COMMUNICATIONS SYSTEM: TECHNICIAN SCOPE OF WORK INCLUDES THE INSTALLATION TESTING, SERVICE AND MAINTENANCE, OF THE FOLLOWING SYSTEMS WHICH UTILIZE THE — Prevailing Wage Rates
Davis-Bacon prevailing wages for COMMUNICATIONS SYSTEM: TECHNICIAN SCOPE OF WORK INCLUDES THE INSTALLATION TESTING, SERVICE AND MAINTENANCE, OF THE FOLLOWING SYSTEMS WHICH UTILIZE THEs across all covered states and counties. Rates vary by location and construction type.
Across 51 Davis-Bacon rate records nationwide, the median total package (base + fringe) for COMMUNICATIONS SYSTEM: TECHNICIAN SCOPE OF WORK INCLUDES THE INSTALLATION TESTING, SERVICE AND MAINTENANCE, OF THE FOLLOWING SYSTEMS WHICH UTILIZE THE is $80.28/hr, with the middle 80% of counties paying between $80.28 and $80.28/hr. The highest state average is California at $80.28/hr; the lowest is California at $80.28/hr.
Range: $80.28 – $80.28/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
51 county-level rates for COMMUNICATIONS SYSTEM: TECHNICIAN SCOPE OF WORK INCLUDES THE INSTALLATION TESTING, SERVICE AND MAINTENANCE, OF THE FOLLOWING SYSTEMS WHICH UTILIZE THE, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Alameda | CA | highway | $52.07 | $28.21 | $80.28 | WD → |
| Alameda | CA | building | $52.07 | $28.21 | $80.28 | WD → |
| Alameda | CA | heavy | $52.07 | $28.21 | $80.28 | WD → |
| Calaveras | CA | building | $52.07 | $28.21 | $80.28 | WD → |
| Calaveras | CA | heavy | $52.07 | $28.21 | $80.28 | WD → |
| Calaveras | CA | highway | $52.07 | $28.21 | $80.28 | WD → |
| Contra Costa | CA | highway | $52.07 | $28.21 | $80.28 | WD → |
| Contra Costa | CA | building | $52.07 | $28.21 | $80.28 | WD → |
| Contra Costa | CA | heavy | $52.07 | $28.21 | $80.28 | WD → |
| Fresno | CA | building | $52.07 | $28.21 | $80.28 | WD → |
| Fresno | CA | highway | $52.07 | $28.21 | $80.28 | WD → |
| Fresno | CA | heavy | $52.07 | $28.21 | $80.28 | WD → |
| Kings | CA | heavy | $52.07 | $28.21 | $80.28 | WD → |
| Kings | CA | building | $52.07 | $28.21 | $80.28 | WD → |
| Kings | CA | highway | $52.07 | $28.21 | $80.28 | WD → |
| Madera | CA | building | $52.07 | $28.21 | $80.28 | WD → |
| Madera | CA | highway | $52.07 | $28.21 | $80.28 | WD → |
| Madera | CA | heavy | $52.07 | $28.21 | $80.28 | WD → |
| Mariposa | CA | highway | $52.07 | $28.21 | $80.28 | WD → |
| Mariposa | CA | heavy | $52.07 | $28.21 | $80.28 | WD → |
| Mariposa | CA | building | $52.07 | $28.21 | $80.28 | WD → |
| Merced | CA | building | $52.07 | $28.21 | $80.28 | WD → |
| Merced | CA | highway | $52.07 | $28.21 | $80.28 | WD → |
| Merced | CA | heavy | $52.07 | $28.21 | $80.28 | WD → |
| Monterey | CA | highway | $52.07 | $28.21 | $80.28 | WD → |
| Monterey | CA | building | $52.07 | $28.21 | $80.28 | WD → |
| Monterey | CA | heavy | $52.07 | $28.21 | $80.28 | WD → |
| San Benito | CA | building | $52.07 | $28.21 | $80.28 | WD → |
| San Benito | CA | heavy | $52.07 | $28.21 | $80.28 | WD → |
| San Benito | CA | highway | $52.07 | $28.21 | $80.28 | WD → |
| San Francisco | CA | heavy | $52.07 | $28.21 | $80.28 | WD → |
| San Francisco | CA | building | $52.07 | $28.21 | $80.28 | WD → |
| San Francisco | CA | highway | $52.07 | $28.21 | $80.28 | WD → |
| San Joaquin | CA | building | $52.07 | $28.21 | $80.28 | WD → |
| San Joaquin | CA | heavy | $52.07 | $28.21 | $80.28 | WD → |
| San Joaquin | CA | highway | $52.07 | $28.21 | $80.28 | WD → |
| San Mateo | CA | heavy | $52.07 | $28.21 | $80.28 | WD → |
| San Mateo | CA | building | $52.07 | $28.21 | $80.28 | WD → |
| San Mateo | CA | highway | $52.07 | $28.21 | $80.28 | WD → |
| Santa Clara | CA | heavy | $52.07 | $28.21 | $80.28 | WD → |
| Santa Clara | CA | highway | $52.07 | $28.21 | $80.28 | WD → |
| Santa Clara | CA | building | $52.07 | $28.21 | $80.28 | WD → |
| Santa Cruz | CA | building | $52.07 | $28.21 | $80.28 | WD → |
| Santa Cruz | CA | heavy | $52.07 | $28.21 | $80.28 | WD → |
| Santa Cruz | CA | highway | $52.07 | $28.21 | $80.28 | WD → |
| Stanislaus | CA | highway | $52.07 | $28.21 | $80.28 | WD → |
| Stanislaus | CA | building | $52.07 | $28.21 | $80.28 | WD → |
| Stanislaus | CA | heavy | $52.07 | $28.21 | $80.28 | WD → |
| Tuolumne | CA | building | $52.07 | $28.21 | $80.28 | WD → |
| Tuolumne | CA | highway | $52.07 | $28.21 | $80.28 | WD → |
| Tuolumne | CA | heavy | $52.07 | $28.21 | $80.28 | WD → |