Wage Determination NY20260050-16081-bld

Erie, NY · building · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination NY20260050-16081-bld covers 69 trade classifications for building construction in Erie, NY. Total packages (base + fringe) range from $19.82/hr to $107.51/hr, with the highest going to ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: NY20260050-16081-bld
Revision: 1
Type: building
County: Erie
State: NY
Effective: May 17, 2026
Trades covered: 69
Highest rate: $107.51/hr
Official source: SAM.gov reference NY20260050View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BOILERMAKER $39.35 $33.18 $72.53 $0.00 $0.00 $0.00 $0.00
BRICKLAYER $39.44 $32.11 $71.55 $0.00 $0.00 $0.00 $0.00
CABLE SPLICER $36.73 $23.39 $60.12 $0.00 $0.00 $0.00 $0.00
CARPENTER $34.73 $28.61 $63.34 $0.00 $0.00 $0.00 $0.00
CEMENT FINISHER $33.65 $31.47 $65.12 $0.00 $0.00 $0.00 $0.00
CEMENT MASON $32.53 $22.10 $54.63 $0.00 $0.00 $0.00 $0.00
COMMUNICATIONS SYSTEM WORK COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, AND REMOVAL OF TELEDATA FACILITIES INCLUDING OUTSIDE PLANT, TEL $44.50 $36.05 $80.55 $0.00 $0.00 $0.00 $0.00
COMMUNICATIONS SYSTEM WORK COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, AND REMOVAL OF TELEDATA FACILITIES INCLUDING OUTSIDE PLANT, TEL $22.90 $21.38 $44.28 $0.00 $0.00 $0.00 $0.00
COMMUNICATIONS SYSTEM WORK COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, AND REMOVAL OF TELEDATA FACILITIES INCLUDING OUTSIDE PLANT, TEL $14.20 $14.02 $28.22 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $44.50 $36.06 $80.56 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLU $61.56 $36.21 $97.77 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRID $49.25 $31.15 $80.40 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TR $49.25 $31.15 $80.40 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATIO $40.81 $6.99 $47.80 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DA $20.53 $6.39 $26.92 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NE $38.73 $6.93 $45.66 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $42.29 $30.66 $72.95 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $52.86 $35.60 $88.46 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $47.57 $31.03 $78.60 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $31.72 $29.87 $61.59 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER $63.14 $33.82 $96.96 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid $64.59 $42.92 $107.51 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN $35.34 $30.12 $65.46 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or ga $35.34 $30.12 $65.46 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR $55.40 $31.78 $87.18 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail t $55.40 $31.78 $87.18 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER $49.25 $31.15 $80.40 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type undergro $49.25 $31.15 $80.40 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN $61.56 $36.21 $97.77 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type un $61.56 $36.21 $97.77 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC $49.25 $31.15 $80.40 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or g $49.25 $31.15 $80.40 $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RA $62.39 $38.44 $100.83 $0.00 $0.00 $0.00 $0.00
GLAZIER $34.68 $27.64 $62.32 $0.00 $0.00 $0.00 $0.00
IRONWORKER $35.49 $32.30 $67.79 $0.00 $0.00 $0.00 $0.00
IRONWORKER: SHEETER $35.49 $32.30 $67.79 $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 2 MORTAR MIXER, ASPHALT SMOOTHERS, PNEUMATIC GAS ELECTRIC TOOL OPERATOR INCLUDING ALL FORMS OF BUSTERS, JACKHAMMERS, AND CHIPPING GUNS $30.60 $28.25 $58.85 $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 3 WORKER ON ANY SWING SCAFFOLD, BLASTER, PLUMBING LABORER, WAGON DRILLER, BOTTOM, LASER SETTER, ASPHALT RAKERS, ASPHALT SCREED MAN $30.71 $28.25 $58.96 $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 4 STONE CUTTER, CURB SETTER AND FLAG LAYER $31.18 $28.25 $59.43 $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 5 ASBESTOS REMOVAL, DELEADER $31.93 $28.25 $60.18 $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 6 HAZARDOUS WASTE WORKER $32.43 $28.25 $60.68 $0.00 $0.00 $0.00 $0.00
MARBLE SETTER $36.85 $30.80 $67.65 $0.00 $0.00 $0.00 $0.00
PAINTERS () $25.95 $23.69 $49.64 $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH & ROLL (ENTIRE COUNTY,) $33.00 $28.21 $61.21 $0.00 $0.00 $0.00 $0.00
PAINTERS: LEAD ABATEMENT () $25.95 $23.69 $49.64 $0.00 $0.00 $0.00 $0.00
PAINTERS: SPRAY, SANDBLASTING, SWING SCAFFOLD OR ANY HANGED RIGGING PLATFORM, EPOXY (ENTIRE COUNTY,) $33.00 $28.21 $61.21 $0.00 $0.00 $0.00 $0.00
PAINTERS: SPRAYING, PAPERHANGERS, SAND BLASTING, SWINGING SCAFFOLD () $25.95 $23.69 $49.64 $0.00 $0.00 $0.00 $0.00
PAINTERS: TAPERS () $26.45 $23.69 $50.14 $0.00 $0.00 $0.00 $0.00
PAINTERS: TAPING/DRYWALL (ENTIRE COUNTY,) $34.00 $28.51 $62.51 $0.00 $0.00 $0.00 $0.00
PIPEFITTER: ERIE- ALL TOWNSHIPS IN THE COUNTY $42.20 $29.80 $72.00 $0.00 $0.00 $0.00 $0.00
PLASTER SCAFFOLD BUILDER, PNEUMATIC GAS, ELECTRIC OPERATOR, INCLUDING ALL FORMS OF BUSTERS, JACKHAMMERS, CHIPPING GUNS AND STEEL BURNERS $30.43 $28.25 $58.68 $0.00 $0.00 $0.00 $0.00
PLASTERER $33.05 $25.09 $58.14 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 1 AIR HOIST, ALL BOOM TYPE EQUIPMENT, ALL PAN AND CARRY-ALLS, ARCHER HOIST, ASPHALT ROLLER ASPHALT SPREADER OR PAVER $44.23 $35.40 $79.63 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 2 AGGREGATE BIN, CMI AND SIMILAR TYPE CONCRETE SPREADS, CEMENT BIN, CHIPPING MACHINE AND CHIP SPREADER, COMPRESSORS $39.14 $35.40 $74.54 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 3 ANY CRANE UP TO 60 TONS NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR $47.48 $35.40 $82.88 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 4 ANY CRANE 61 - 199 TONS NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR $48.48 $35.40 $83.88 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 5 ANY CRANE 200 - 399 TONS NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTES: A. PAID HOLIDAYS: NEW YEA $48.98 $35.40 $84.38 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 6 ANY CRANE 400 TONS AND OVER NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTES: A. PAID HOLIDAYS: NEW $49.48 $35.40 $84.88 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 7 ANY TOWER CRANES NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY $49.98 $35.40 $85.38 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 8 MASTER MEACHANIC NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY $45.47 $35.40 $80.87 $0.00 $0.00 $0.00 $0.00
ROOFERS: COMPOSITION $34.96 $26.03 $60.99 $0.00 $0.00 $0.00 $0.00
ROOFERS: SLATE & TILE $35.11 $26.03 $61.14 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $39.50 $29.18 $68.68 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $15.94 $3.88 $19.82 $0.00 $0.00 $0.00 $0.00
TERRAZZO FINISHER $34.71 $17.54 $52.25 $0.00 $0.00 $0.00 $0.00
TILE FINISHER $34.71 $17.54 $52.25 $0.00 $0.00 $0.00 $0.00
TILESETTER & TERRAZZO WORKER $38.85 $32.20 $71.05 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: INCLUDES SINGLE AXLE DUMP AND OFF-HIGHWAY DUMP TRUCKS WORK ON A HAZARDOUS WASTE SITE THEN ADDITIONAL $2.00 PER HOUR. EUCLIDS ADD $0.25 $47.18 $15.09 $62.27 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS:: DUMP TRUCK ONLY, EXCLUDES SINGLE AXLE DUMP AND OFF-HIGHWAY DUMP TRUCKS FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPE $32.00 $0.00 $32.00 $0.00 $0.00 $0.00 $0.00
View all WDs for Erie → Revision history →