OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 3 — Prevailing Wage Rates

Davis-Bacon prevailing wages for OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 3s across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 127 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 3 is $98.09/hr, with the middle 80% of counties paying between $98.09 and $98.09/hr. The highest state average is California at $98.01/hr; the lowest is California at $98.01/hr.

Bottom 10%
$98.09
Median
$98.09
Average
$98.01
Top 10%
$98.09

Range: $93.14 – $98.09/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

California CA
Avg base: $65.48/hr
Avg total: $98.01/hr
127 rates

All Rates

127 county-level rates for OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 3, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Alameda CA highway $65.56 $32.53 $98.09 WD →
Alameda CA heavy $65.56 $32.53 $98.09 WD →
Alameda CA building $65.56 $32.53 $98.09 WD →
Alpine CA heavy $65.56 $32.53 $98.09 WD →
Alpine CA building $65.56 $32.53 $98.09 WD →
Alpine CA highway $65.56 $32.53 $98.09 WD →
Amador CA heavy $65.56 $32.53 $98.09 WD →
Amador CA building $65.56 $32.53 $98.09 WD →
Amador CA highway $65.56 $32.53 $98.09 WD →
Butte CA heavy $65.56 $32.53 $98.09 WD →
Butte CA highway $65.56 $32.53 $98.09 WD →
Butte CA building $65.56 $32.53 $98.09 WD →
Calaveras CA building $65.56 $32.53 $98.09 WD →
Calaveras CA heavy $65.56 $32.53 $98.09 WD →
Calaveras CA highway $65.56 $32.53 $98.09 WD →
Colusa CA building $65.56 $32.53 $98.09 WD →
Colusa CA highway $65.56 $32.53 $98.09 WD →
Colusa CA heavy $65.56 $32.53 $98.09 WD →
Contra Costa CA building $65.56 $32.53 $98.09 WD →
Contra Costa CA heavy $65.56 $32.53 $98.09 WD →
Contra Costa CA highway $65.56 $32.53 $98.09 WD →
El Dorado CA heavy $65.56 $32.53 $98.09 WD →
El Dorado CA highway $65.56 $32.53 $98.09 WD →
El Dorado CA building $65.56 $32.53 $98.09 WD →
Fresno CA building $65.56 $32.53 $98.09 WD →
Fresno CA highway $65.56 $32.53 $98.09 WD →
Fresno CA heavy $65.56 $32.53 $98.09 WD →
Glenn CA highway $65.56 $32.53 $98.09 WD →
Glenn CA heavy $65.56 $32.53 $98.09 WD →
Glenn CA building $65.56 $32.53 $98.09 WD →
Kings CA heavy $65.56 $32.53 $98.09 WD →
Kings CA highway $65.56 $32.53 $98.09 WD →
Kings CA building $65.56 $32.53 $98.09 WD →
Lassen CA building $65.56 $32.53 $98.09 WD →
Lassen CA highway $65.56 $32.53 $98.09 WD →
Lassen CA heavy $65.56 $32.53 $98.09 WD →
Madera CA heavy $65.56 $32.53 $98.09 WD →
Madera CA highway $65.56 $32.53 $98.09 WD →
Madera CA building $65.56 $32.53 $98.09 WD →
Marin CA highway $65.56 $32.53 $98.09 WD →
Marin CA building $65.56 $32.53 $98.09 WD →
Marin CA heavy $65.56 $32.53 $98.09 WD →
Mariposa CA building $65.56 $32.53 $98.09 WD →
Mariposa CA highway $65.56 $32.53 $98.09 WD →
Mariposa CA heavy $65.56 $32.53 $98.09 WD →
Merced CA highway $65.56 $32.53 $98.09 WD →
Merced CA building $65.56 $32.53 $98.09 WD →
Merced CA heavy $65.56 $32.53 $98.09 WD →
Modoc CA building $65.56 $32.53 $98.09 WD →
Modoc CA highway $65.56 $32.53 $98.09 WD →
Modoc CA heavy $65.56 $32.53 $98.09 WD →
Monterey CA highway $65.56 $32.53 $98.09 WD →
Monterey CA building $65.56 $32.53 $98.09 WD →
Monterey CA heavy $65.56 $32.53 $98.09 WD →
Napa CA building $65.56 $32.53 $98.09 WD →
Napa CA heavy $65.56 $32.53 $98.09 WD →
Napa CA highway $65.56 $32.53 $98.09 WD →
Nevada CA highway $65.56 $32.53 $98.09 WD →
Nevada CA building $65.56 $32.53 $98.09 WD →
Nevada CA heavy $65.56 $32.53 $98.09 WD →
Placer CA heavy $65.56 $32.53 $98.09 WD →
Placer CA highway $65.56 $32.53 $98.09 WD →
Placer CA building $65.56 $32.53 $98.09 WD →
Plumas CA building $65.56 $32.53 $98.09 WD →
Plumas CA highway $65.56 $32.53 $98.09 WD →
Plumas CA heavy $65.56 $32.53 $98.09 WD →
Sacramento CA heavy $65.56 $32.53 $98.09 WD →
Sacramento CA building $65.56 $32.53 $98.09 WD →
Sacramento CA highway $65.56 $32.53 $98.09 WD →
San Benito CA highway $65.56 $32.53 $98.09 WD →
San Benito CA building $65.56 $32.53 $98.09 WD →
San Benito CA heavy $65.56 $32.53 $98.09 WD →
San Francisco CA building $65.56 $32.53 $98.09 WD →
San Francisco CA heavy $65.56 $32.53 $98.09 WD →
San Francisco CA highway $65.56 $32.53 $98.09 WD →
San Joaquin CA highway $65.56 $32.53 $98.09 WD →
San Joaquin CA heavy $65.56 $32.53 $98.09 WD →
San Joaquin CA building $65.56 $32.53 $98.09 WD →
San Mateo CA highway $65.56 $32.53 $98.09 WD →
San Mateo CA building $65.56 $32.53 $98.09 WD →
San Mateo CA heavy $65.56 $32.53 $98.09 WD →
Santa Clara CA heavy $65.56 $32.53 $98.09 WD →
Santa Clara CA highway $65.56 $32.53 $98.09 WD →
Santa Clara CA building $65.56 $32.53 $98.09 WD →
Santa Cruz CA heavy $65.56 $32.53 $98.09 WD →
Santa Cruz CA highway $65.56 $32.53 $98.09 WD →
Santa Cruz CA building $65.56 $32.53 $98.09 WD →
Shasta CA building $65.56 $32.53 $98.09 WD →
Shasta CA heavy $65.56 $32.53 $98.09 WD →
Shasta CA highway $65.56 $32.53 $98.09 WD →
Sierra CA building $65.56 $32.53 $98.09 WD →
Sierra CA heavy $65.56 $32.53 $98.09 WD →
Sierra CA highway $65.56 $32.53 $98.09 WD →
Siskiyou CA building $65.56 $32.53 $98.09 WD →
Siskiyou CA heavy $65.56 $32.53 $98.09 WD →
Siskiyou CA highway $65.56 $32.53 $98.09 WD →
Solano CA heavy $65.56 $32.53 $98.09 WD →
Solano CA building $65.56 $32.53 $98.09 WD →
Solano CA highway $65.56 $32.53 $98.09 WD →
Sonoma CA highway $65.56 $32.53 $98.09 WD →
Top-paying counties for OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 3 →