|
100 tons; Self- propelled boom-type lifting device over 100 tons. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour a
|
$43.72 |
$31.15 |
$74.87 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00 PER FOOT SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RAT
|
$59.51 |
$34.69 |
$94.20 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00 PER FOOT SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RAT
|
$64.51 |
$34.69 |
$99.20 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF INCEPTION. FOOTNOTES: LABORERS WORKING OF
|
$36.05 |
$27.30 |
$63.35 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER
|
$35.31 |
$12.75 |
$48.06 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANI
|
$64.56 |
$25.07 |
$89.63 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BRICKLAYER SPECIALTY PAY: UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH BASINS, SEWER PIPES AND TELEPHONE CONDUIT SHALL BE PAID $1
|
$57.02 |
$28.50 |
$85.52 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BULK CEMENT SPREADER; DUMPCRETE TRUCK; SKID TRUCK; DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE R
|
$44.56 |
$34.28 |
$78.84 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER DEL NORTE, HUMBOLDT, LAKE AND MENDOCINO COUNTIES
|
$54.85 |
$31.49 |
$86.34 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER DEL NORTE, HUMBOLDT, LAKE AND MENDOCI
|
$47.77 |
$31.49 |
$79.26 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTERS: JOURNEYMAN CARPENTER DEL NORTE, HUMBOLDT, LAKE AND MENDOCINO COUNTIES
|
$47.62 |
$31.49 |
$79.11 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTERS: MILLWRIGHT
|
$50.12 |
$33.08 |
$83.20 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CEMENT MASON/CONCRETE FINISHER
|
$32.15 |
$23.27 |
$55.42 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DEL NORTE Area 1: Extreme Southwest Area 2: HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOCINO Area 1: C
|
$58.09 |
$32.53 |
$90.62 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DEL NORTE Area 1: Extreme Southwest Area 2: HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOCINO Area 1: C
|
$60.37 |
$32.53 |
$92.90 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DEL NORTE Area 1: Extreme Southwest Area 2: HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOCINO Area 1: C
|
$61.70 |
$32.53 |
$94.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DEL NORTE Area 1: Extreme Southwest Area 2: HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOCINO Area 1: C
|
$65.43 |
$32.53 |
$97.96 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DEL NORTE Area 1: Extreme Southwest Area 2: HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOCINO Area 1: C
|
$58.19 |
$32.53 |
$90.72 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DEL NORTE Area 1: Extreme Southwest Area 2: HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOCINO Area 1: C
|
$59.33 |
$32.53 |
$91.86 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DEL NORTE Area 1: Extreme Southwest Area 2: HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOCINO Area 1: C
|
$60.47 |
$32.53 |
$93.00 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DEL NORTE Area 1: Extreme Southwest Area 2: HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOCINO Area 1: C
|
$64.34 |
$32.53 |
$96.87 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DEL NORTE Area 1: Extreme Southwest Area 2: HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOCINO Area 1: C
|
$44.83 |
$31.15 |
$75.98 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DEL NORTE Area 1: Extreme Southwest Area 2: HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOCINO Area 1: C
|
$45.07 |
$31.15 |
$76.22 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DEL NORTE Area 1: Extreme Southwest Area 2: HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOCINO Area 1: C
|
$68.59 |
$32.53 |
$101.12 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DEL NORTE Area 1: Extreme Southwest Area 2: HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOCINO Area 1: C
|
$43.79 |
$31.15 |
$74.94 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DEL NORTE Area 1: Extreme Southwest Area 2: HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOCINO Area 1: C
|
$46.08 |
$31.15 |
$77.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DEL NORTE Area 1: Extreme Southwest Area 2: HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOCINO Area 1: C
|
$59.98 |
$32.53 |
$92.51 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DEL NORTE Area 1: Extreme Southwest Area 2: HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOCINO Area 1: C
|
$62.57 |
$32.53 |
$95.10 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DEL NORTE Area 1: Extreme Southwest Area 2: HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOCINO Area 1: C
|
$66.96 |
$32.53 |
$99.49 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DEL NORTE Area 1: Extreme Southwestern Area 2: Remainder HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOC
|
$49.64 |
$28.56 |
$78.20 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DEL NORTE Area 1: Extreme Southwestern Area 2: Remainder HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOC
|
$47.64 |
$28.56 |
$76.20 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DEL NORTE Area 1: Extreme Southwestern Area 2: Remainder HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOC
|
$54.25 |
$28.56 |
$82.81 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DEL NORTE Area 1: Extreme Southwestern Area 2: Remainder HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOC
|
$52.25 |
$28.56 |
$80.81 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DEL NORTE Area 1: Extreme Southwestern Area 2: Remainder HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOC
|
$57.85 |
$28.56 |
$86.41 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DEL NORTE Area 1: Extreme Southwestern Area 2: Remainder HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOC
|
$55.85 |
$28.56 |
$84.41 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DIVER: ASSISTANT TENDER, ROV TENDER/TECHNICIAN DEPTH PAY: 050 TO 100 FT $2.00 PER FOOT 101 TO 150 FT $3.00 PER FOOT 151 TO 220 FT $4.00 PER FOOT 221 F
|
$54.10 |
$34.69 |
$88.79 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DIVER: DIVER WET DEPTH PAY: 050 TO 100 FT $2.00 PER FOOT 101 TO 150 FT $3.00 PER FOOT 151 TO 220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00 PER FOOT SATUR
|
$103.62 |
$34.69 |
$138.31 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WOR
|
$59.51 |
$34.69 |
$94.20 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WOR
|
$60.51 |
$34.69 |
$95.20 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
Derrick under 100 tons; Self-propelled boom-type lifting device over 45 tons to 100 tons; Tower crane. FOOTNOTE: Work suspended by ropes or cables, or
|
$43.45 |
$31.15 |
$74.60 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN LAKE AND MENDOCINO COUNTIES TUNNEL WORK: ADD $0.50 PER HOUR
|
$59.17 |
$32.04 |
$91.21 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIANS DEL NORTE AND HUMBOLDT COUNTIES TUNNEL WORK: ADD $0.50 PER HOUR
|
$59.17 |
$32.04 |
$91.21 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKERS: FENCE ERECTOR DEL NORTE COUNTY PREMIUM PAY: $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolat
|
$45.78 |
$26.51 |
$72.29 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKERS: FENCE ERECTOR. PREMIUM PAY: $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Nava
|
$45.78 |
$26.51 |
$72.29 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL PREMIUM PAY: $6.00 additional per hour at the following locations: China Lake Naval Test Station
|
$43.75 |
$34.45 |
$78.20 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL. PREMIUM PAY: $6.00 additional per hour at the following locations: China Lake Naval Test Station
|
$50.70 |
$35.15 |
$85.85 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 1- ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO AND SANTA CLARA COUNTIES ASBESTOS REMOVAL-SCOPE OF WORK
|
$39.15 |
$30.03 |
$69.18 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 2- CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA,MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, STANISLAUS, AND TUO
|
$38.15 |
$30.03 |
$68.18 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER: MASON TENDER-BRICK FOOTNOTE: REFRACTORY WORK WHERE HEAT-PROTECTIVE CLOTHING IS REQUIRED: $2.00 PER HOUR ADDITIONAL
|
$36.84 |
$26.24 |
$63.08 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER: MASON TENDER-BRICK MARIN COUNTY FOOTNOTE: REFRACTORY WORK WHERE HEAT-PROTECTIVE CLOTHING IS REQUIRED: $2.00 PER HOUR ADDITIONAL
|
$37.54 |
$25.55 |
$63.09 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER: TRAFFIC CONTROL PERSON I: LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE. DEL NORTE, HUMBOLDT, LAKE, AND M
|
$36.26 |
$27.30 |
$63.56 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER: TRAFFIC CONTROL PERSON II: INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH CUSHIONS. DEL NORTE, HUMBOLD
|
$34.06 |
$27.30 |
$61.36 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-A: JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG
|
$35.72 |
$27.30 |
$63.02 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-C: BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WE
|
$35.55 |
$27.30 |
$62.85 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-F: WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE FOOTNOTES: LABORERS WORKING OFF OR W
|
$36.08 |
$27.30 |
$63.38 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1: ASPHALT SPREADER BOXES; BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRA
|
$35.50 |
$27.30 |
$62.80 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER; CONCRETE
|
$35.35 |
$27.30 |
$62.65 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 3: CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WA
|
$35.25 |
$27.30 |
$62.55 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS:, GUNITE: GROUP 1: STRUCTURAL NOZZLEMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HO
|
$36.46 |
$27.30 |
$63.76 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS:, GUNITE: GROUP 3: REBOUNDMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR ADDITIO
|
$35.37 |
$27.30 |
$62.67 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS:, GUNITE: GROUP 4: GUNITE LABORER FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR ADD
|
$35.25 |
$27.30 |
$62.55 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS:, WRECKING: GROUP 1: Skilled wrecker FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR
|
$35.50 |
$27.30 |
$62.80 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS:, WRECKING: GROUP 2: Semi-skilled wrecker FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER
|
$35.35 |
$27.30 |
$62.65 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LANDSCAPE LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BEL
|
$35.25 |
$27.30 |
$62.55 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LANDSCAPE LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BEL
|
$28.94 |
$27.30 |
$56.24 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LANDSCAPE/IRRIGATION FITTER: UNDERGROUND/UTLIITY FITTER LAKE AND MENDOCINO COUNTIES
|
$77.35 |
$36.53 |
$113.88 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: EQUIPMENT SPECIALIST (OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES, OVERHEAD & UNDERGROUND DIS
|
$53.30 |
$22.26 |
$75.56 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: GROUNDMAN HUMBOLDT, LAKE AND MENDOCINO COUNTIES HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY
|
$40.76 |
$21.76 |
$62.52 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: LINEMAN; CABLE SPLICER HUMBOLDT, LAKE AND MENDOCINO COUNTIES HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DA
|
$70.16 |
$24.71 |
$94.87 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
MARBLE FINISHER
|
$42.06 |
$19.80 |
$61.86 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
MARBLE MASON
|
$61.72 |
$30.31 |
$92.03 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 5: Cast-in-place pipe laying machine; Combination slusher and motor operator; Concrete conveyor or concrete p
|
$61.30 |
$32.53 |
$93.83 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 7: Ballast regulator; Boom truck or dual-purpose A-frame truck, non-rotating - under 15 tons; Cary lift or si
|
$58.84 |
$32.53 |
$91.37 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8-A: Elevator operator; Skidsteer loader-Bobcat 743 series or smaller, and similar; Mini excavator under 25 H
|
$55.49 |
$32.53 |
$88.02 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8: Bit sharpener; Boiler tender; Box operator; Brakeperson; Combination mixer and compressor; Compressor oper
|
$57.70 |
$32.53 |
$90.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, AREA 1:GROUP 3: Asphalt milling machine; Cable backhoe; Combination backhoe and loader over 3/4 cu. yds.; Continuous flight
|
$63.95 |
$32.53 |
$96.48 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS, CRANES - AREA 1: GROUP 2: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Cra
|
$66.08 |
$32.53 |
$98.61 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS, CRANES - AREA 1: GROUP 4: Boom Truck or dual purpose A-frame truck, non-rotating over 15 tons; Truc
|
$61.30 |
$32.53 |
$93.83 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS, HYDRAULIC - AREA 1: GROUP 3: Clamshell and dragline up to and including 1 cu. yd.; Cranes 45 tons a
|
$44.44 |
$31.15 |
$75.59 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS, OILER - AREA 1: GROUP 2: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Cran
|
$42.83 |
$31.15 |
$73.98 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS, OILER - AREA 1: GROUP 3: Clamshell and dragline up to and including 1 cu. yd.; Cranes 45 tons and u
|
$42.55 |
$31.15 |
$73.70 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, PILEDRIVING, Lifting Devices - AREA 1: GROUP 1: Derrick barge pedestal mounted over 100 tons; Clamshell over 7 cu. yds.; Se
|
$52.64 |
$31.15 |
$83.79 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, PILEDRIVING, Lifting Devices - AREA 1: GROUP 2: Derrick barge pedestal mounted 45 tons to and including 100 tons; Clamshell
|
$50.82 |
$31.15 |
$81.97 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, PILEDRIVING, Lifting Devices - AREA 1: GROUP 3: Derrick barge pedestal mounted under 45 tons; Self- propelled boom-type lif
|
$49.14 |
$31.15 |
$80.29 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, PILEDRIVING, Lifting Devices - AREA 1: GROUP 4: Assistant operator in lieu of assistant to engineer; Forklift, 10 tons and
|
$47.37 |
$31.15 |
$78.52 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, PILEDRIVING, Lifting Devices - AREA 1: GROUP 6: DECKHAND; FIRE TENDER FOOTNOTE: Work suspended by ropes or cables, or work
|
$42.50 |
$31.15 |
$73.65 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, PILEDRIVING, Lifting Devices - AREA : GROUP 5: DECK ENGINEER FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Y
|
$44.73 |
$31.15 |
$75.88 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, PILEDRIVING, Truck Crane OIler - AREA 1: GROUP 1: Derrick barge pedestal mounted over 100 tons; Clamshell over 7 cu. yds
|
$45.66 |
$31.15 |
$76.81 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, PILEDRIVING, Truck Crane Oiler - AREA 1: GROUP 2: Derrick barge pedestal mounted 45 tons to and including 100 tons; Clamshe
|
$45.41 |
$31.15 |
$76.56 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, PILEDRIVING, Truck Crane Oiler - AREA 1: GROUP 3: Derrick barge pedestal mounted under 45 tons; Self- propelled boom-type l
|
$45.12 |
$31.15 |
$76.27 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, STEEL ERECTION, CRANES - AREA 1: GROUP 1: Crane over 100 tons; Derrick over 100 tons; Self- propelled boom-type lifting dev
|
$68.81 |
$32.53 |
$101.34 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, STEEL ERECTION, CRANES - AREA 1: GROUP 2: Crane over 45 tons to 100 tons; Derrick under 100 tons; Self-propelled boom-type
|
$67.04 |
$32.53 |
$99.57 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, STEEL ERECTION, CRANES - AREA 1: GROUP 4: Chicago boom; Forklift, 10 tons and over; Heavy-duty repair person/welder. FOOTNO
|
$63.54 |
$32.53 |
$96.07 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, STEEL ERECTION, CRANES - AREA 1: GROUP 5: Boom cat. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $
|
$62.24 |
$32.53 |
$94.77 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, STEEL ERECTION, Cranes - AREA 1: GROUP 3: Crane, 45 tons and under; Self-propelled boom-type lifting device, 45 tons and un
|
$65.56 |
$32.53 |
$98.09 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, STEEL ERECTION, Hydraulic - AREA 1: GROUP 3: Crane, 45 tons and under; Self-propelled boom-type lifting device, 45 tons and
|
$60.61 |
$32.53 |
$93.14 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, STEEL ERECTION, TRUCK CRANE OILER - AREA 1: GROUP 1: Crane over 100 tons; Derrick over 100 tons; Self- propelled boom-type
|
$45.95 |
$31.15 |
$77.10 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, STEEL ERECTION, TRUCK CRANE OILER - AREA 1: GROUP 2: Crane over 45 tons to 100 tons; Derrick under 100 tons; Self-propelled
|
$45.73 |
$31.15 |
$76.88 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, STEEL ERECTION, TRUCK CRANE OILER - AREA 1: GROUP 3: Crane, 45 tons and under; Self-propelled boom-type lifting device, 45
|
$45.46 |
$31.15 |
$76.61 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1: SHAFTS, STOPES, RAISES: GROUP 1-A: Tunnel bore machine operator, 20' diameter or more
|
$65.53 |
$32.53 |
$98.06 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1: SHAFTS, STOPES, RAISES: GROUP 1: Heading shield operator; Heavy-duty repairperson; Mu
|
$63.06 |
$32.53 |
$95.59 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1: SHAFTS, STOPES, RAISES: GROUP 2: Combination slusher and motor operator; Concrete pum
|
$61.80 |
$32.53 |
$94.33 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1: UNDERGROUND: GROUP 1: Heading shield operator; Heavy-duty repairperson; Mucking machi
|
$62.96 |
$32.53 |
$95.49 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1: UNDERGROUND: GROUP 4: Combination slurry mixer cleaner; Grouting Machine operator; Mo
|
$59.23 |
$32.53 |
$91.76 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTERS
|
$53.38 |
$28.04 |
$81.42 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTERS: BRUSH & ROLLER
|
$13.35 |
$2.94 |
$16.29 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTERS: SANDBLASTER, SPRAY, STRUCTURAL STEEL & SWING STAGE
|
$13.60 |
$2.94 |
$16.54 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMEMT: GROUP 2 GAMECOURT & PLAYGROUND INSTALLER
|
$34.71 |
$17.62 |
$52.33 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 1 STRIPER: LAYOUT AND APPLICATION OF PAINTED TRAFFIC STRIPES AND MARKING; HOT THERMO
|
$40.83 |
$17.62 |
$58.45 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 3 PROTECTIVE COATING, PAVEMENT SEALING
|
$35.11 |
$17.62 |
$52.73 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PILEDRIVER
|
$54.10 |
$34.69 |
$88.79 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLUMBER: ALL OTHER WORK - NEW CONSTRUCTION RATE
|
$91.00 |
$49.40 |
$140.40 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLUMBER: Work on wooden frame structures 5 stories or less excluding high-rise buildings and commercial work such as hospitals, prisons, hotels, schoo
|
$69.70 |
$46.38 |
$116.08 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
SHEET METAL WORKER
|
$55.92 |
$45.29 |
$101.21 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
SHEET METAL WORKER
|
$64.06 |
$46.83 |
$110.89 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
Self-propelled boom-type lifting device, 45 tons and under. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additio
|
$43.23 |
$31.15 |
$74.38 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TERRA COBRA, LETOURNEAU PULLS, TOURNOROCKER, EUCLID AND SIMILAR TYPE EQUIPMENT WHEN PULLING FUEL AND/OR GREASE TANK TRAILERS OR OTHER MISCELLANEOUS TR
|
$44.21 |
$34.28 |
$78.49 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TERRAZZO FINISHER
|
$44.93 |
$20.98 |
$65.91 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TERRAZZO WORKER/SETTER
|
$60.58 |
$29.79 |
$90.37 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TILE FINISHER DEL NORTE & HUMBOLDT COUNTIES
|
$37.75 |
$19.28 |
$57.03 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TILE FINISHER LAKE & MENDOCINO COUNTIES
|
$35.78 |
$19.23 |
$55.01 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TILE LAYER DEL NORTE & HUMBOLDT COUNTIES
|
$59.92 |
$22.62 |
$82.54 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TILE LAYER LAKE & MENDOCINO COUNTIES
|
$56.79 |
$22.54 |
$79.33 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVERS: GROUP 1: DUMP TRUCKS, UNDER 6 YDS.; SINGLE UNIT FLAT RACK; NIPPER TRUCK; CONCRETE PUMP TRUCK; CONCRETE PUMP MACHINE; FORK LIFT AND LIFT
|
$43.26 |
$34.28 |
$77.54 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TUNNEL AND SHAFT LABORERS: GROUP 2- RODMEN; SHAFT WORK & RAISE
|
$45.66 |
$27.72 |
$73.38 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TUNNEL AND SHAFT LABORERS: GROUP 3- BIT GRINDER; BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER IN TU
|
$45.41 |
$27.72 |
$73.13 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TUNNEL AND SHAFT LABORERS: GROUP 4- VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING
|
$44.96 |
$27.72 |
$72.68 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST.$ 46.41 27.72 TUNNEL AND SHAFT LABORERS: GROUP 5- GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN
|
$44.42 |
$27.72 |
$72.14 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
UNDERGROUND UTILITY WORKER: LANDSCAPE FITTER
|
$36.01 |
$18.50 |
$54.51 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
UNIT); HIGHBED HEAVY DUTY TRANSPORT; SCISSOR TRUCK; RUBBER-TIRED MUCK CAR; RUBBER-TIRED TRUCK JUMBO; WINCH TRUCK AND ""A"" FRAME DRIVERS; COMBINATION
|
$43.56 |
$34.28 |
$77.84 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
WATER TRUCKS, 7,000 GALS. AND OVER; JETTING TRUCKS, 7,000 GALS. AND OVER; VACUUM TRUCKS UNDER 7500 GALS. TRUCKS TOWING TILT BED OR FLAT BED PULL TRAIL
|
$43.86 |
$34.28 |
$78.14 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL
|
$36.20 |
$27.30 |
$63.50 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
over 100 tons; Clamshell over 7 cu. yds.; Self-propelled boom-type lifting device over 100 tons; Truck crane or crawler, land or barge mounted over 10
|
$43.38 |
$31.15 |
$74.53 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
tons to and including 100 tons; Clamshell up to and including 7 cu. yds.; Self-propelled boom-type lifting device over 45 tons; Truck crane or crawler
|
$43.11 |
$31.15 |
$74.26 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
under 45 tons; Self- propelled boom-type lifting device 45 tons and under; Skid/scow piledriver, any tonnage; Truck crane or crawler, land or barge mo
|
$42.89 |
$31.15 |
$74.04 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |