Wage Determination NY20260002-16072-hwy

Rensselaer, NY · highway · Rev. 2 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination NY20260002-16072-hwy covers 111 trade classifications for highway construction in Rensselaer, NY. Total packages (base + fringe) range from $26.92/hr to $115.10/hr, with the highest going to ELEVATOR MECHANIC (COLUMBIA COUNTY; GREEN COUNTY) FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: NY20260002-16072-hwy
Revision: 2
Type: highway
County: Rensselaer
State: NY
Effective: May 17, 2026
Trades covered: 111
Highest rate: $115.10/hr
Official source: SAM.gov reference NY20260002View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS/INSULATOR WORKER $41.74 $27.58 $69.32 $0.00 $0.00 $0.00 $0.00
BOILERMAKER $43.34 $27.66 $71.00 $0.00 $0.00 $0.00 $0.00
CARPENTERS $36.38 $24.65 $61.03 $0.00 $0.00 $0.00 $0.00
CARPENTERS $44.28 $24.50 $68.78 $0.00 $0.00 $0.00 $0.00
CARPENTERS & SOFT FLOOR LAYERS: BUILDING CONSTRUCTION $36.38 $24.65 $61.03 $0.00 $0.00 $0.00 $0.00
CARPENTERS: (DIVERS) $45.28 $24.50 $69.78 $0.00 $0.00 $0.00 $0.00
CARPENTERS: CARPENTERS, MILLWRIGHTS, PILE DRIVERS (HEAVY AND HIGHWAY CONSTRUCTION) $44.72 $31.23 $75.95 $0.00 $0.00 $0.00 $0.00
CARPENTERS: DIVERS $69.28 $24.50 $93.78 $0.00 $0.00 $0.00 $0.00
CARPENTERS: HEAVY & HIGHWAY CONSTRUCTION $44.28 $24.50 $68.78 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (ALBANY; COLUMBIA; FULTON; GREENE; MONTGOMERY; RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE; WASHINGTON) $48.00 $32.09 $80.09 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (GREENE COUNTY) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, PRESIDENTIAL ELECTIO $46.50 $40.57 $87.07 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLU $61.56 $36.21 $97.77 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRID $49.25 $31.15 $80.40 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TR $49.25 $31.15 $80.40 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATIO $40.81 $6.99 $47.80 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DA $20.53 $6.39 $26.92 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NE $38.73 $6.93 $45.66 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $42.29 $30.66 $72.95 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $52.86 $35.60 $88.46 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $47.57 $31.03 $78.60 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $31.72 $29.87 $61.59 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS $43.35 $30.73 $74.08 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS $54.19 $35.69 $89.88 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS $43.53 $30.75 $74.28 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS $49.25 $31.15 $80.40 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS $48.77 $31.31 $80.08 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS $32.51 $29.93 $62.44 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER $63.14 $33.82 $96.96 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid $64.59 $42.92 $107.51 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN $35.34 $30.12 $65.46 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or ga $35.34 $30.12 $65.46 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR $55.40 $31.78 $87.18 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail t $55.40 $31.78 $87.18 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER $49.25 $31.15 $80.40 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type undergro $49.25 $31.15 $80.40 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN $61.56 $36.21 $97.77 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type un $61.56 $36.21 $97.77 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC $49.25 $31.15 $80.40 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or g $49.25 $31.15 $80.40 $0.00 $0.00 $0.00 $0.00
ELEVATOR CONSTRUCTOR (ALBANY; COLUMBIA; FULTON; GREENE; MONTGOMERY, RENSSELAER, SARATOGA, SCHENECTADY, SCHOHARIE AND WASHINGTON COUNTIES). FOOTNOTE: A $57.73 $38.44 $96.17 $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC (COLUMBIA COUNTY; GREEN COUNTY) FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 $76.12 $38.98 $115.10 $0.00 $0.00 $0.00 $0.00
GLAZIER $37.25 $33.54 $70.79 $0.00 $0.00 $0.00 $0.00
HAZARDOUS MATERIAL HANDLER $41.74 $27.58 $69.32 $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL, ORNAMENTAL, RODMAN, MACHINERY MOVER, RIGGER, FENCE ERECTOR, REINFORCEMENT, AND STONE DERRICKMAN (FULTON; MONTGOMERY:) $35.50 $31.39 $66.89 $0.00 $0.00 $0.00 $0.00
IRONWORKERS:: SHEETER (ALBANY; COLUMBIA; FULTON; GREENE, MONTGOMERY; RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE; AND WASHINGTON COUNTIES:) $38.75 $25.48 $64.23 $0.00 $0.00 $0.00 $0.00
IRONWORKERS:: SHEETER, BUCKER-UP (ALBANY; COLUMBIA; FULTON; GREENE, MONTGOMERY; RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE; AND WASHINGTON COUNTIES $38.75 $25.48 $64.23 $0.00 $0.00 $0.00 $0.00
IRONWORKERS:: STRUCTURAL, ORNAMENTAL, RODMAN, MACHINERY MOVER, RIGGER, FENCE ERECTOR, REINFORCING, STONE DERRICKMEN (ALBANY; COLUMBIA; FULTON; GREENE $38.50 $25.48 $63.98 $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1: FLAGPERSON, GATEPERSON (GREENE COUNTY HEAVY & HIGHWAY) FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDE $34.15 $27.15 $61.30 $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2: GENERAL LABORERS, CHUCK TENDER, HANDLING AND DISTRIBUTING DRINKING WATER, DISTRIBUTING ALL TOOLS AND SUPPLIES OF LABORERS, NIPPER, PO $38.90 $27.15 $66.05 $0.00 $0.00 $0.00 $0.00
LABORER GROUP 3: Ingersoll Rand heavy duty crawler-master HCMZ, any drill using a 4"""" or larger bit, asbestos, toxic, bio-remediation, phyto-remedia $43.15 $27.15 $70.30 $0.00 $0.00 $0.00 $0.00
LABORER GROUP 4: ASBESTOS, TOXIC, LEAD OR HAZARDOUS MATERIAL ABATEMENT FOREMAN (GREENE COUNTY HEAVY & HIGHWAY) FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS D $48.00 $27.15 $75.15 $0.00 $0.00 $0.00 $0.00
LABORER HEAVY & HIGHWAY) GROUP 1- ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE EQUIPMENT $38.90 $27.15 $66.05 $0.00 $0.00 $0.00 $0.00
LABORER HEAVY & HIGHWAY) GROUP 2- ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE CLOTHING A $43.15 $27.15 $70.30 $0.00 $0.00 $0.00 $0.00
LABORER HEAVY & HIGHWAY: GROUP 1: Common laborers, flagman, outboard & hand boats FULTON; MONTGOMERY; SARATOGA; SCHENECTADY AND SCHOHARIE COUNTIES $39.19 $26.75 $65.94 $0.00 $0.00 $0.00 $0.00
LABORER HEAVY & HIGHWAY: GROUP 2: BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, JACKHAMMER, MA $39.39 $26.75 $66.14 $0.00 $0.00 $0.00 $0.00
LABORER HEAVY & HIGHWAY: GROUP 3: ALL ROCK DRILLING MACHINE OPERATORS, ACETYLENE TORCH OPERATOR, AND ASPHALT PAVER, POWDERMAN FULTON; MONTGOMERY; SARA $39.59 $26.75 $66.34 $0.00 $0.00 $0.00 $0.00
LABORER HEAVY & HIGHWAY: GROUP 4: BLASTERERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS FULTON; MONTGOMERY; SARATOGA; SCHENECTADY AND SCHOHARIE COUN $39.79 $26.75 $66.54 $0.00 $0.00 $0.00 $0.00
LABORER HEAVY & HIGHWAY: GROUP 5: HAZARDOUS WASTE REMOVAL FULTON; MONTGOMERY; SARATOGA; SCHENECTADY AND SCHOHARIE COUNTIES $41.69 $26.75 $68.44 $0.00 $0.00 $0.00 $0.00
LABORERS BUILDING CONSTRUCTION, ASBESTOS REMOVAL (FULTON; MONTGOMERY) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABO $24.00 $20.64 $44.64 $0.00 $0.00 $0.00 $0.00
LABORERS BUILDING CONSTRUCTION, BLASTERS, FORM SETTERS, MOTORBUGGY OPERATOR (FULTON; MONTGOMERY). PAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRES $23.00 $20.64 $43.64 $0.00 $0.00 $0.00 $0.00
LABORERS BUILDING CONSTRUCTION, HAZARDOUS WASTE REMOVAL INCLUDES WETTING, STRIPPING, REMOVAL, SCRAPPING, VACCUUMING, BAGGING AND DISPOSING OF ALL INSU $24.00 $20.64 $44.64 $0.00 $0.00 $0.00 $0.00
LABORERS BUILDING CONSTRUCTION, LABORERS (FULTON; MONTGOMERY) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, T $22.50 $20.64 $43.14 $0.00 $0.00 $0.00 $0.00
LABORERS BUILDING CONSTRUCTION, PIPELAYERS, MOTOR MIXERS, MOTOR BUGGY OPERATOR POWER LIFT (FULTON; MONTGOMERY). FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S $22.65 $20.64 $43.29 $0.00 $0.00 $0.00 $0.00
LABORERS BUILDING CONSTRUCTION, WAGON DRILL OPERATOR (FULTON; MONTGOMERY) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY $22.90 $20.64 $43.54 $0.00 $0.00 $0.00 $0.00
LABORERS GROUP 1: COMMON LABORERS, FLAGMAN, OUTBOARD AND HAND BOATS FULTON; MONTGOMERY FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEP $28.05 $23.74 $51.79 $0.00 $0.00 $0.00 $0.00
LABORERS GROUP 2: BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, JACKHAMMER, MASON TENDER, MORT $28.25 $23.74 $51.99 $0.00 $0.00 $0.00 $0.00
LABORERS GROUP 3: ALL ROCK OR DRILLING MACHINE OPERATORS, ACETYLENE TORCH OPERATORS, AND ASPHALT PAVER, POWDERMAN FULTON; MONTGOMERY FOOTNOTE: A. PAID $28.45 $23.74 $52.19 $0.00 $0.00 $0.00 $0.00
LABORERS GROUP 4: BLASTERERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS FULTON; MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. J $28.65 $23.74 $52.39 $0.00 $0.00 $0.00 $0.00
LABORERS: BUILDING: GROUP 1 COMMON LABORERS ALBANY; GREEN; RENSSELAER COUNTY, WASHINGTON COUNTY, SARATOGA COUNTY $36.16 $26.68 $62.84 $0.00 $0.00 $0.00 $0.00
LABORERS: BUILDING: GROUP 2 HAZARDOUS WASTE REMOVAL COMMERCIAL PROJECTS VALUED AT $800,000 OR LESS AND/OR INDUSTRIAL PROJECTS VALUED AT $100,000 OR LE $37.51 $26.68 $64.19 $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY & HIGHWAY GROUP 1 FLAGPERSON; PLACING AND MAINTENANCE OF ALL FLARES, CONES, LIGHTS, SIGNS, BARRICADES; TRAFFIC CONTROL CUSTODIAL WORK $36.45 $27.80 $64.25 $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY & HIGHWAY GROUP 2 GENERAL LABORERS, DUMPMAN, PITMAN, CONCRETE MAN; SIGNAL MAN; PIPELAYERS; RIP RAP; DRY STONE LAYER; JACK HAMMER; POWD $42.80 $27.80 $70.60 $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY & HIGHWAY GROUP 3 ASPHALT RAKER; ASPHALT SCREEDMAN; DRILLERS; LASER BEAM OPERATOR; FORM SETTER/ALIGNERS; BLASTERS COLUMBIA FOOTNOTE: A $43.90 $27.80 $71.70 $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY & HIGHWAY: GROUP 1: COMMON LABORERS, FLAGMEN, OUTBOARD AND HAND BOATS ALBANY; RENSSELAER; COLUMBIA. GREENE. WASHINGTON COUNTY. SARATAG $41.69 $27.65 $69.34 $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY & HIGHWAY: GROUP 3: ALL ROCK AIR DRILLING MACHINE OPERATORS, ACETYLENE TORCH OPERATORS, AND ASPHALT PAVER, POWDERMAN ALBANY; RENSSELAE $41.89 $27.65 $69.54 $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY & HIGHWAY: GROUP 4: BLASTERERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS ALBANY; RENSSELAER; COLUMBIA. GREENE. WASHINGTON COUNTY. S $42.29 $27.65 $69.94 $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY & HIGHWAY: GROUP 5: HAZARDOUS WASTE REMOVAL ALBANY; RENSSELAER; COLUMBIA. GREENE. WASHINGTON COUNTY. SARATAGO COUNTY FOOTNOTE: PAID HO $44.19 $27.65 $71.84 $0.00 $0.00 $0.00 $0.00
PAINTERS: DRYWALL FINISHER $35.94 $24.66 $60.60 $0.00 $0.00 $0.00 $0.00
PAINTERS: LEAD ABATEMENT WORK $35.94 $24.66 $60.60 $0.00 $0.00 $0.00 $0.00
PAINTERS: PAINTER/PAPERHANGER $35.94 $24.66 $60.60 $0.00 $0.00 $0.00 $0.00
PAINTERS: STRUCTURAL STEEL AND BRIDGE $56.25 $55.14 $111.39 $0.00 $0.00 $0.00 $0.00
PAINTERS: ZONE 1 ZONE #1 ENTIRE COUNTIES OF ALBANY, FULTON, MONTGOMERY, RENNSELAER, SCHOHARIE, SCHENECTADY AND SARATOGA $33.50 $21.69 $55.19 $0.00 $0.00 $0.00 $0.00
PAINTERS: ZONE 1 ZONE #1 ENTIRE COUNTIES OF ALBANY, FULTON, MONTGOMERY, RENNSELAER, SCHOHARIE, SCHENECTADY AND SARATOGA $34.50 $21.69 $56.19 $0.00 $0.00 $0.00 $0.00
PAINTERS: ZONE 2 ZONE #2 ALL OF WASHINGTON COUNTY $33.50 $21.69 $55.19 $0.00 $0.00 $0.00 $0.00
PAINTERS: ZONE 2 ZONE #2 ALL OF WASHINGTON COUNTY $34.50 $21.69 $56.19 $0.00 $0.00 $0.00 $0.00
PAINTERS:: SPRAY RATE $36.94 $24.66 $61.60 $0.00 $0.00 $0.00 $0.00
PLUMBER, INCLUDING STEAMFITTING $31.40 $31.70 $63.10 $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER (ALBANY; COLUMBIA; FULTON; GREENE; MONTGOMERY; RENSSELAER; SCHENECTADY; SARATOGA) $55.26 $29.12 $84.38 $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER (SARATOGA; WASHINGTON COUNTY:) $44.88 $33.60 $78.48 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP A CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TRU $55.42 $33.20 $88.62 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP A SHOVEL, ALL EXCAVATORS, GRADALLS, POWER ROAD GRADER, ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER, TRACTOR-MOUNTE $54.93 $33.20 $88.13 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP B BACKHOE,, BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GRADER, ROAD ROLLER, BLACK $53.91 $33.20 $87.11 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP C FORK LIFT, HIGH LIFT, LULL, OILER, FIREMAN AND HEAVY- DUTY GREASER, BOILERS, AND STEAM GENERATORS, PUMP, VIBRATOR, M $51.01 $33.20 $84.21 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER, AUTOMATIC FINE GRADER, BACKHOE, BACKHO $57.30 $33.55 $90.85 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 2 ASPHALT PAVER, BACKHOE, BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT, BLAST OR ROTARY $56.39 $33.55 $89.94 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 3 $53.82 $33.55 $87.37 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 4 TOWER CRANES FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DA $63.30 $33.55 $96.85 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 5 CRANES 50 TONS AND OVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THAN $61.80 $33.55 $95.35 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 6 CRANES 49 TONS AND BELOW FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THA $60.30 $33.55 $93.85 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 7 MASTER MECHANIC FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING $58.91 $33.55 $92.46 $0.00 $0.00 $0.00 $0.00
ROOFER $30.50 $19.84 $50.34 $0.00 $0.00 $0.00 $0.00
ROOFER $38.05 $24.27 $62.32 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. IF ANY OF T $33.73 $33.04 $66.77 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $47.85 $28.94 $76.79 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 1 PICK-UPS, PANEL TRUCKS, FLATBOY MATERIAL TRUCKS, SINGLE AXLE DUMP TRUCKS, DUMPSTERS, RECEIVERS, GREASERS, TRUCK TIREMAN FOOTNOT $41.23 $31.42 $72.65 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 1 STRAIGHT, WINCH, TRANSIT MIX ON JOB SITE, ROAD OILERS, DUMP, PANEL, PICK-UP, WATER AND FUEL TRUCKS ON SITE FOOTNOTES: A. ONE WE $33.65 $30.79 $64.44 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 2 EUCLID OR SIMILAR EQUIPMENT, LOWBOY OR LOWBOY TRAILERS FOOTNOTES: A. ONE WEEK VACATION AFTER 1 YEAR; 2 WEEKS VACATION AFTER 5 Y $33.95 $30.79 $64.74 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 2 TANDEMS, BATCH TRUCKS, MECHANICS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSG $41.29 $31.42 $72.71 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 3 SEMI-TRAILERS, LOW-BOY TRUCKS, ASPHALT DISTRIBUTOR TRUCKS, AGITATOR, MIXER TRUCKS AND DUMPCRETE TYPE VEHICLES, TRUCK MECHANIC $41.38 $31.42 $72.80 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 4 SPECIALIZED EARTH MOVING EQUIPMENT - EUCLID TYPE OR SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF-LOADED, STRADDLE CARRIER, SEL $41.52 $31.42 $72.94 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 5 OFF-HIGHWAY TANDEM BACK DUMP, TWIN ENGINE EQUIPMENT AND DOUBLE HITCHED EQUIPMENT WHERE NOT SELF-LOADED FOOTNOTE: A. PAID HOLIDA $41.69 $31.42 $73.11 $0.00 $0.00 $0.00 $0.00
View all WDs for Rensselaer → Revision history →