2 OVER 200' : ADD $2.00
|
$55.42 |
$33.20 |
$88.62 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ASBESTOS/INSULATOR WORKER
|
$43.25 |
$27.29 |
$70.54 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BOILERMAKER
|
$43.34 |
$27.66 |
$71.00 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BRICKLAYER, MARBLE, TILE & TERRAZZO FINISHERS BUILDING CONSTRUCTION
|
$28.52 |
$19.59 |
$48.11 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BRICKLAYER, MARBLE, TILE & TERRAZZO WORKERS BUILDING CONSTRUCTION
|
$35.85 |
$20.37 |
$56.22 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BRICKLAYERS & STONE MASONS, CEMENT MASONS, PLASTERERS, POINTERS, CLEANERS & CAULKERS: BUILDING CONSTRUCTION
|
$39.24 |
$22.02 |
$61.26 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CABLE SPLICER
|
$55.55 |
$35.03 |
$90.58 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER
|
$44.52 |
$27.16 |
$71.68 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER: CARPENTERS, MILLWRIGHTS
|
$30.85 |
$21.32 |
$52.17 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER: PILEDRIVER
|
$30.85 |
$21.32 |
$52.17 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CEMENT MASON/CONCRETE FINISHER, HEAVY/HIGHWAY CONSTRUCION FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, JULY THE 4TH, LABOR DAY, AND THANKSGIVING DAY
|
$37.23 |
$19.51 |
$56.74 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CONVEYOR, ELEVATORS, CONCRETE MIXER AND BELCRETE POWER PACK, SEEDING, AND MULCHING MACHINES, PUMPS FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL
|
$51.01 |
$33.20 |
$84.21 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CRANES GROUP 1 RATE PLUS 1.25 ALL HYDRAULIC CRANES GROUP 1 RATE PLUS 1.10 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY
|
$54.90 |
$32.45 |
$87.35 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN
|
$50.50 |
$35.03 |
$85.53 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLU
|
$61.56 |
$36.21 |
$97.77 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRID
|
$49.25 |
$31.15 |
$80.40 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TR
|
$49.25 |
$31.15 |
$80.40 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATIO
|
$40.81 |
$6.99 |
$47.80 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DA
|
$20.53 |
$6.39 |
$26.92 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NE
|
$38.73 |
$6.93 |
$45.66 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT
|
$42.29 |
$30.66 |
$72.95 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT
|
$52.86 |
$35.60 |
$88.46 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT
|
$47.57 |
$31.03 |
$78.60 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT
|
$31.72 |
$29.87 |
$61.59 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER
|
$63.14 |
$33.82 |
$96.96 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid
|
$64.59 |
$42.92 |
$107.51 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN
|
$35.34 |
$30.12 |
$65.46 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or ga
|
$35.34 |
$30.12 |
$65.46 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR
|
$55.40 |
$31.78 |
$87.18 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail t
|
$55.40 |
$31.78 |
$87.18 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER
|
$49.25 |
$31.15 |
$80.40 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type undergro
|
$49.25 |
$31.15 |
$80.40 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN
|
$61.56 |
$36.21 |
$97.77 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type un
|
$61.56 |
$36.21 |
$97.77 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC
|
$49.25 |
$31.15 |
$80.40 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or g
|
$49.25 |
$31.15 |
$80.40 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELEVATOR CONSTRUCTOR FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY
|
$57.73 |
$38.44 |
$96.17 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
GLAZIER
|
$30.00 |
$27.59 |
$57.59 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
HAZARDOUS MATERIAL HANDLER
|
$38.50 |
$25.04 |
$63.54 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER: STRUCTURAL, ORNAMENTAL, RODMAN, MACHINERY MOVER, RIGGER, FENCE ERECTOR, REINFORCEMENT, AND STONE DERRICKMAN
|
$35.50 |
$31.39 |
$66.89 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: BUILDING CONSTRUCTION: ASBESTOS REMOVAL FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING D
|
$24.00 |
$20.64 |
$44.64 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: BUILDING CONSTRUCTION: HAZARDOUS WASTE REMOVAL FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSG
|
$24.00 |
$20.64 |
$44.64 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: BUILDING CONSTRUCTION: LABORERS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY AND C
|
$22.50 |
$20.64 |
$43.14 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: BUILDING CONSTRUCTION: PIPELAYERS, MOTOR MIXERS, MOTOR BUGGY OPERATOR POWER LIFT FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, JULY THE 4TH, LAB
|
$22.65 |
$20.64 |
$43.29 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: BUILDING CONSTRUCTION: WAGON DRILL OPERATOR FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVI
|
$22.90 |
$20.64 |
$43.54 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: GROUP 1: COMMON LABORERS, FLAGMAN, OUTBOARD AND HAND BOATS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR
|
$28.05 |
$23.74 |
$51.79 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: GROUP 2: BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, JACKHAMMER, MASON TENDER, MOR
|
$28.25 |
$23.74 |
$51.99 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: GROUP 3: ALL ROCK OR DRILLING MACHINE OPERATORS, ACETYLENE TORCH OPERATORS, AND ASPHALT PAVER, POWERMAN FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR
|
$28.45 |
$23.74 |
$52.19 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: GROUP 4: BLASTERERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY
|
$28.65 |
$23.74 |
$52.39 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTERS: BRUSH & ROLL, DRYWALL TAPING/FINISHING
|
$27.27 |
$26.23 |
$53.50 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTERS: SPRAY, SANDBLASTING, STRUCTURAL STEEL
|
$27.77 |
$26.23 |
$54.00 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLUMBER, INCLUDING STEAMFITTING
|
$45.93 |
$33.77 |
$79.70 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: BUILDING GROUP 2 ""A"" FRAME TRUCK, BLACKTOP PLANT, ALL BACK DUMPS, BORING MACHINE, BULLDOZER, CAGEHOIST, CENTRAL MIX PLANT
|
$53.99 |
$32.45 |
$86.44 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: BUILDING GROUP 3 COMPRESSOR, CONCRETE PAVE ROR MIXER, CONCRETE PAVEMENT SPREADERS AND FINISHERS, CONVEYOR, ELECTRIC SUBMERS
|
$51.42 |
$32.45 |
$83.87 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: BUILDING GROUP 4 MASTER MECHANIC HERKIMER COUNTY PREMIUMS: HAZMAT WORK 2.50 QUAD 9 BULLDOZER OR MULTIBOWL SCRAPER .50 FOOTN
|
$57.01 |
$32.45 |
$89.46 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER, AUTOMATIC FINE GRADER, BACKHOE, BACKHO
|
$57.30 |
$33.55 |
$90.85 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER, AUTOMATIC FINE GRADER, BACKHOE, BACKHO
|
$54.90 |
$32.45 |
$87.35 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 2 ASPHALT PAVER, BACKHOE, BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT, BLAST OR ROTARY
|
$56.39 |
$33.55 |
$89.94 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 2 ASPHALT PAVER, BACKHOE, BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT, BLAST OR ROTARY
|
$53.99 |
$32.45 |
$86.44 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 3 A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE, BA
|
$53.82 |
$33.55 |
$87.37 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 3 A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE, BA
|
$51.42 |
$32.45 |
$83.87 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 4 TOWER CRANES HERKIMER COUNTY FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY
|
$63.30 |
$33.55 |
$96.85 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 4 TOWER CRANES HERKIMER COUNTY FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY
|
$60.90 |
$32.45 |
$93.35 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 5 CRANES 50 TONS AND OVER HERKIMER COUNTY FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY
|
$61.80 |
$33.55 |
$95.35 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 5 CRANES 50 TONS AND OVER HERKIMER COUNTY FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY
|
$59.40 |
$32.45 |
$91.85 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 6 CRANES 49 TONS AND BELOW HERKIMER COUNTY FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY
|
$60.30 |
$33.55 |
$93.85 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 6 CRANES 49 TONS AND BELOW HERKIMER COUNTY FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY
|
$57.90 |
$32.45 |
$90.35 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 7 MASTER MECHANIC HERKIMER COUNTY FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR D
|
$58.91 |
$33.55 |
$92.46 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 7 MASTER MECHANIC HERKIMER COUNTY FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DA
|
$57.01 |
$32.45 |
$89.46 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS:, BUILDING: GROUP A (HERKIMER COUNTY) SHOVEL, ALL BACKHOE, GRADALLS, POWER ROAD GRADER, ALL CMI EQUIPMENT, FRONT-END RUBBER
|
$54.93 |
$33.20 |
$88.13 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS:, BUILDING: GROUP B (HERKIMER COUNTY) BACKHOE,, BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM F
|
$53.91 |
$33.20 |
$87.11 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ROOFER
|
$35.80 |
$25.99 |
$61.79 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
SHEET METAL WORKER
|
$46.29 |
$23.31 |
$69.60 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
SHEET METAL WORKER
|
$36.29 |
$23.31 |
$59.60 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
SPRINKLER FITTER
|
$47.85 |
$28.94 |
$76.79 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
THE EMPLOYEE IS EMPLOYED ONE DAY BEFORE AND ONE DAY AFTER THE HOLIDAY)
|
$23.00 |
$20.64 |
$43.64 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |