BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANER; MATERIAL CLEANER. THE CLASSIFICATION ""MATERIAL CL — Prevailing Wage Rates

Davis-Bacon prevailing wages for BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANER; MATERIAL CLEANER. THE CLASSIFICATION ""MATERIAL CLs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 246 Davis-Bacon rate records nationwide, the median total package (base + fringe) for BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANER; MATERIAL CLEANER. THE CLASSIFICATION ""MATERIAL CL is $56.74/hr, with the middle 80% of counties paying between $56.24 and $57.24/hr. The highest state average is California at $56.74/hr; the lowest is California at $56.74/hr.

Bottom 10%
$56.24
Median
$56.74
Average
$56.74
Top 10%
$57.24

Range: $56.24 – $57.24/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

California CA
Avg base: $29.44/hr
Avg total: $56.74/hr
246 rates

All Rates

246 county-level rates for BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANER; MATERIAL CLEANER. THE CLASSIFICATION ""MATERIAL CL, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Alameda CA heavy $28.94 $27.30 $56.24 WD →
Alameda CA heavy $29.94 $27.30 $57.24 WD →
Alameda CA highway $29.94 $27.30 $57.24 WD →
Alameda CA building $28.94 $27.30 $56.24 WD →
Alameda CA highway $28.94 $27.30 $56.24 WD →
Alameda CA building $29.94 $27.30 $57.24 WD →
Alpine CA highway $29.94 $27.30 $57.24 WD →
Alpine CA building $28.94 $27.30 $56.24 WD →
Alpine CA highway $28.94 $27.30 $56.24 WD →
Alpine CA heavy $29.94 $27.30 $57.24 WD →
Alpine CA heavy $28.94 $27.30 $56.24 WD →
Alpine CA building $29.94 $27.30 $57.24 WD →
Amador CA heavy $28.94 $27.30 $56.24 WD →
Amador CA building $28.94 $27.30 $56.24 WD →
Amador CA heavy $29.94 $27.30 $57.24 WD →
Amador CA highway $29.94 $27.30 $57.24 WD →
Amador CA highway $28.94 $27.30 $56.24 WD →
Amador CA building $29.94 $27.30 $57.24 WD →
Butte CA building $28.94 $27.30 $56.24 WD →
Butte CA highway $28.94 $27.30 $56.24 WD →
Butte CA heavy $29.94 $27.30 $57.24 WD →
Butte CA building $29.94 $27.30 $57.24 WD →
Butte CA highway $29.94 $27.30 $57.24 WD →
Butte CA heavy $28.94 $27.30 $56.24 WD →
Calaveras CA heavy $29.94 $27.30 $57.24 WD →
Calaveras CA building $29.94 $27.30 $57.24 WD →
Calaveras CA heavy $28.94 $27.30 $56.24 WD →
Calaveras CA highway $29.94 $27.30 $57.24 WD →
Calaveras CA highway $28.94 $27.30 $56.24 WD →
Calaveras CA building $28.94 $27.30 $56.24 WD →
Colusa CA building $28.94 $27.30 $56.24 WD →
Colusa CA heavy $29.94 $27.30 $57.24 WD →
Colusa CA highway $28.94 $27.30 $56.24 WD →
Colusa CA highway $29.94 $27.30 $57.24 WD →
Colusa CA building $29.94 $27.30 $57.24 WD →
Colusa CA heavy $28.94 $27.30 $56.24 WD →
Contra Costa CA building $29.94 $27.30 $57.24 WD →
Contra Costa CA heavy $28.94 $27.30 $56.24 WD →
Contra Costa CA heavy $29.94 $27.30 $57.24 WD →
Contra Costa CA highway $28.94 $27.30 $56.24 WD →
Contra Costa CA highway $29.94 $27.30 $57.24 WD →
Contra Costa CA building $28.94 $27.30 $56.24 WD →
El Dorado CA building $29.94 $27.30 $57.24 WD →
El Dorado CA highway $28.94 $27.30 $56.24 WD →
El Dorado CA heavy $28.94 $27.30 $56.24 WD →
El Dorado CA highway $29.94 $27.30 $57.24 WD →
El Dorado CA heavy $29.94 $27.30 $57.24 WD →
El Dorado CA building $28.94 $27.30 $56.24 WD →
Fresno CA highway $29.94 $27.30 $57.24 WD →
Fresno CA building $29.94 $27.30 $57.24 WD →
Fresno CA heavy $28.94 $27.30 $56.24 WD →
Fresno CA heavy $29.94 $27.30 $57.24 WD →
Fresno CA highway $28.94 $27.30 $56.24 WD →
Fresno CA building $28.94 $27.30 $56.24 WD →
Glenn CA building $28.94 $27.30 $56.24 WD →
Glenn CA building $29.94 $27.30 $57.24 WD →
Glenn CA highway $29.94 $27.30 $57.24 WD →
Glenn CA highway $28.94 $27.30 $56.24 WD →
Glenn CA heavy $29.94 $27.30 $57.24 WD →
Glenn CA heavy $28.94 $27.30 $56.24 WD →
Kings CA building $28.94 $27.30 $56.24 WD →
Kings CA heavy $28.94 $27.30 $56.24 WD →
Kings CA heavy $29.94 $27.30 $57.24 WD →
Kings CA building $29.94 $27.30 $57.24 WD →
Kings CA highway $29.94 $27.30 $57.24 WD →
Kings CA highway $28.94 $27.30 $56.24 WD →
Lassen CA heavy $29.94 $27.30 $57.24 WD →
Lassen CA highway $28.94 $27.30 $56.24 WD →
Lassen CA heavy $28.94 $27.30 $56.24 WD →
Lassen CA building $29.94 $27.30 $57.24 WD →
Lassen CA highway $29.94 $27.30 $57.24 WD →
Lassen CA building $28.94 $27.30 $56.24 WD →
Madera CA building $28.94 $27.30 $56.24 WD →
Madera CA heavy $28.94 $27.30 $56.24 WD →
Madera CA building $29.94 $27.30 $57.24 WD →
Madera CA highway $28.94 $27.30 $56.24 WD →
Madera CA highway $29.94 $27.30 $57.24 WD →
Madera CA heavy $29.94 $27.30 $57.24 WD →
Marin CA heavy $28.94 $27.30 $56.24 WD →
Marin CA building $29.94 $27.30 $57.24 WD →
Marin CA highway $28.94 $27.30 $56.24 WD →
Marin CA heavy $29.94 $27.30 $57.24 WD →
Marin CA highway $29.94 $27.30 $57.24 WD →
Marin CA building $28.94 $27.30 $56.24 WD →
Mariposa CA building $28.94 $27.30 $56.24 WD →
Mariposa CA building $29.94 $27.30 $57.24 WD →
Mariposa CA heavy $28.94 $27.30 $56.24 WD →
Mariposa CA heavy $29.94 $27.30 $57.24 WD →
Mariposa CA highway $28.94 $27.30 $56.24 WD →
Mariposa CA highway $29.94 $27.30 $57.24 WD →
Merced CA building $29.94 $27.30 $57.24 WD →
Merced CA heavy $28.94 $27.30 $56.24 WD →
Merced CA heavy $29.94 $27.30 $57.24 WD →
Merced CA highway $28.94 $27.30 $56.24 WD →
Merced CA highway $29.94 $27.30 $57.24 WD →
Merced CA building $28.94 $27.30 $56.24 WD →
Modoc CA building $28.94 $27.30 $56.24 WD →
Modoc CA heavy $28.94 $27.30 $56.24 WD →
Modoc CA building $29.94 $27.30 $57.24 WD →
Modoc CA heavy $29.94 $27.30 $57.24 WD →
Top-paying counties for BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANER; MATERIAL CLEANER. THE CLASSIFICATION ""MATERIAL CL →