Wage Determination NY20260016-16123-hwy

Onondaga, NY · highway · Rev. 2 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination NY20260016-16123-hwy covers 50 trade classifications for highway construction in Onondaga, NY. Total packages (base + fringe) range from $12.53/hr to $107.51/hr, with the highest going to ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: NY20260016-16123-hwy
Revision: 2
Type: highway
County: Onondaga
State: NY
Effective: May 17, 2026
Trades covered: 50
Highest rate: $107.51/hr
Official source: SAM.gov reference NY20260016View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER, CEMENT MASONS FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY,JULY THE 4TH, LABOR DAY, THANKGIVING DAY (PROVIDED THE EMPLOYEE IS EMPLOYED DAY BEF $38.63 $25.05 $63.68 $0.00 $0.00 $0.00 $0.00
CARPENTER $39.52 $27.16 $66.68 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $50.50 $35.03 $85.53 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (REMAINDER OF ONONDAGA COUNTY) $45.00 $31.12 $76.12 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLU $61.56 $36.21 $97.77 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRID $49.25 $31.15 $80.40 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TR $49.25 $31.15 $80.40 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATIO $40.81 $6.99 $47.80 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DA $20.53 $6.39 $26.92 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NE $38.73 $6.93 $45.66 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $42.29 $30.66 $72.95 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $52.86 $35.60 $88.46 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $47.57 $31.03 $78.60 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $31.72 $29.87 $61.59 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER $63.14 $33.82 $96.96 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid $64.59 $42.92 $107.51 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN $35.34 $30.12 $65.46 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or ga $35.34 $30.12 $65.46 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR $55.40 $31.78 $87.18 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail t $55.40 $31.78 $87.18 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER $49.25 $31.15 $80.40 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type undergro $49.25 $31.15 $80.40 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN $61.56 $36.21 $97.77 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type un $61.56 $36.21 $97.77 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC $49.25 $31.15 $80.40 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or g $49.25 $31.15 $80.40 $0.00 $0.00 $0.00 $0.00
GLAZIER $12.01 $0.52 $12.53 $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1 LABORERS, FLAGGERS, OUTBOAR, AND HAND BOATS FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY $36.31 $25.70 $62.01 $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 BULL FLOATS, CHAIN SAW, CONCRETE AGGREGATE, BIN CONCRETE BOOTMAN, GIN BUGGY, HAND ORMACHINE VIBRATOR, JACKHAMMER, MASON TENDER, MORTAR $36.51 $25.70 $62.21 $0.00 $0.00 $0.00 $0.00
LABORER GROUP 3 ALL ROCK OR DRILL MACHINE OPERATORS, ACETYLENE TORCH OPERATORS, ASPHALT RAKER, POWDERMAN. FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, I $36.71 $25.70 $62.41 $0.00 $0.00 $0.00 $0.00
LABORER GROUP 4 BLASTERS, FOR SETTER, STONE OR GRANITE CURB SETTERS. FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIV $36.91 $25.70 $62.61 $0.00 $0.00 $0.00 $0.00
LABORERS BUILDING CONSTRUCTION ASBESTOS AND TOXIC, HAZARDOUS WASTE REMOVAL. ASBESTOS REMOVAL: REMOVAL OF ALL ASBESTOS CONTAINING MATERIALS FROM WALL C $32.10 $22.90 $55.00 $0.00 $0.00 $0.00 $0.00
LABORERS BUILDING CONSTRUCTION LABORER ASBESTOS REMOVAL: REMOVAL OF ALL ASBESTOS CONTAINING MATERIALS FROM WALL CEILINGS, FLOOR COLUMNS, AND OTHER NON $29.60 $22.90 $52.50 $0.00 $0.00 $0.00 $0.00
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFOR $37.72 $27.65 $65.37 $0.00 $0.00 $0.00 $0.00
PAINTERS $42.06 $30.59 $72.65 $0.00 $0.00 $0.00 $0.00
PAVER, CONCRETE PUMP, CRANE, CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR MOUNTED, FRONT END LOADER, GRAYCO EPOXY MACHINE, HI-PRESSURE BOILER, HOIS $43.52 $27.65 $71.17 $0.00 $0.00 $0.00 $0.00
PLUMBER, PIPEFITTER, STEAMFITTER $35.51 $24.57 $60.08 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER, AUTOMATIC FINE GRADER, BACKHOE, BACKHO $55.85 $33.40 $89.25 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 1 AUTOMATED CONCRETE SPREADER, AUTOMATED FINE GRADE MACHINE, BACKHOE, BELT PLACER, BLACKTOP SPREADER, CABLEWAY, CAISS $44.74 $27.65 $72.39 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 2 ASPHALT PAVER, BACKHOE, BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT, BLAST OR ROTARY $54.97 $33.40 $88.37 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 3 $51.69 $33.40 $85.09 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 3 A-FRAME TRUCK, BALLAST REGULATOR, COMPRESSORS; COMPRESSORS (ANY SIZE BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSOR $40.73 $27.65 $68.38 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 4 TOWER CRANES FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DA $65.51 $33.40 $98.91 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 5 CRANES 50 TONS AND OVER FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, C $60.35 $33.40 $93.75 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 5 MASTER MECHANIC AND CHIEF TUNNEL ENGINEER NOTE: HAZMAT PREMIUM 5.00 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEM $47.15 $27.65 $74.80 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 6 CRANES 49 TONS AND BELOW FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY $58.85 $33.40 $92.25 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 7 MASTER MECHANIC FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS $57.20 $33.40 $90.60 $0.00 $0.00 $0.00 $0.00
ROOFER $35.80 $25.99 $61.79 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $46.29 $23.31 $69.60 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $36.29 $23.31 $59.60 $0.00 $0.00 $0.00 $0.00