56 $27.30 $63.86 WD →
San Joaquin CA heavy $36.56 $27.30 $63.86 WD →
San Joaquin CA heavy $37.56 $27.30 $64.86 WD →
San Joaquin CA building $37.56 $27.30 $64.86 WD →
San Joaquin CA building $36.56 $27.30 $63.86 WD →
San Joaquin CA highway $36.56 $27.30 $63.86 WD →
San Joaquin CA highway $37.56 $27.30 $64.86 WD →
San Mateo CA heavy $37.56 $27.30 $64.86 WD →
San Mateo CA highway $37.56 $27.30 $64.86 WD →
San Mateo CA highway $36.56 $27.30 $63.86 WD →
San Mateo CA heavy $36.56 $27.30 $63.86 WD →
San Mateo CA building $36.56 $27.30 $63.86 WD →
San Mateo CA building $37.56 $27.30 $64.86 WD →
Santa Clara CA highway $37.56 $27.30 $64.86 WD →
Santa Clara CA heavy $37.56 $27.30 $64.86 WD →
Santa Clara CA building $37.56 $27.30 $64.86 WD →
Santa Clara CA building $36.56 $27.30 $63.86 WD →
Santa Clara CA heavy $36.56 $27.30 $63.86 WD →
Santa Clara CA highway $36.56 $27.30 $63.86 WD →
Santa Cruz CA highway $36.56 $27.30 $63.86 WD →
Santa Cruz CA building $37.56 $27.30 $64.86 WD →
Santa Cruz CA heavy $37.56 $27.30 $64.86 WD →
Santa Cruz CA highway $37.56 $27.30 $64.86 WD →
Santa Cruz CA building $36.56 $27.30 $63.86 WD →
Santa Cruz CA heavy $36.56 $27.30 $63.86 WD →
Stanislaus CA building $37.56 $27.30 $64.86 WD →
Stanislaus CA heavy $37.56 $27.30 $64.86 WD →
Stanislaus CA heavy $36.56 $27.30 $63.86 WD →
Stanislaus CA highway $36.56 $27.30 $63.86 WD →
Stanislaus CA highway $37.56 $27.30 $64.86 WD →
Stanislaus CA building $36.56 $27.30 $63.86 WD →
Tuolumne CA building $37.56 $27.30 $64.86 WD →
Tuolumne CA building $36.56 $27.30 $63.86 WD →
Tuolumne CA heavy $37.56 $27.30 $64.86 WD →
Tuolumne CA heavy $36.56 $27.30 $63.86 WD →
Top-paying counties for LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE →