Wage Determination NY20260047-16078-hwy

Allegany, NY · highway · Rev. 2 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination NY20260047-16078-hwy covers 58 trade classifications for highway construction in Allegany, NY. Total packages (base + fringe) range from $26.92/hr to $107.51/hr, with the highest going to ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: NY20260047-16078-hwy
Revision: 2
Type: highway
County: Allegany
State: NY
Effective: May 17, 2026
Trades covered: 58
Highest rate: $107.51/hr
Official source: SAM.gov reference NY20260047View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER (ALLEGANY COUNTY) $38.18 $26.11 $64.29 $0.00 $0.00 $0.00 $0.00
CARPENTER HEAVY AND HIGHWAY CONSTRUCTION FOOTNOTE: A. PAID HOLIDAYS: INDEPENDENCE DAY AND LABOR DAY PROVIDED THE EMPLOYEE WORKS HIS SCHEDULED DAY BEFO $38.18 $26.11 $64.29 $0.00 $0.00 $0.00 $0.00
CARPENTER, PILEDRIVER (ALLEGANY COUNTY) $41.66 $28.46 $70.12 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $38.63 $25.05 $63.68 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLU $61.56 $36.21 $97.77 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRID $49.25 $31.15 $80.40 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TR $49.25 $31.15 $80.40 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATIO $40.81 $6.99 $47.80 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DA $20.53 $6.39 $26.92 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NE $38.73 $6.93 $45.66 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $42.29 $30.66 $72.95 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $52.86 $35.60 $88.46 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $47.57 $31.03 $78.60 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $31.72 $29.87 $61.59 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER $63.14 $33.82 $96.96 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid $64.59 $42.92 $107.51 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN $35.34 $30.12 $65.46 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or ga $35.34 $30.12 $65.46 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR $55.40 $31.78 $87.18 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail t $55.40 $31.78 $87.18 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER $49.25 $31.15 $80.40 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type undergro $49.25 $31.15 $80.40 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN $61.56 $36.21 $97.77 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type un $61.56 $36.21 $97.77 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC $49.25 $31.15 $80.40 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or g $49.25 $31.15 $80.40 $0.00 $0.00 $0.00 $0.00
IRONWORKERS: FENCE ERECTORS $34.06 $30.80 $64.86 $0.00 $0.00 $0.00 $0.00
IRONWORKERS: SHEETER $36.00 $30.80 $66.80 $0.00 $0.00 $0.00 $0.00
IRONWORKERS: STRUCTURAL, ORANMENTAL, REINFORCING STEEL, WELDERS, RIGGERS AND RODMEN $35.49 $32.30 $67.79 $0.00 $0.00 $0.00 $0.00
IRONWORKERS: WINDOW ERECTORS $33.14 $32.30 $65.44 $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 1 FLAGMAN; OUTBOARD AND HAND BOATS; BULL FLOAT; CHAIN SAW; CONCRETE AGGREGATE BIN; CONCRETE BOOT; GIN BUGGY; HAND OR MECHINE VIBRATOR $33.93 $28.69 $62.62 $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 2 BLASTERS; FORM SETTER; STONE OR GRANITE CURB SETTERS; DESIGNATED ASPHALT RAKERS; TAIL OR SCREW OPERATOR ON ASPHALT PAVER. ALL ROCK O $34.33 $28.69 $63.02 $0.00 $0.00 $0.00 $0.00
NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE W $58.38 $35.75 $94.13 $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: GROUP 1 ASPHALT PAVER; AUTOMATIC FINE GRADER; BACKHOE; BLACKTOP PLANT; CABLEWAY; CAISSON AUGER; CENTRAL MIX CONCRETE PLANT; CHERRY $41.26 $34.85 $76.11 $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: GROUP 2 ASPHALT PAVER, BACKHOE, BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT, BLAST OR ROTARY DRILL $54.68 $35.75 $90.43 $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: GROUP 2: AUTOMATED CENTRAL MIX CONCRETE PLANT; BACKHOE; BACKHOE; BITUMINOUS SPREADER AND MIXER; BLACKTOP PLANT; BLAST OR ROTARY DR $57.21 $35.00 $92.21 $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: GROUP 3: ""A"" FRAME TRUCK; BALLAST REGULATOR; COMPRESSORS; COMPRESSORS (ANY SIZE BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS $54.42 $35.00 $89.42 $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: GROUP 3: A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE, BALLAST $51.80 $35.75 $87.55 $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: GROUP 4: CRANE, FRICTION OR LATTICE TYPE WITH BOOM LENGTH 200 FEET AND OVER FOOTNOTE: B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL D $51.41 $35.00 $86.41 $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: GROUP 4TOWER CRANES FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRIST $61.38 $35.75 $97.13 $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: GROUP 7 MASTER MECHANIC FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CH $56.81 $35.75 $92.56 $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: MASTER MECHANIC. FOR EXCAVATION AND PAVING: FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY $60.84 $35.00 $95.84 $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: MASTER MECHANIC. FOR EXCAVATION AND PAVING: FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY $43.26 $34.85 $78.11 $0.00 $0.00 $0.00 $0.00
OVER); HEAD TOWER; HOIST; SHAFT; HOIST; HOLLAND LOADER; MAINTENANCE ENGINEER; MINE HOIST; MINING MACHINE; MUCKING MACHINE OR MOSE; OVERHEAD CRANE; PIL $58.43 $35.00 $93.43 $0.00 $0.00 $0.00 $0.00
OVER); HEAD TOWER; HOIST; SHAFT; HOIST; HOLLAND LOADER; MAINTENANCE ENGINEER; MINE HOIST; MINING MACHINE; MUCKING MACHINE OR MOSE; OVERHEAD CRANE; PIL $55.38 $35.75 $91.13 $0.00 $0.00 $0.00 $0.00
PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY B $59.88 $35.75 $95.63 $0.00 $0.00 $0.00 $0.00
PAINTERS: BRIDGE PAINTING $42.06 $30.59 $72.65 $0.00 $0.00 $0.00 $0.00
PAVER OVER 16S; CONCRETE PUMP; CRUSHER; DRILL RIGS; FRONT END LOADER; HI- PRESSURE BOILER; HOIST; KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS; MAINTE $40.79 $34.85 $75.64 $0.00 $0.00 $0.00 $0.00
PILEDRIVER HEAVY AND HIGHWAY CONSTRUCTION FOOTNOTE: A. PAID HOLIDAYS: INDEPENDENCE DAY AND LABOR DAY PROVIDED THE EMPLOYEE WORKS HIS SCHEDULED DAY BEF $41.66 $28.46 $70.12 $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER: ALLEGANY- THE TOWNSHIPS OF ALLEN, ALMA, AMITY, ANGELICA, BELFAST BOLIVAR, CANEADEA, CENTERVILLE, CLARKSVILLE, CUBA, FRIENDSHIP, GE $42.20 $29.80 $72.00 $0.00 $0.00 $0.00 $0.00
PUMPS WHEN USED IN LIEU OF WELL POINTS, TRACTOR WITH TOWED ACCESSORIES; VIBRATORY COMPACTOR; VIBRO TAMP; WELL POINT FOOTNOTE: A. PAID HOLIDAYS: NEW YE $40.10 $34.85 $74.95 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $35.94 $20.89 $56.83 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $47.85 $28.94 $76.79 $0.00 $0.00 $0.00 $0.00
STEAM CLEANER; TRACTOR FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY, REGARDL $36.61 $34.85 $71.46 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 1 YARDMAN; PICKUPS; PANEL TRUCKS; FLATBOY MATERIALS TRUCKS; SINGLE AXLE DUMP TRUCKS; DUMPSTERS; RECEIVERS; GREASERS; TRUCK TIREMAN $35.48 $31.58 $67.06 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 2 SPECIALIZED EARTH MOVING EQUIPMENT - EUCLID TYPE OR SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF-LOADED; STRADDLE CARRIER; SELF $35.83 $31.58 $67.41 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 1 PICK-UPS; PANEL TRUCKS; FLATBOY MATERIALS TRUCKS; SINGLE AXLE DUMP TRUCKS; DUMPSTERS; RECEIVERS; GREASERS; TRUCK TIREMAN, TANDE $35.48 $31.58 $67.06 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 2 SPECIALIZED EARTH MOVING EQUIPMENT- EUCLID TYPE OR SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF-LOADED; STRAFFLE CARRIER; SELF $35.83 $31.58 $67.41 $0.00 $0.00 $0.00 $0.00
View all WDs for Allegany → Revision history →