ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLU — Prevailing Wage Rates

Davis-Bacon prevailing wages for ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 138 Davis-Bacon rate records nationwide, the median total package (base + fringe) for ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLU is $97.77/hr, with the middle 80% of counties paying between $97.77 and $97.77/hr. The highest state average is New York at $97.77/hr; the lowest is New York at $97.77/hr.

Bottom 10%
$97.77
Median
$97.77
Average
$97.77
Top 10%
$97.77

Range: $97.77 – $97.77/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2111Electricians.

Davis-Bacon median
$97.77/hr
National median total package (base + fringe)
BLS OEWS market median
$29.98/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+226.1%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

New York NY
Avg base: $61.56/hr
Avg total: $97.77/hr
138 rates

All Rates

138 county-level rates for ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLU, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Schenectady NY highway $61.56 $36.21 $97.77 WD →
Schenectady NY heavy $61.56 $36.21 $97.77 WD →
Schenectady NY building $61.56 $36.21 $97.77 WD →
Schoharie NY building $61.56 $36.21 $97.77 WD →
Schoharie NY highway $61.56 $36.21 $97.77 WD →
Schoharie NY heavy $61.56 $36.21 $97.77 WD →
Schuyler NY heavy $61.56 $36.21 $97.77 WD →
Schuyler NY building $61.56 $36.21 $97.77 WD →
Schuyler NY heavy $61.56 $36.21 $97.77 WD →
Schuyler NY highway $61.56 $36.21 $97.77 WD →
Seneca NY highway $61.56 $36.21 $97.77 WD →
Seneca NY heavy $61.56 $36.21 $97.77 WD →
St Lawrence NY heavy $61.56 $36.21 $97.77 WD →
St Lawrence NY highway $61.56 $36.21 $97.77 WD →
Steuben NY heavy $61.56 $36.21 $97.77 WD →
Sullivan NY heavy $61.56 $36.21 $97.77 WD →
Sullivan NY building $61.56 $36.21 $97.77 WD →
Sullivan NY highway $61.56 $36.21 $97.77 WD →
Tioga NY building $61.56 $36.21 $97.77 WD →
Tioga NY highway $61.56 $36.21 $97.77 WD →
Tioga NY heavy $61.56 $36.21 $97.77 WD →
Tompkins NY heavy $61.56 $36.21 $97.77 WD →
Tompkins NY highway $61.56 $36.21 $97.77 WD →
Ulster NY highway $61.56 $36.21 $97.77 WD →
Ulster NY heavy $61.56 $36.21 $97.77 WD →
Ulster NY building $61.56 $36.21 $97.77 WD →
Warren NY heavy $61.56 $36.21 $97.77 WD →
Warren NY building $61.56 $36.21 $97.77 WD →
Warren NY highway $61.56 $36.21 $97.77 WD →
Washington NY building $61.56 $36.21 $97.77 WD →
Washington NY highway $61.56 $36.21 $97.77 WD →
Washington NY heavy $61.56 $36.21 $97.77 WD →
Wayne NY heavy $61.56 $36.21 $97.77 WD →
Wayne NY highway $61.56 $36.21 $97.77 WD →
Wyoming NY highway $61.56 $36.21 $97.77 WD →
Wyoming NY heavy $61.56 $36.21 $97.77 WD →
Yates NY heavy $61.56 $36.21 $97.77 WD →
Yates NY highway $61.56 $36.21 $97.77 WD →
Top-paying counties for ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLU →