220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00 PER FOOT SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RAT
|
$59.51 |
$34.69 |
$94.20 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00 PER FOOT SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RAT
|
$64.51 |
$34.69 |
$99.20 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER
|
$35.31 |
$12.75 |
$48.06 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ASBESTOS WORKERS/INSULATOR
|
$64.56 |
$25.07 |
$89.63 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BOILERMAKER
|
$45.60 |
$38.99 |
$84.59 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BORDER WITH SHASTA COUNTY AREA 2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PAR
|
$57.65 |
$39.55 |
$97.20 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BORDER WITH SHASTA COUNTY AREA 2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PAR
|
$55.65 |
$39.55 |
$95.20 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BRICKLAYER; MARBLE SETTER *THE WAGE SCALE FOR PREVAILING WAGE PROJECTS PERFORMED IN BLYTHE, CHINA LAKE, DEATH VALLEY, FORT IRWIN, TWENTY-NINE PALMS, N
|
$45.53 |
$20.29 |
$65.82 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH
|
$53.23 |
$39.55 |
$92.78 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH
|
$56.53 |
$39.55 |
$96.08 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH
|
$51.23 |
$39.55 |
$90.78 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH
|
$54.53 |
$39.55 |
$94.08 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTERS
|
$45.57 |
$30.82 |
$76.39 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER
|
$52.65 |
$30.82 |
$83.47 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTERS: JOURNEYMAN CARPENTER
|
$45.42 |
$30.82 |
$76.24 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTERS: MILLWRIGHT
|
$47.92 |
$32.41 |
$80.33 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CEMENT MASON/CONCRETE FINISHER
|
$32.15 |
$23.27 |
$55.42 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CRANE, OVER 45 TONS UP TO AND INCLUDING 100 TONS; DERRICK BARGE, 100 TONS AND UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, OVER 45 TONS; TOWER CRAN
|
$66.08 |
$32.53 |
$98.61 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DEVICE OVER 100 TONS FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL
|
$68.81 |
$32.53 |
$101.34 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DIVER: ASSISTANT TENDER, ROV TENDER/TECHNICIAN DEPTH PAY: 050 TO 100 FT $2.00 PER FOOT 101 TO 150 FT $3.00 PER FOOT 151 TO 220 FT $4.00 PER FOOT 221 F
|
$54.10 |
$34.69 |
$88.79 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DIVER: DIVER WET DEPTH PAY: 050 TO 100 FT $2.00 PER FOOT 101 TO 150 FT $3.00 PER FOOT 151 TO 220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00 PER FOOT SATUR
|
$103.62 |
$34.69 |
$138.31 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WOR
|
$59.51 |
$34.69 |
$94.20 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WOR
|
$60.51 |
$34.69 |
$95.20 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN
|
$50.00 |
$30.15 |
$80.15 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED. TRUCK DRIVERS: GROUP 1: DUMP TRUCKS, UNDER 6 YDS.; SINGLE UNIT FLAT RACK; NIPPER TRUCK; CONCRETE PUMP TR
|
$43.26 |
$34.28 |
$77.54 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS
|
$35.25 |
$27.30 |
$62.55 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS
|
$28.94 |
$27.30 |
$56.24 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL. LABORERS:, WRECKING: GROUP 1: Skilled wrecker FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS
|
$35.50 |
$27.30 |
$62.80 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER.$ 50.70 35.15 IRONWORKER
|
$45.78 |
$26.51 |
$72.29 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER CLASSIFICATIONS
|
$28.94 |
$27.30 |
$56.24 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER CLASSIFICATIONS
|
$36.05 |
$27.30 |
$63.35 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER: TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON
|
$36.26 |
$27.30 |
$63.56 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER: TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE
|
$36.56 |
$27.30 |
$63.86 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER: TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH
|
$34.06 |
$27.30 |
$61.36 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-A: JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG
|
$35.72 |
$27.30 |
$63.02 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-C: BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WE
|
$35.55 |
$27.30 |
$62.85 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-F: WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE FOOTNOTES: LABORERS WORKING OFF OR W
|
$36.08 |
$27.30 |
$63.38 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1: ASPHALT SPREADER BOXES; BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRA
|
$35.50 |
$27.30 |
$62.80 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER; CONCRETE
|
$35.35 |
$27.30 |
$62.65 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 3: CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WA
|
$35.25 |
$27.30 |
$62.55 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS:, GUNITE: GROUP 1: STRUCTURAL NOZZLEMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HO
|
$36.46 |
$27.30 |
$63.76 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS:, GUNITE: GROUP 3: REBOUNDMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR ADDITIO
|
$35.37 |
$27.30 |
$62.67 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS:, GUNITE: GROUP 4: GUNITE LABORER FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR ADD
|
$35.25 |
$27.30 |
$62.55 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS:, WRECKING: GROUP 2: Semi-skilled wrecker FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER
|
$35.35 |
$27.30 |
$62.65 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: EQUIPMENT SPECIALIST (OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES, OVERHEAD & UNDERGROUND DIS
|
$53.30 |
$22.26 |
$75.56 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: GROUNDMAN HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DA
|
$40.76 |
$21.76 |
$62.52 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: LINEMAN; CABLE SPLICER HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVI
|
$70.16 |
$24.71 |
$94.87 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
MARBLE FINISHER
|
$42.06 |
$19.80 |
$61.86 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
MECHANICAL FINISHERS OR SPREADER MACHINE; MILLER FORMLESS M-9000 SLOPE PAVER OR SIMILAR; PORTABLE CRUSHING AND SCREENING PLANTS; POWER BLADE SUPPORT
|
$62.57 |
$32.53 |
$95.10 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 1 OPERATOR OF HELICOPTER; HYDRAULIC EXCAVATOR, 7 CU. YDS. AND OVER; POWER SHOVELS, OVER 7 CU. YDS. FOOTNOTE
|
$66.96 |
$32.53 |
$99.49 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 3 ASPHALT MILLING MACHINE; CABLE BACKHOE; COMBINATION BACKHOE AND LOADER OVER 3/4 CU. YDS.; CONTINUOUS FLIGHT
|
$63.95 |
$32.53 |
$96.48 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 5 CAST-IN-PLACE PIPE LAYING MACHINE; COMBINATION SLUSHER AND MOTOR OPERATOR; CONCRETE CONVEYOR OR CONCRETE PU
|
$61.30 |
$32.53 |
$93.83 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 6 ARMOR-COATER; BALLAST JACK TAMPER; BOOM- TYPE BACKFILLING MACHINE; ASSISTANT PLANT ENGINEER; BRIDGE AND/OR
|
$59.98 |
$32.53 |
$92.51 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 7 BALLAST REGULATOR; BOOM TRUCK OR DUAL-PURPOSE A-FRAME TRUCK, NON-ROTATING - UNDER 15 TONS; CARY LIFT OR SIM
|
$58.84 |
$32.53 |
$91.37 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8 BIT SHARPENER; BOILER TENDER; BOX OPERATOR; BRAKEPERSON; COMBINATION MIXER AND COMPRESSOR; COMPRESSOR OPERA
|
$57.70 |
$32.53 |
$90.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8-A ELEVATOR OPERATOR; SKIDSTEER LOADER-BOBCAT 743 SERIES OR SMALLER, AND SIMILAR; MINI EXCAVATOR UNDER 25 H
|
$55.49 |
$32.53 |
$88.02 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: CRANES GROUP 3: CLAMSHELL AND DRAGLINE UP TO AND INCLUDING 1 CU. YD.; CRANES 45 TONS AND U
|
$64.34 |
$32.53 |
$96.87 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1
|
$57.85 |
$28.56 |
$86.41 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1
|
$55.85 |
$28.56 |
$84.41 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2
|
$54.25 |
$28.56 |
$82.81 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2
|
$52.25 |
$28.56 |
$80.81 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3
|
$49.64 |
$28.56 |
$78.20 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3
|
$47.64 |
$28.56 |
$76.20 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: LIFTING DEVICES: GROUP 5: DECK ENGINEER FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO
|
$47.47 |
$31.15 |
$78.62 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: LIFTING DEVICES: GROUP 6: DECKHAND; FIRE TENDER FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK
|
$42.50 |
$31.15 |
$73.65 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 1
|
$45.66 |
$31.15 |
$76.81 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 1
|
$43.38 |
$31.15 |
$74.53 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 1
|
$52.64 |
$31.15 |
$83.79 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 2
|
$45.41 |
$31.15 |
$76.56 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 2
|
$43.11 |
$31.15 |
$74.26 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 2
|
$50.82 |
$31.15 |
$81.97 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 3
|
$45.12 |
$31.15 |
$76.27 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 3
|
$42.89 |
$31.15 |
$74.04 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 3
|
$49.14 |
$31.15 |
$80.29 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1: CRANE: GROUP 4: CHICAGO BOOM; FORKLIFT, 10 TONS AND OVER; HEAVY-DUTY REPAIR PERSON/WELDER GROUP 5
|
$63.54 |
$32.53 |
$96.07 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1: CRANES: GROUP 2: CRANE OVER 45 TONS TO 100 TONS; DERRICK UNDER 100 TONS; SELF-PROPELLED BOOM-TYPE
|
$67.04 |
$32.53 |
$99.57 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 3
|
$60.61 |
$32.53 |
$93.14 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 3
|
$65.56 |
$32.53 |
$98.09 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:CRANE: GROUP 5: BOOM CAT FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60
|
$62.24 |
$32.53 |
$94.77 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES
|
$58.19 |
$32.53 |
$90.72 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES
|
$59.33 |
$32.53 |
$91.86 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES
|
$60.47 |
$32.53 |
$93.00 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES
|
$61.80 |
$32.53 |
$94.33 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES:.$ 65.53 32.53 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGRO
|
$63.06 |
$32.53 |
$95.59 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND
|
$58.09 |
$32.53 |
$90.62 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND
|
$59.23 |
$32.53 |
$91.76 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND
|
$60.37 |
$32.53 |
$92.90 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND
|
$61.70 |
$32.53 |
$94.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND
|
$65.43 |
$32.53 |
$97.96 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND
|
$62.96 |
$32.53 |
$95.49 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL
|
$68.59 |
$32.53 |
$101.12 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTER FOOTNOTE: SANDBLAST/SPRAY PAINTING: $1.00 PER HOUR ADDITIONAL. WORK OVER 30 FEET: $1.00 PER HOUR ADDITIONAL
|
$36.57 |
$22.69 |
$59.26 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMEMT: GROUP 2 GAMECOURT & PLAYGROUND INSTALLER
|
$34.71 |
$17.62 |
$52.33 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 1 STRIPER: LAYOUT AND APPLICATION OF PAINTED TRAFFIC STRIPES AND MARKING; HOT THERMO
|
$40.83 |
$17.62 |
$58.45 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 3 PROTECTIVE COATING, PAVEMENT SEALING
|
$35.11 |
$17.62 |
$52.73 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PILEDRIVER
|
$54.10 |
$34.69 |
$88.79 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLASTERER TENDER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL
|
$39.77 |
$28.54 |
$68.31 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLUMBER & STEAMFITTER
|
$51.65 |
$41.59 |
$93.24 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL
|
$61.30 |
$32.53 |
$93.83 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL
|
$65.43 |
$32.53 |
$97.96 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TERRA COBRA, LETOURNEAU PULLS, TOURNOROCKER, EUCLID AND SIMILAR TYPE EQUIPMENT WHEN PULLING FUEL AND/OR GREASE TANK TRAILERS OR OTHER MISCELLANEOUS TR
|
$44.21 |
$34.28 |
$78.49 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TERRAZZO FINISHER
|
$44.93 |
$20.98 |
$65.91 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TERRAZZO WORKER/SETTER
|
$60.58 |
$29.79 |
$90.37 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
THE CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY: AREA 1: WESTERN PORTION AREA 2: REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER
|
$62.61 |
$39.55 |
$102.16 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
THE CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY: AREA 1: WESTERN PORTION AREA 2: REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER
|
$60.61 |
$39.55 |
$100.16 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TILE FINISHER
|
$32.68 |
$18.32 |
$51.00 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TILE LAYER
|
$50.28 |
$22.05 |
$72.33 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK; BULK CEMENT SPREADER; DUMPCRETE TRUCK; SKID TRUCK; DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YA
|
$44.56 |
$34.28 |
$78.84 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TUNNEL AND SHAFT LABORERS: GROUP 1 DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN
|
$45.89 |
$27.72 |
$73.61 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TUNNEL AND SHAFT LABORERS: GROUP 2 RODMEN; SHAFT WORK & RAISE
|
$45.66 |
$27.72 |
$73.38 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TUNNEL AND SHAFT LABORERS: GROUP 3 BIT GRINDER; BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER IN TUN
|
$45.41 |
$27.72 |
$73.13 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TUNNEL AND SHAFT LABORERS: GROUP 4 VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING
|
$44.96 |
$27.72 |
$72.68 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TUNNEL AND SHAFT LABORERS: GROUP 5 GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN
|
$44.42 |
$27.72 |
$72.14 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST
|
$46.41 |
$27.72 |
$74.13 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
UNDERGROUND UTILITY WORKER / LANDSCAPE FITTER
|
$36.01 |
$18.50 |
$54.51 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
UNIT); HIGHBED HEAVY DUTY TRANSPORT; SCISSOR TRUCK; RUBBER-TIRED MUCK CAR; RUBBER-TIRED TRUCK JUMBO; WINCH TRUCK AND ""A"" FRAME DRIVERS; COMBINATION
|
$43.56 |
$34.28 |
$77.84 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
WATER TRUCKS, 7,000 GALS. AND OVER; JETTING TRUCKS, 7,000 GALS. AND OVER; VACUUM TRUCKS UNDER 7500 GALS. TRUCKS TOWING TILT BED OR FLAT BED PULL TRAIL
|
$43.86 |
$34.28 |
$78.14 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL
|
$36.20 |
$27.30 |
$63.50 |
$0.00 |
$0.00 |
$0.00 |