OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES:.$ 65.53 32.53 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGRO — Prevailing Wage Rates

Davis-Bacon prevailing wages for OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES:.$ 65.53 32.53 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 125 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES:.$ 65.53 32.53 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGRO is $95.59/hr, with the middle 80% of counties paying between $95.59 and $95.59/hr. The highest state average is California at $95.59/hr; the lowest is California at $95.59/hr.

Bottom 10%
$95.59
Median
$95.59
Average
$95.59
Top 10%
$95.59

Range: $95.59 – $95.59/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

California CA
Avg base: $63.06/hr
Avg total: $95.59/hr
125 rates

All Rates

125 county-level rates for OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES:.$ 65.53 32.53 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGRO, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Alameda CA highway $63.06 $32.53 $95.59 WD →
Alameda CA heavy $63.06 $32.53 $95.59 WD →
Alameda CA building $63.06 $32.53 $95.59 WD →
Alpine CA building $63.06 $32.53 $95.59 WD →
Alpine CA highway $63.06 $32.53 $95.59 WD →
Alpine CA heavy $63.06 $32.53 $95.59 WD →
Amador CA highway $63.06 $32.53 $95.59 WD →
Amador CA building $63.06 $32.53 $95.59 WD →
Amador CA heavy $63.06 $32.53 $95.59 WD →
Butte CA heavy $63.06 $32.53 $95.59 WD →
Butte CA highway $63.06 $32.53 $95.59 WD →
Butte CA building $63.06 $32.53 $95.59 WD →
Calaveras CA heavy $63.06 $32.53 $95.59 WD →
Calaveras CA building $63.06 $32.53 $95.59 WD →
Calaveras CA highway $63.06 $32.53 $95.59 WD →
Colusa CA building $63.06 $32.53 $95.59 WD →
Colusa CA highway $63.06 $32.53 $95.59 WD →
Colusa CA heavy $63.06 $32.53 $95.59 WD →
Contra Costa CA heavy $63.06 $32.53 $95.59 WD →
Contra Costa CA highway $63.06 $32.53 $95.59 WD →
Contra Costa CA building $63.06 $32.53 $95.59 WD →
El Dorado CA heavy $63.06 $32.53 $95.59 WD →
El Dorado CA highway $63.06 $32.53 $95.59 WD →
El Dorado CA building $63.06 $32.53 $95.59 WD →
Fresno CA highway $63.06 $32.53 $95.59 WD →
Fresno CA heavy $63.06 $32.53 $95.59 WD →
Fresno CA building $63.06 $32.53 $95.59 WD →
Glenn CA highway $63.06 $32.53 $95.59 WD →
Glenn CA building $63.06 $32.53 $95.59 WD →
Glenn CA heavy $63.06 $32.53 $95.59 WD →
Kings CA building $63.06 $32.53 $95.59 WD →
Kings CA heavy $63.06 $32.53 $95.59 WD →
Kings CA highway $63.06 $32.53 $95.59 WD →
Lassen CA highway $63.06 $32.53 $95.59 WD →
Lassen CA heavy $63.06 $32.53 $95.59 WD →
Lassen CA building $63.06 $32.53 $95.59 WD →
Madera CA heavy $63.06 $32.53 $95.59 WD →
Madera CA building $63.06 $32.53 $95.59 WD →
Madera CA highway $63.06 $32.53 $95.59 WD →
Marin CA building $63.06 $32.53 $95.59 WD →
Marin CA heavy $63.06 $32.53 $95.59 WD →
Marin CA highway $63.06 $32.53 $95.59 WD →
Mariposa CA highway $63.06 $32.53 $95.59 WD →
Mariposa CA building $63.06 $32.53 $95.59 WD →
Mariposa CA heavy $63.06 $32.53 $95.59 WD →
Merced CA building $63.06 $32.53 $95.59 WD →
Merced CA highway $63.06 $32.53 $95.59 WD →
Merced CA heavy $63.06 $32.53 $95.59 WD →
Modoc CA highway $63.06 $32.53 $95.59 WD →
Modoc CA heavy $63.06 $32.53 $95.59 WD →
Modoc CA building $63.06 $32.53 $95.59 WD →
Monterey CA building $63.06 $32.53 $95.59 WD →
Monterey CA heavy $63.06 $32.53 $95.59 WD →
Monterey CA highway $63.06 $32.53 $95.59 WD →
Napa CA heavy $63.06 $32.53 $95.59 WD →
Napa CA building $63.06 $32.53 $95.59 WD →
Napa CA highway $63.06 $32.53 $95.59 WD →
Nevada CA highway $63.06 $32.53 $95.59 WD →
Nevada CA building $63.06 $32.53 $95.59 WD →
Nevada CA heavy $63.06 $32.53 $95.59 WD →
Placer CA building $63.06 $32.53 $95.59 WD →
Placer CA heavy $63.06 $32.53 $95.59 WD →
Placer CA highway $63.06 $32.53 $95.59 WD →
Plumas CA building $63.06 $32.53 $95.59 WD →
Plumas CA highway $63.06 $32.53 $95.59 WD →
Plumas CA heavy $63.06 $32.53 $95.59 WD →
Sacramento CA highway $63.06 $32.53 $95.59 WD →
Sacramento CA building $63.06 $32.53 $95.59 WD →
Sacramento CA heavy $63.06 $32.53 $95.59 WD →
San Benito CA heavy $63.06 $32.53 $95.59 WD →
San Benito CA building $63.06 $32.53 $95.59 WD →
San Benito CA highway $63.06 $32.53 $95.59 WD →
San Francisco CA building $63.06 $32.53 $95.59 WD →
San Francisco CA heavy $63.06 $32.53 $95.59 WD →
San Francisco CA highway $63.06 $32.53 $95.59 WD →
San Joaquin CA heavy $63.06 $32.53 $95.59 WD →
San Joaquin CA building $63.06 $32.53 $95.59 WD →
San Joaquin CA highway $63.06 $32.53 $95.59 WD →
San Mateo CA heavy $63.06 $32.53 $95.59 WD →
San Mateo CA highway $63.06 $32.53 $95.59 WD →
San Mateo CA building $63.06 $32.53 $95.59 WD →
Santa Clara CA heavy $63.06 $32.53 $95.59 WD →
Santa Clara CA highway $63.06 $32.53 $95.59 WD →
Santa Clara CA building $63.06 $32.53 $95.59 WD →
Santa Cruz CA highway $63.06 $32.53 $95.59 WD →
Santa Cruz CA building $63.06 $32.53 $95.59 WD →
Santa Cruz CA heavy $63.06 $32.53 $95.59 WD →
Shasta CA building $63.06 $32.53 $95.59 WD →
Shasta CA highway $63.06 $32.53 $95.59 WD →
Shasta CA heavy $63.06 $32.53 $95.59 WD →
Sierra CA heavy $63.06 $32.53 $95.59 WD →
Sierra CA building $63.06 $32.53 $95.59 WD →
Sierra CA highway $63.06 $32.53 $95.59 WD →
Siskiyou CA building $63.06 $32.53 $95.59 WD →
Siskiyou CA heavy $63.06 $32.53 $95.59 WD →
Siskiyou CA highway $63.06 $32.53 $95.59 WD →
Solano CA building $63.06 $32.53 $95.59 WD →
Solano CA highway $63.06 $32.53 $95.59 WD →
Solano CA heavy $63.06 $32.53 $95.59 WD →
Sonoma CA building $63.06 $32.53 $95.59 WD →
Top-paying counties for OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES:.$ 65.53 32.53 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGRO →