Wage Determination CA20260021-16371-hvy

Tulare, CA · heavy · Rev. 2 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination CA20260021-16371-hvy covers 118 trade classifications for heavy construction in Tulare, CA. Total packages (base + fringe) range from $48.06/hr to $138.31/hr, with the highest going to DIVER: DIVER WET DEPTH PAY: 050 TO 100 FT $2.00 PER FOOT 101 TO 150 FT $3.00 PER FOOT 151 TO 220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00 PER FOOT SATUR. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: CA20260021-16371-hvy
Revision: 2
Type: heavy
County: Tulare
State: CA
Effective: May 17, 2026
Trades covered: 118
Highest rate: $138.31/hr
Official source: SAM.gov reference CA20260021View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00 PER FOOT SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RAT $59.51 $34.69 $94.20 $0.00 $0.00 $0.00 $0.00
220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00 PER FOOT SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RAT $64.51 $34.69 $99.20 $0.00 $0.00 $0.00 $0.00
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER $35.31 $12.75 $48.06 $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKERS/INSULATOR $64.56 $25.07 $89.63 $0.00 $0.00 $0.00 $0.00
BOILERMAKER $45.60 $38.99 $84.59 $0.00 $0.00 $0.00 $0.00
BORDER WITH SHASTA COUNTY AREA 2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PAR $57.65 $39.55 $97.20 $0.00 $0.00 $0.00 $0.00
BORDER WITH SHASTA COUNTY AREA 2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PAR $55.65 $39.55 $95.20 $0.00 $0.00 $0.00 $0.00
BRICKLAYER; MARBLE SETTER *THE WAGE SCALE FOR PREVAILING WAGE PROJECTS PERFORMED IN BLYTHE, CHINA LAKE, DEATH VALLEY, FORT IRWIN, TWENTY-NINE PALMS, N $45.53 $20.29 $65.82 $0.00 $0.00 $0.00 $0.00
BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH $53.23 $39.55 $92.78 $0.00 $0.00 $0.00 $0.00
BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH $56.53 $39.55 $96.08 $0.00 $0.00 $0.00 $0.00
BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH $51.23 $39.55 $90.78 $0.00 $0.00 $0.00 $0.00
BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH $54.53 $39.55 $94.08 $0.00 $0.00 $0.00 $0.00
CARPENTERS $45.57 $30.82 $76.39 $0.00 $0.00 $0.00 $0.00
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER $52.65 $30.82 $83.47 $0.00 $0.00 $0.00 $0.00
CARPENTERS: JOURNEYMAN CARPENTER $45.42 $30.82 $76.24 $0.00 $0.00 $0.00 $0.00
CARPENTERS: MILLWRIGHT $47.92 $32.41 $80.33 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $32.15 $23.27 $55.42 $0.00 $0.00 $0.00 $0.00
CRANE, OVER 45 TONS UP TO AND INCLUDING 100 TONS; DERRICK BARGE, 100 TONS AND UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, OVER 45 TONS; TOWER CRAN $66.08 $32.53 $98.61 $0.00 $0.00 $0.00 $0.00
DEVICE OVER 100 TONS FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL $68.81 $32.53 $101.34 $0.00 $0.00 $0.00 $0.00
DIVER: ASSISTANT TENDER, ROV TENDER/TECHNICIAN DEPTH PAY: 050 TO 100 FT $2.00 PER FOOT 101 TO 150 FT $3.00 PER FOOT 151 TO 220 FT $4.00 PER FOOT 221 F $54.10 $34.69 $88.79 $0.00 $0.00 $0.00 $0.00
DIVER: DIVER WET DEPTH PAY: 050 TO 100 FT $2.00 PER FOOT 101 TO 150 FT $3.00 PER FOOT 151 TO 220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00 PER FOOT SATUR $103.62 $34.69 $138.31 $0.00 $0.00 $0.00 $0.00
DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WOR $59.51 $34.69 $94.20 $0.00 $0.00 $0.00 $0.00
DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WOR $60.51 $34.69 $95.20 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $50.00 $30.15 $80.15 $0.00 $0.00 $0.00 $0.00
FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED. TRUCK DRIVERS: GROUP 1: DUMP TRUCKS, UNDER 6 YDS.; SINGLE UNIT FLAT RACK; NIPPER TRUCK; CONCRETE PUMP TR $43.26 $34.28 $77.54 $0.00 $0.00 $0.00 $0.00
GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS $35.25 $27.30 $62.55 $0.00 $0.00 $0.00 $0.00
GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS $28.94 $27.30 $56.24 $0.00 $0.00 $0.00 $0.00
IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL. LABORERS:, WRECKING: GROUP 1: Skilled wrecker FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS $35.50 $27.30 $62.80 $0.00 $0.00 $0.00 $0.00
IRONWORKER.$ 50.70 35.15 IRONWORKER $45.78 $26.51 $72.29 $0.00 $0.00 $0.00 $0.00
LABORER CLASSIFICATIONS $28.94 $27.30 $56.24 $0.00 $0.00 $0.00 $0.00
LABORER CLASSIFICATIONS $36.05 $27.30 $63.35 $0.00 $0.00 $0.00 $0.00
LABORER: TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON $36.26 $27.30 $63.56 $0.00 $0.00 $0.00 $0.00
LABORER: TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE $36.56 $27.30 $63.86 $0.00 $0.00 $0.00 $0.00
LABORER: TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH $34.06 $27.30 $61.36 $0.00 $0.00 $0.00 $0.00
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-A: JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG $35.72 $27.30 $63.02 $0.00 $0.00 $0.00 $0.00
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-C: BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WE $35.55 $27.30 $62.85 $0.00 $0.00 $0.00 $0.00
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-F: WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE FOOTNOTES: LABORERS WORKING OFF OR W $36.08 $27.30 $63.38 $0.00 $0.00 $0.00 $0.00
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1: ASPHALT SPREADER BOXES; BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRA $35.50 $27.30 $62.80 $0.00 $0.00 $0.00 $0.00
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER; CONCRETE $35.35 $27.30 $62.65 $0.00 $0.00 $0.00 $0.00
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 3: CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WA $35.25 $27.30 $62.55 $0.00 $0.00 $0.00 $0.00
LABORERS:, GUNITE: GROUP 1: STRUCTURAL NOZZLEMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HO $36.46 $27.30 $63.76 $0.00 $0.00 $0.00 $0.00
LABORERS:, GUNITE: GROUP 3: REBOUNDMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR ADDITIO $35.37 $27.30 $62.67 $0.00 $0.00 $0.00 $0.00
LABORERS:, GUNITE: GROUP 4: GUNITE LABORER FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR ADD $35.25 $27.30 $62.55 $0.00 $0.00 $0.00 $0.00
LABORERS:, WRECKING: GROUP 2: Semi-skilled wrecker FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER $35.35 $27.30 $62.65 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: EQUIPMENT SPECIALIST (OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES, OVERHEAD & UNDERGROUND DIS $53.30 $22.26 $75.56 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DA $40.76 $21.76 $62.52 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMAN; CABLE SPLICER HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVI $70.16 $24.71 $94.87 $0.00 $0.00 $0.00 $0.00
MARBLE FINISHER $42.06 $19.80 $61.86 $0.00 $0.00 $0.00 $0.00
MECHANICAL FINISHERS OR SPREADER MACHINE; MILLER FORMLESS M-9000 SLOPE PAVER OR SIMILAR; PORTABLE CRUSHING AND SCREENING PLANTS; POWER BLADE SUPPORT $62.57 $32.53 $95.10 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 1 OPERATOR OF HELICOPTER; HYDRAULIC EXCAVATOR, 7 CU. YDS. AND OVER; POWER SHOVELS, OVER 7 CU. YDS. FOOTNOTE $66.96 $32.53 $99.49 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 3 ASPHALT MILLING MACHINE; CABLE BACKHOE; COMBINATION BACKHOE AND LOADER OVER 3/4 CU. YDS.; CONTINUOUS FLIGHT $63.95 $32.53 $96.48 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 5 CAST-IN-PLACE PIPE LAYING MACHINE; COMBINATION SLUSHER AND MOTOR OPERATOR; CONCRETE CONVEYOR OR CONCRETE PU $61.30 $32.53 $93.83 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 6 ARMOR-COATER; BALLAST JACK TAMPER; BOOM- TYPE BACKFILLING MACHINE; ASSISTANT PLANT ENGINEER; BRIDGE AND/OR $59.98 $32.53 $92.51 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 7 BALLAST REGULATOR; BOOM TRUCK OR DUAL-PURPOSE A-FRAME TRUCK, NON-ROTATING - UNDER 15 TONS; CARY LIFT OR SIM $58.84 $32.53 $91.37 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8 BIT SHARPENER; BOILER TENDER; BOX OPERATOR; BRAKEPERSON; COMBINATION MIXER AND COMPRESSOR; COMPRESSOR OPERA $57.70 $32.53 $90.23 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8-A ELEVATOR OPERATOR; SKIDSTEER LOADER-BOBCAT 743 SERIES OR SMALLER, AND SIMILAR; MINI EXCAVATOR UNDER 25 H $55.49 $32.53 $88.02 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: CRANES GROUP 3: CLAMSHELL AND DRAGLINE UP TO AND INCLUDING 1 CU. YD.; CRANES 45 TONS AND U $64.34 $32.53 $96.87 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1 $57.85 $28.56 $86.41 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1 $55.85 $28.56 $84.41 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2 $54.25 $28.56 $82.81 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2 $52.25 $28.56 $80.81 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3 $49.64 $28.56 $78.20 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3 $47.64 $28.56 $76.20 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: LIFTING DEVICES: GROUP 5: DECK ENGINEER FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO $47.47 $31.15 $78.62 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: LIFTING DEVICES: GROUP 6: DECKHAND; FIRE TENDER FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK $42.50 $31.15 $73.65 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 1 $45.66 $31.15 $76.81 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 1 $43.38 $31.15 $74.53 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 1 $52.64 $31.15 $83.79 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 2 $45.41 $31.15 $76.56 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 2 $43.11 $31.15 $74.26 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 2 $50.82 $31.15 $81.97 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 3 $45.12 $31.15 $76.27 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 3 $42.89 $31.15 $74.04 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 3 $49.14 $31.15 $80.29 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1: CRANE: GROUP 4: CHICAGO BOOM; FORKLIFT, 10 TONS AND OVER; HEAVY-DUTY REPAIR PERSON/WELDER GROUP 5 $63.54 $32.53 $96.07 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1: CRANES: GROUP 2: CRANE OVER 45 TONS TO 100 TONS; DERRICK UNDER 100 TONS; SELF-PROPELLED BOOM-TYPE $67.04 $32.53 $99.57 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 3 $60.61 $32.53 $93.14 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 3 $65.56 $32.53 $98.09 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:CRANE: GROUP 5: BOOM CAT FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 $62.24 $32.53 $94.77 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES $58.19 $32.53 $90.72 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES $59.33 $32.53 $91.86 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES $60.47 $32.53 $93.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES $61.80 $32.53 $94.33 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES:.$ 65.53 32.53 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGRO $63.06 $32.53 $95.59 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND $61.70 $32.53 $94.23 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND $65.43 $32.53 $97.96 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND $58.09 $32.53 $90.62 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND $59.23 $32.53 $91.76 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND $60.37 $32.53 $92.90 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND $62.96 $32.53 $95.49 $0.00 $0.00 $0.00 $0.00
OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL $68.59 $32.53 $101.12 $0.00 $0.00 $0.00 $0.00
PAINTER FOOTNOTE: SANDBLAST/SPRAY PAINTING: $1.00 PER HOUR ADDITIONAL. WORK OVER 30 FEET: $1.00 PER HOUR ADDITIONAL $36.57 $22.69 $59.26 $0.00 $0.00 $0.00 $0.00
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMEMT: GROUP 2 GAMECOURT & PLAYGROUND INSTALLER $34.71 $17.62 $52.33 $0.00 $0.00 $0.00 $0.00
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 1 STRIPER: LAYOUT AND APPLICATION OF PAINTED TRAFFIC STRIPES AND MARKING; HOT THERMO $40.83 $17.62 $58.45 $0.00 $0.00 $0.00 $0.00
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 3 PROTECTIVE COATING, PAVEMENT SEALING $35.11 $17.62 $52.73 $0.00 $0.00 $0.00 $0.00
PILEDRIVER $54.10 $34.69 $88.79 $0.00 $0.00 $0.00 $0.00
PLASTERER TENDER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL $39.77 $28.54 $68.31 $0.00 $0.00 $0.00 $0.00
PLUMBER & STEAMFITTER $51.65 $41.59 $93.24 $0.00 $0.00 $0.00 $0.00
ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL $61.30 $32.53 $93.83 $0.00 $0.00 $0.00 $0.00
SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL $65.43 $32.53 $97.96 $0.00 $0.00 $0.00 $0.00
TERRA COBRA, LETOURNEAU PULLS, TOURNOROCKER, EUCLID AND SIMILAR TYPE EQUIPMENT WHEN PULLING FUEL AND/OR GREASE TANK TRAILERS OR OTHER MISCELLANEOUS TR $44.21 $34.28 $78.49 $0.00 $0.00 $0.00 $0.00
TERRAZZO FINISHER $44.93 $20.98 $65.91 $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER/SETTER $60.58 $29.79 $90.37 $0.00 $0.00 $0.00 $0.00
THE CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY: AREA 1: WESTERN PORTION AREA 2: REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER $62.61 $39.55 $102.16 $0.00 $0.00 $0.00 $0.00
THE CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY: AREA 1: WESTERN PORTION AREA 2: REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER $60.61 $39.55 $100.16 $0.00 $0.00 $0.00 $0.00
TILE FINISHER $32.68 $18.32 $51.00 $0.00 $0.00 $0.00 $0.00
TILE LAYER $50.28 $22.05 $72.33 $0.00 $0.00 $0.00 $0.00
TRUCK; BULK CEMENT SPREADER; DUMPCRETE TRUCK; SKID TRUCK; DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YA $44.56 $34.28 $78.84 $0.00 $0.00 $0.00 $0.00
TUNNEL AND SHAFT LABORERS: GROUP 1 DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN $45.89 $27.72 $73.61 $0.00 $0.00 $0.00 $0.00
TUNNEL AND SHAFT LABORERS: GROUP 2 RODMEN; SHAFT WORK & RAISE $45.66 $27.72 $73.38 $0.00 $0.00 $0.00 $0.00
TUNNEL AND SHAFT LABORERS: GROUP 3 BIT GRINDER; BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER IN TUN $45.41 $27.72 $73.13 $0.00 $0.00 $0.00 $0.00
TUNNEL AND SHAFT LABORERS: GROUP 4 VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING $44.96 $27.72 $72.68 $0.00 $0.00 $0.00 $0.00
TUNNEL AND SHAFT LABORERS: GROUP 5 GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN $44.42 $27.72 $72.14 $0.00 $0.00 $0.00 $0.00
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST $46.41 $27.72 $74.13 $0.00 $0.00 $0.00 $0.00
UNDERGROUND UTILITY WORKER / LANDSCAPE FITTER $36.01 $18.50 $54.51 $0.00 $0.00 $0.00 $0.00
UNIT); HIGHBED HEAVY DUTY TRANSPORT; SCISSOR TRUCK; RUBBER-TIRED MUCK CAR; RUBBER-TIRED TRUCK JUMBO; WINCH TRUCK AND ""A"" FRAME DRIVERS; COMBINATION $43.56 $34.28 $77.84 $0.00 $0.00 $0.00 $0.00
WATER TRUCKS, 7,000 GALS. AND OVER; JETTING TRUCKS, 7,000 GALS. AND OVER; VACUUM TRUCKS UNDER 7500 GALS. TRUCKS TOWING TILT BED OR FLAT BED PULL TRAIL $43.86 $34.28 $78.14 $0.00 $0.00 $0.00 $0.00
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL $36.20 $27.30 $63.50 $0.00 $0.00 $0.00 $0.00
View all WDs for Tulare → Revision history →