|
ABOVE THE 75'-0"" LEVEL SHALL BE COMPENSATED FOR AT 35 CENTS PER HOUR ABOVE THE APPLICABLE CLASSIFICATION WAGE RATE
|
$55.88 |
$23.77 |
$79.65 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ASBESTOS REMOVAL LABORER SCOPE OF WORK: INCLUDES SITE MOBILIZATION, INITIAL SITE CLEANUP, SITE PREPARATION, REMOVAL OF ASBESTOS-CONTAINING MATERIAL AN
|
$46.48 |
$25.93 |
$72.41 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER
|
$23.52 |
$13.37 |
$36.89 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ASBESTOS WORKERS/INSULATOR
|
$56.32 |
$26.52 |
$82.84 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BOILERMAKER
|
$51.98 |
$42.11 |
$94.09 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BRICKLAYER; MARBLE SETTER
|
$46.73 |
$19.02 |
$65.75 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER: BRIDGE
|
$52.37 |
$26.18 |
$78.55 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER: COMMERCIAL BUILDING
|
$48.94 |
$26.18 |
$75.12 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER: HEAVY & HIGHWAY
|
$51.40 |
$16.28 |
$67.68 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER: RESIDENTIAL CARPENTER
|
$39.15 |
$26.18 |
$65.33 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER: RESIDENTIAL INSULATION INSTALLER
|
$24.16 |
$15.76 |
$39.92 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CEMENT MASON/CONCRETE FINISHER GROUP 1: Residential wood frame project of any size; work classified as Type III, IV or Type V construction; interior t
|
$26.34 |
$19.77 |
$46.11 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CEMENT MASON/CONCRETE FINISHER GROUP 2: Work classified as type I and II construction
|
$27.99 |
$19.77 |
$47.76 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CEMENT MASON/CONCRETE FINISHER GROUP 3: ALL OTHER WORK
|
$30.07 |
$21.12 |
$51.19 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CENTS PER HOUR ABOVE THE APPLICABLE CLASSIFICATION WAGE RATE
|
$51.39 |
$23.77 |
$75.16 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CENTS PER HOUR ABOVE THE APPLICABLE CLASSIFICATION WAGE RATE
|
$54.93 |
$23.77 |
$78.70 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR. OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 25- CONCRETE PUMP OPERATOR-TRUCK MOUNTED; RUBBER-TIRE
|
$67.91 |
$33.20 |
$101.11 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DIVER (ASSISTANT TENDER)
|
$52.37 |
$3.27 |
$55.64 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DIVER (STANDBY)
|
$56.37 |
$3.27 |
$59.64 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DIVER (TENDER)
|
$55.37 |
$3.27 |
$58.64 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DIVER (WET)
|
$112.74 |
$3.27 |
$116.01 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DRYWALL FINISHER/TAPER BUILDING & HEAVY CONSTRUCTION
|
$43.59 |
$24.80 |
$68.39 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DRYWALL FINISHER/TAPER Residential Construction
|
$32.27 |
$14.70 |
$46.97 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DRYWALL: DRYWALL INSTALLER/LATHER ( WORK ON WOOD FRAMED CONSTRUCTION OF SINGLE FAMILY RESIDENCES, APARTMENTS OR CONDOMINIUMS UNDER FOUR STORIES)
|
$32.14 |
$16.28 |
$48.42 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DRYWALL: DRYWALL INSTALLER/LATHER ALL OTHER WORK
|
$44.53 |
$27.09 |
$71.62 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DRYWALL: DRYWALL STOCKER/SCRAPPER ( WORK ON WOOD FRAMED CONSTRUCTION OF SINGLE FAMILY RESIDENCES, APARTMENTS OR CONDOMINIUMS UNDER FOUR STORIES)
|
$22.16 |
$8.62 |
$30.78 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DRYWALL: DRYWALL STOCKER/SCRAPPER ALL OTHER WORK
|
$21.45 |
$12.18 |
$33.63 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN
|
$58.95 |
$18.85 |
$77.80 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN
|
$66.32 |
$19.07 |
$85.39 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN
|
$40.50 |
$8.18 |
$48.68 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN: CABLE SPLICER
|
$67.16 |
$19.09 |
$86.25 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN: CABLE SPLICER
|
$59.70 |
$18.87 |
$78.57 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN: SOUND & COMMUNICATIONS SOUND TECHNICIAN SCOPE OF WORK: ASSEMBLY, INSTALLATION, OPERATION, SERVICE AND MAINTENANCE OF COMPONENTS OR SYSTEM
|
$43.78 |
$15.39 |
$59.17 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELEVATOR MECHANIC FOOTNOTE: A. PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEA
|
$69.43 |
$38.44 |
$107.87 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
EQUIPMENT OPERATOR, TOWER CRANE REPAIRMAN; TRACTOR LOADER OPERATOR; WOODS MIXER OPERATOR PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIP
|
$66.41 |
$33.20 |
$99.61 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
FIRE STOP TECHNICIAN
|
$39.94 |
$20.65 |
$60.59 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
GLAZIER
|
$52.90 |
$22.16 |
$75.06 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEEL
|
$67.18 |
$33.20 |
$100.38 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER (FENCE PREMIUM PAY: $6.00 additional per hour at the following locations:China Lake Naval Test Station, Chocolate Mountains Naval Reserve-N
|
$45.78 |
$26.51 |
$72.29 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER (ORNAMENTAL, REINFORCING AND PREMIUM PAY: $6.00 additional per hour at the following locations:China Lake Naval Test Station, Chocolate Mou
|
$50.70 |
$35.15 |
$85.85 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER LABORER RESIDENTIAL DEFINITION: WOOD OR METAL FRAME CONSTRUCTION OF SINGLE FAMILY RESIDENCES, APARTMENTS AND CONDOMINUMS - EXCLUDING PROJECTS
|
$42.15 |
$23.42 |
$65.57 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER, BUILDING AND ALL OTHER RESIDENTIAL CONSTRUCTION: GROUP 1 CLEANING AND HANDLING OF PANEL FORMS; CONCRETE SCREEDING FOR ROUGHT STRIKE-OFF; CONC
|
$45.54 |
$25.09 |
$70.63 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER, BUILDING AND ALL OTHER RESIDENTIAL CONSTRUCTION: GROUP 3 BUGGYMOBILE; CONCRETE CUTTING TORCH; CONCRETE CUTTING TORCH; CONCRETE PILE CUTTER; D
|
$46.30 |
$25.09 |
$71.39 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER, BUILDING AND ALL OTHER RESIDENTIAL CONSTRUCTION: GROUP 4 ASPHALT RAKER, LUTERMAN, IRONER, APSHALT DUMPMAN AND ASPHALT SPREADER BOXES; CONCRET
|
$48.64 |
$25.09 |
$73.73 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER, BUILDING AND ALL OTHER RESIDENTIAL CONSTRUCTION: GROUP 5 BLASTERS POWDERMAN-ALL WORK OF LOADING HOLES, PLACING AND BLASTING OF ALL PWDER AND
|
$48.16 |
$25.09 |
$73.25 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER: CLEANUP, LANDSCAPE, FENCING RESIDENTIAL DEFINITION: WOOD OR METAL FRAME CONSTRUCTION OF SINGLE FAMILY RESIDENCES, APARTMENTS AND CONDOMINUMS
|
$43.44 |
$23.42 |
$66.86 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER: MASON TENDER
|
$42.60 |
$22.13 |
$64.73 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER: PLASTER CLEAN-UP LABORER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. WORK AT MILITARY BASES - $3.00 ADDITIONAL PER HOUR: CORON
|
$46.17 |
$25.97 |
$72.14 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER: PLASTER TENDER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. WORK AT MILITARY BASES - $3.00 ADDITIONAL PER HOUR: CORONADO NAVAL
|
$48.72 |
$25.97 |
$74.69 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: GROUP 1 LABORER: GENERAL OR CONSTRUCTION LABORER, LANDSCAPE LABORER. ASPHALT RUBBER MATERIAL LOADER. BORING MACHINE TENDER, CARPENTER LABORE
|
$46.66 |
$25.09 |
$71.75 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: GROUP 2 ASPHALT ABATEMENT; BUGGYMOBILE; CEMENT DUMPER; CONCRETE CURER, IMPERVIOUS MEMBRANE AND FORM OILER; CHUTE MAN, POURING CONCRETE; CONC
|
$47.20 |
$25.09 |
$72.29 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: GROUP 4 ANY WORKER EXPOSED TO RAW SEWAGE. ASPHALT RAKER, LUTEMAN, ASPHALT DUMPMAN, ASPHALT SPREADER BOXES, CONCRETE CORE CUTTER, CONCRETE SA
|
$49.28 |
$25.09 |
$74.37 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: GROUP 5 BLASTERS POWDERMAN-ALL WORK OF LOADING HOLES, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE, REGARDLESS OF METH
|
$50.14 |
$25.09 |
$75.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: DRILLING CREW LABORER
|
$47.94 |
$20.86 |
$68.80 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: ELECTRONIC TRACKING LOCATOR
|
$51.96 |
$20.86 |
$72.82 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: HORIZONTAL DIRECTIONAL DRILL OPERATOR
|
$49.96 |
$20.86 |
$70.82 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: VEHICLE OPERATOR/HAULER
|
$48.11 |
$20.86 |
$68.97 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: STRIPING/SLURRY SEAL: GROUP 1 PROTECTIVE COATING, PAVEMENT SEALING, INCLUDING REPAIR AND FILLING OF CRACKS BY ANY METHOD ON ANY SURFACE IN P
|
$49.30 |
$23.97 |
$73.27 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: STRIPING/SLURRY SEAL: GROUP 2 TRAFFIC SURFACE ABRASIVE BLASTER; POT TENDER - REMOVAL OF ALL TRAFFIC LINES AND MARKINGS BY ANY METHOD AND PRE
|
$50.60 |
$23.97 |
$74.57 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: STRIPING/SLURRY SEAL: GROUP 3 TRAFFIC DELINEATING DEVICE APPLICATOR: LAYOUT AND APPLICATION OF PAVEMENT MARKERS, DELINEATING SIGNS, RUMBLE A
|
$52.61 |
$23.97 |
$76.58 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: STRIPING/SLURRY SEAL: GROUP 4 STRIPER: LAYOUT AND APPLICATION OF TRAFFIC STRIPES AND MARKINGS; HOT THERMO PLASTIC; TAPE TRAFFIC STRIPES AND
|
$54.35 |
$23.97 |
$78.32 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: EQUIPMENT SPECIALIST (OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES, OVERHEAD & UNDERGROUND DIS
|
$53.30 |
$22.26 |
$75.56 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: GROUNDMAN HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DA
|
$40.76 |
$21.76 |
$62.52 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: LINEMAN; CABLE SPLICER HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVI
|
$70.16 |
$24.71 |
$94.87 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: POWDERMAN HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DA
|
$51.87 |
$18.79 |
$70.66 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
MARBLE FINISHER
|
$43.38 |
$15.36 |
$58.74 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
MILLWRIGHT
|
$52.24 |
$26.68 |
$78.92 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
MODULAR FURNITURE INSTALLER
|
$25.00 |
$13.06 |
$38.06 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 12- AUTO GRADER OPERATOR; AUTOMATIC SLIP FORM OPERATOR; DRILLING MACHINE OPERATOR, BUCKET OR AUGER TY
|
$66.58 |
$33.20 |
$99.78 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 13- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM PREMIUM PA
|
$66.68 |
$33.20 |
$99.88 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 14- CANAL LINER OPERATOR; CANAL TRIMMER OPERATOR; REMOTE- CONTROL EARTH-MOVING EQUIPMENT OPERATOR; WH
|
$66.71 |
$33.20 |
$99.91 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 15- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM; RUBBER-T
|
$66.79 |
$33.20 |
$99.99 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 16- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM; RUBBER-T
|
$66.91 |
$33.20 |
$100.11 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 17- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM; TANDEM T
|
$67.08 |
$33.20 |
$100.28 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 19- ROTEX CONCRETE BELT OPERATOR; RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM
|
$67.29 |
$33.20 |
$100.49 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 2- ASPHALT-RUBBER PLANT OPERATOR;COIL TUBING RIG OPERATOR, CONCRETE MIXER OPERATOR-SKIP TYPE; CONVEYO
|
$64.18 |
$33.20 |
$97.38 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 20- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM; RUBBER-TIRED EARTH-MOVING EQUI
|
$67.41 |
$33.20 |
$100.61 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 21- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM PREMIUM PAY: $10.00 PER HOUR SH
|
$67.58 |
$33.20 |
$100.78 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 22- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL SYSTE
|
$67.68 |
$33.20 |
$100.88 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 23- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL SYSTE
|
$67.79 |
$33.20 |
$100.99 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 3- ASPHALT-RUBBER BLEND OPERATOR; BOBCAT OR SIMILAR TYPE; EQUIPMENT GREASER; FORD FERGUSON; HELICOPTE
|
$64.67 |
$33.20 |
$97.87 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 4- ASPHALT PLANT FIREMAN; BACKHOE OPERATOR; BORING MACHINE OPERATOR; BOXMAN OR MIXERMAN; CHIP SPREADI
|
$65.96 |
$33.20 |
$99.16 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 6- ARTICULATING MATERIAL HAULER; ASPHALT PLANT ENGINEER; BATCH PLANT OPERATOR; BIT SHARPENER; CONCRET
|
$66.18 |
$33.20 |
$99.38 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 1- Engineer oiler; Fork lift operator PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON A
|
$64.75 |
$33.20 |
$97.95 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 10- Crane operator; Derrick barge operator; Hoist operator, stiff legs, Guy derrick o
|
$67.75 |
$33.20 |
$100.95 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 11- Crane operator; Derrick barge operator; Hoist operator, stiff legs, Guy derrick o
|
$68.75 |
$33.20 |
$101.95 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 12- Crane operator; Derrick barge operator; Hoist operator, stiff legs, Guy derrick o
|
$69.75 |
$33.20 |
$102.95 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 13- Crane operator; Derrick barge operator; Helicopter pilot; Hoist operator, stiff l
|
$70.75 |
$33.20 |
$103.95 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 2- Truck crane oiler PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMEN
|
$65.53 |
$33.20 |
$98.73 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 3- A-frame or winch truck operator; Ross carrier operator PREMIUM PAY: $10.00 PER HOU
|
$65.82 |
$33.20 |
$99.02 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 4- Bridge-type unloader and turntable operator; Helicopter hoist operator PREMIUM PAY
|
$65.96 |
$33.20 |
$99.16 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 5- HYDRAULIC BOOM TRUCK; STINGER CRANE; TUGGER HOIST OPERATOR PREMIUM PAY: $10.00 PER
|
$66.18 |
$33.20 |
$99.38 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 6- Bridge crane operator; Cretor crane operator; Hoist operator; Lift mobile operator
|
$66.29 |
$33.20 |
$99.49 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 7- PEDESTAL CRANE OPERATOR; SHOVEL, BACKHOE, DRAGLINE, CLAMSHELL OPERATOR; TOWER CRAN
|
$66.41 |
$33.20 |
$99.61 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 8- Crane operator; Crawler transporter operator; Derrick barge operator; Hoist operat
|
$66.58 |
$33.20 |
$99.78 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 9- Crane operator; Derrick barge operator; Highline cableway operator; Hoist operator
|
$66.75 |
$33.20 |
$99.95 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 1- Skiploader PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the fol
|
$65.25 |
$33.20 |
$98.45 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 2- Power-driven jumbo form setter operator PREMIUM PAY: $10.00 per hour shall be paid on all Power Equip
|
$66.03 |
$33.20 |
$99.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 3- Dinkey locomotive or motorperson PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Op
|
$66.32 |
$33.20 |
$99.52 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 4- Bit sharpener; Equipment greaser; Slip form pump operator; Tugger hoist operator; Tunnel locomotive o
|
$66.46 |
$33.20 |
$99.66 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 5- Backhoe operator; Small Ford, Case or similar; Drill doctor; Grouting machine operator; Heading shiel
|
$66.68 |
$33.20 |
$99.88 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 6- Heavy Duty Repairman PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work
|
$66.79 |
$33.20 |
$99.99 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 7- Tunnel mole boring machine operator PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment
|
$66.91 |
$33.20 |
$100.11 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT: BARGE MATE
|
$61.34 |
$40.95 |
$102.29 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT: DECKMATE..$ 61.82 40.95 OPERATOR: POWER EQUIPMENT: DREDGE DOZER
|
$61.93 |
$40.95 |
$102.88 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT: FIREMAN-OILER, DECKHAND, BARGEMAN, LEVEEHAND
|
$60.73 |
$40.95 |
$101.68 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT: WINCH OPERATOR
|
$61.27 |
$40.95 |
$102.22 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OR COMPRESSOR PLANT OPERATOR; PUMP OPERATOR; SIGNALMAN; SWITCHMAN PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON T
|
$63.40 |
$33.20 |
$96.60 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTERS: INCLUDING LEAD ABATEMENT: ALL OTHER WORK
|
$38.52 |
$18.64 |
$57.16 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PILEDRIVERMAN
|
$52.37 |
$26.18 |
$78.55 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLASTERER NORTH ISLAND NAVAL AIR STATION, COLORADO NAVAL AMPHIBIOUS BASE, IMPERIAL BEACH NAVAL AIR STATION: $3.00 ADDITIONAL PER HOUR
|
$47.37 |
$19.64 |
$67.01 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLUMBER
|
$48.84 |
$23.58 |
$72.42 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLUMBER
|
$44.75 |
$26.20 |
$70.95 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLUMBER, PIPEFITTER, STEAMFITTER : ALL OTHER WORK EXCEPT WORK ON NEW ADDITIONS AND REMODELING OF BARS, RESTAURANT, STORES AND COMMERCIAL BUILDINGS NOT
|
$61.73 |
$26.81 |
$88.54 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLUMBER, PIPEFITTER, STEAMFITTER: CAMP PENDLETON; VANDENBERG AIR FORCE BASE
|
$66.23 |
$26.81 |
$93.04 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLUMBER, PIPEFITTER, STEAMFITTER: WORK ONLY ON NEW ADDITIONS AND REMODELING OF COMMERCIAL BUILDINGS, BARS, RESTAURANTS, AND STORES NOT TO EXCEED 5,000
|
$59.85 |
$25.83 |
$85.68 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLUMBER, PIPEFITTER, STEAMFITTER: WORK ONLY ON STRIP MALLS, LIGHT COMMERCIAL, TENANT IMPROVEMENT AND REMODEL WORK
|
$44.29 |
$24.16 |
$68.45 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLUMBER/PIPEFITTER
|
$48.83 |
$22.73 |
$71.56 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ROOFER
|
$42.80 |
$12.64 |
$55.44 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
SETTER, TAMPER/WACKER OPERATOR AND SIMILAR TYPES, TRENCHING MACHINE HAND PROPELLED
|
$47.76 |
$25.09 |
$72.85 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
SHEET METAL WORKER
|
$51.45 |
$30.92 |
$82.37 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
SHEET METAL WORKER
|
$53.45 |
$30.92 |
$84.37 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
SHEET METAL WORKER SHEET METAL TECHNICIAN - SCOPE: a. Existing residential buildings, both single and multi-family, where each unit is heated and/or c
|
$38.65 |
$10.31 |
$48.96 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
SOFT FLOOR LAYER
|
$40.77 |
$19.37 |
$60.14 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
SOUND & COMMUNICATIONS: SOUND TECHNICIAN TERMINATING, OPERATING AND PERFORMING FINAL CHECK-OUT SCOPE OF WORK: ASSEMBLY, INSTALLATION, OPERATION, SERVI
|
$43.78 |
$15.39 |
$59.17 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
SPRINKLER FITTER
|
$52.53 |
$28.19 |
$80.72 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TERRAZZO FINISHER
|
$42.11 |
$14.67 |
$56.78 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TERRAZZO WORKER/SETTER
|
$49.62 |
$15.26 |
$64.88 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TILE FINISHER
|
$37.96 |
$13.77 |
$51.73 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TILE LAYER
|
$51.82 |
$19.32 |
$71.14 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRAFFIC SIGNAL, STREET LIGHT AND UNDERGROUND WORK: UTILITY TECHNICIAN #1 WORK ON STREET LIGHTING; TRAFFIC SIGNALS; AND UNDERGROUND SYSTEMS AND/OR ESTA
|
$43.62 |
$14.41 |
$58.03 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRAFFIC SIGNAL, STREET LIGHT AND UNDERGROUND WORK: UTILITY TECHNICIAN #2 WORK ON STREET LIGHTING; TRAFFIC SIGNALS; AND UNDERGROUND SYSTEMS AND/OR ESTA
|
$33.10 |
$14.09 |
$47.19 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVERS: GROUP 1 FUEL MAN, SWAMPER FOOTNOTE: HAZMAT PAY: WORK ON A HAZMAT JOB, WHERE HAZMAT CERTIFICATION IS REQUIRED, SHALL BE PAID, IN ADDITIO
|
$32.12 |
$27.07 |
$59.19 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVERS: GROUP 2- 2-AXLE DUMP TRUCK, 2-AXLE FLAT BED,CONCRETE PUMPING TRUCK, INDUSTRIAL LIFT TRUCK, MOTORIZED TRAFFIC CONTROL, PICKUP TRUCK ON J
|
$42.71 |
$27.07 |
$69.78 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVERS: GROUP 3- 2-AXLE WATER TRUCK, 3-AXLE DUMP TRUCK, 3-AXLE FLAT BED, EROSION CONTROL NOZZLEMAN, DUMP CRETE TRUCK UNDER 6.5 YD, FORKLIFT 15
|
$42.91 |
$27.07 |
$69.98 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVERS: GROUP 5 OFF-ROAD DUMP TRUCK 35 TONS AND OVER, 7-AXLES OR MORE, TRANSIT MIX TRUCKS 8 YD AND OVER, A-FRAME TRUCK, SWEDISH CRANES FOOTNOTE
|
$43.31 |
$27.07 |
$70.38 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVERS: GROUP 6 OFF-ROAD SPECIAL EQUIPMENT FOOTNOTE: HAZMAT PAY: WORK ON A HAZMAT JOB, WHERE HAZMAT CERTIFICATION IS REQUIRED, SHALL BE PAID, I
|
$43.80 |
$27.07 |
$70.87 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVERS: GROUP 7 REPAIRMAN FOOTNOTE: HAZMAT PAY: WORK ON A HAZMAT JOB, WHERE HAZMAT CERTIFICATION IS REQUIRED, SHALL BE PAID, IN ADDITION TO THE
|
$45.31 |
$27.07 |
$72.38 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK GREASER, TRUCK MOUNTED MOBILE SWEEPER 2-AXLE WINCH TRUCK FOOTNOTE: HAZMAT PAY: WORK ON A HAZMAT JOB, WHERE HAZMAT CERTIFICATION IS REQUIRED, SHA
|
$43.11 |
$27.07 |
$70.18 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TYPES; CABLE BUNDLING MACHINE OPERATOR; CABLE TRENCHING MACHINE OPERATOR CAST-IN-PLACE PIPE LAYING MACHINE OPERATOR; COMBINATION MIXER AND COMPRESSOR
|
$66.29 |
$33.20 |
$99.49 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |