Wage Determination CA20260004-16333-hvy

Del Norte, CA · heavy · Rev. 3 · Effective May 20, 2026

Revision history →
Quick Answer

Wage determination CA20260004-16333-hvy covers 135 trade classifications for heavy construction in Del Norte, CA. Total packages (base + fringe) range from $16.29/hr to $140.40/hr, with the highest going to PLUMBER: ALL OTHER WORK - NEW CONSTRUCTION RATE. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: CA20260004-16333-hvy
Revision: 3
Type: heavy
County: Del Norte
State: CA
Effective: May 20, 2026
Trades covered: 135
Highest rate: $140.40/hr
Official source: SAM.gov reference CA20260004View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
100 tons; Self- propelled boom-type lifting device over 100 tons. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour a $43.72 $31.15 $74.87 $0.00 $0.00 $0.00 $0.00
220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00 PER FOOT SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RAT $59.51 $34.69 $94.20 $0.00 $0.00 $0.00 $0.00
220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00 PER FOOT SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RAT $64.51 $34.69 $99.20 $0.00 $0.00 $0.00 $0.00
APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF INCEPTION. FOOTNOTES: LABORERS WORKING OF $36.05 $27.30 $63.35 $0.00 $0.00 $0.00 $0.00
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER $35.31 $12.75 $48.06 $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANI $64.56 $25.07 $89.63 $0.00 $0.00 $0.00 $0.00
BRICKLAYER SPECIALTY PAY: UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH BASINS, SEWER PIPES AND TELEPHONE CONDUIT SHALL BE PAID $1 $57.02 $28.50 $85.52 $0.00 $0.00 $0.00 $0.00
BULK CEMENT SPREADER; DUMPCRETE TRUCK; SKID TRUCK; DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE R $44.56 $34.28 $78.84 $0.00 $0.00 $0.00 $0.00
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER DEL NORTE, HUMBOLDT, LAKE AND MENDOCINO COUNTIES $54.85 $31.49 $86.34 $0.00 $0.00 $0.00 $0.00
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER DEL NORTE, HUMBOLDT, LAKE AND MENDOCI $47.77 $31.49 $79.26 $0.00 $0.00 $0.00 $0.00
CARPENTERS: JOURNEYMAN CARPENTER DEL NORTE, HUMBOLDT, LAKE AND MENDOCINO COUNTIES $47.62 $31.49 $79.11 $0.00 $0.00 $0.00 $0.00
CARPENTERS: MILLWRIGHT $50.12 $33.08 $83.20 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $32.15 $23.27 $55.42 $0.00 $0.00 $0.00 $0.00
DEL NORTE Area 1: Extreme Southwest Area 2: HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOCINO Area 1: C $58.09 $32.53 $90.62 $0.00 $0.00 $0.00 $0.00
DEL NORTE Area 1: Extreme Southwest Area 2: HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOCINO Area 1: C $60.37 $32.53 $92.90 $0.00 $0.00 $0.00 $0.00
DEL NORTE Area 1: Extreme Southwest Area 2: HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOCINO Area 1: C $61.70 $32.53 $94.23 $0.00 $0.00 $0.00 $0.00
DEL NORTE Area 1: Extreme Southwest Area 2: HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOCINO Area 1: C $65.43 $32.53 $97.96 $0.00 $0.00 $0.00 $0.00
DEL NORTE Area 1: Extreme Southwest Area 2: HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOCINO Area 1: C $58.19 $32.53 $90.72 $0.00 $0.00 $0.00 $0.00
DEL NORTE Area 1: Extreme Southwest Area 2: HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOCINO Area 1: C $59.33 $32.53 $91.86 $0.00 $0.00 $0.00 $0.00
DEL NORTE Area 1: Extreme Southwest Area 2: HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOCINO Area 1: C $60.47 $32.53 $93.00 $0.00 $0.00 $0.00 $0.00
DEL NORTE Area 1: Extreme Southwest Area 2: HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOCINO Area 1: C $64.34 $32.53 $96.87 $0.00 $0.00 $0.00 $0.00
DEL NORTE Area 1: Extreme Southwest Area 2: HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOCINO Area 1: C $44.83 $31.15 $75.98 $0.00 $0.00 $0.00 $0.00
DEL NORTE Area 1: Extreme Southwest Area 2: HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOCINO Area 1: C $45.07 $31.15 $76.22 $0.00 $0.00 $0.00 $0.00
DEL NORTE Area 1: Extreme Southwest Area 2: HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOCINO Area 1: C $68.59 $32.53 $101.12 $0.00 $0.00 $0.00 $0.00
DEL NORTE Area 1: Extreme Southwest Area 2: HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOCINO Area 1: C $43.79 $31.15 $74.94 $0.00 $0.00 $0.00 $0.00
DEL NORTE Area 1: Extreme Southwest Area 2: HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOCINO Area 1: C $46.08 $31.15 $77.23 $0.00 $0.00 $0.00 $0.00
DEL NORTE Area 1: Extreme Southwest Area 2: HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOCINO Area 1: C $59.98 $32.53 $92.51 $0.00 $0.00 $0.00 $0.00
DEL NORTE Area 1: Extreme Southwest Area 2: HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOCINO Area 1: C $62.57 $32.53 $95.10 $0.00 $0.00 $0.00 $0.00
DEL NORTE Area 1: Extreme Southwest Area 2: HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOCINO Area 1: C $66.96 $32.53 $99.49 $0.00 $0.00 $0.00 $0.00
DEL NORTE Area 1: Extreme Southwestern Area 2: Remainder HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOC $49.64 $28.56 $78.20 $0.00 $0.00 $0.00 $0.00
DEL NORTE Area 1: Extreme Southwestern Area 2: Remainder HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOC $47.64 $28.56 $76.20 $0.00 $0.00 $0.00 $0.00
DEL NORTE Area 1: Extreme Southwestern Area 2: Remainder HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOC $54.25 $28.56 $82.81 $0.00 $0.00 $0.00 $0.00
DEL NORTE Area 1: Extreme Southwestern Area 2: Remainder HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOC $52.25 $28.56 $80.81 $0.00 $0.00 $0.00 $0.00
DEL NORTE Area 1: Extreme Southwestern Area 2: Remainder HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOC $57.85 $28.56 $86.41 $0.00 $0.00 $0.00 $0.00
DEL NORTE Area 1: Extreme Southwestern Area 2: Remainder HUMBOLDT Area 1: Except Eastern and Southwestern Area 2: LAKE Area 1: Southern Area 2: MENDOC $55.85 $28.56 $84.41 $0.00 $0.00 $0.00 $0.00
DIVER: ASSISTANT TENDER, ROV TENDER/TECHNICIAN DEPTH PAY: 050 TO 100 FT $2.00 PER FOOT 101 TO 150 FT $3.00 PER FOOT 151 TO 220 FT $4.00 PER FOOT 221 F $54.10 $34.69 $88.79 $0.00 $0.00 $0.00 $0.00
DIVER: DIVER WET DEPTH PAY: 050 TO 100 FT $2.00 PER FOOT 101 TO 150 FT $3.00 PER FOOT 151 TO 220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00 PER FOOT SATUR $103.62 $34.69 $138.31 $0.00 $0.00 $0.00 $0.00
DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WOR $59.51 $34.69 $94.20 $0.00 $0.00 $0.00 $0.00
DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WOR $60.51 $34.69 $95.20 $0.00 $0.00 $0.00 $0.00
Derrick under 100 tons; Self-propelled boom-type lifting device over 45 tons to 100 tons; Tower crane. FOOTNOTE: Work suspended by ropes or cables, or $43.45 $31.15 $74.60 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LAKE AND MENDOCINO COUNTIES TUNNEL WORK: ADD $0.50 PER HOUR $59.17 $32.04 $91.21 $0.00 $0.00 $0.00 $0.00
ELECTRICIANS DEL NORTE AND HUMBOLDT COUNTIES TUNNEL WORK: ADD $0.50 PER HOUR $59.17 $32.04 $91.21 $0.00 $0.00 $0.00 $0.00
IRONWORKERS: FENCE ERECTOR DEL NORTE COUNTY PREMIUM PAY: $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolat $45.78 $26.51 $72.29 $0.00 $0.00 $0.00 $0.00
IRONWORKERS: FENCE ERECTOR. PREMIUM PAY: $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Nava $45.78 $26.51 $72.29 $0.00 $0.00 $0.00 $0.00
IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL PREMIUM PAY: $6.00 additional per hour at the following locations: China Lake Naval Test Station $43.75 $34.45 $78.20 $0.00 $0.00 $0.00 $0.00
IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL. PREMIUM PAY: $6.00 additional per hour at the following locations: China Lake Naval Test Station $50.70 $35.15 $85.85 $0.00 $0.00 $0.00 $0.00
LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 1- ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO AND SANTA CLARA COUNTIES ASBESTOS REMOVAL-SCOPE OF WORK $39.15 $30.03 $69.18 $0.00 $0.00 $0.00 $0.00
LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 2- CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA,MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, STANISLAUS, AND TUO $38.15 $30.03 $68.18 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER-BRICK FOOTNOTE: REFRACTORY WORK WHERE HEAT-PROTECTIVE CLOTHING IS REQUIRED: $2.00 PER HOUR ADDITIONAL $36.84 $26.24 $63.08 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER-BRICK MARIN COUNTY FOOTNOTE: REFRACTORY WORK WHERE HEAT-PROTECTIVE CLOTHING IS REQUIRED: $2.00 PER HOUR ADDITIONAL $37.54 $25.55 $63.09 $0.00 $0.00 $0.00 $0.00
LABORER: TRAFFIC CONTROL PERSON I: LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE. DEL NORTE, HUMBOLDT, LAKE, AND M $36.26 $27.30 $63.56 $0.00 $0.00 $0.00 $0.00
LABORER: TRAFFIC CONTROL PERSON II: INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH CUSHIONS. DEL NORTE, HUMBOLD $34.06 $27.30 $61.36 $0.00 $0.00 $0.00 $0.00
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-A: JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG $35.72 $27.30 $63.02 $0.00 $0.00 $0.00 $0.00
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-C: BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WE $35.55 $27.30 $62.85 $0.00 $0.00 $0.00 $0.00
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-F: WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE FOOTNOTES: LABORERS WORKING OFF OR W $36.08 $27.30 $63.38 $0.00 $0.00 $0.00 $0.00
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1: ASPHALT SPREADER BOXES; BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRA $35.50 $27.30 $62.80 $0.00 $0.00 $0.00 $0.00
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER; CONCRETE $35.35 $27.30 $62.65 $0.00 $0.00 $0.00 $0.00
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 3: CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WA $35.25 $27.30 $62.55 $0.00 $0.00 $0.00 $0.00
LABORERS:, GUNITE: GROUP 1: STRUCTURAL NOZZLEMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HO $36.46 $27.30 $63.76 $0.00 $0.00 $0.00 $0.00
LABORERS:, GUNITE: GROUP 3: REBOUNDMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR ADDITIO $35.37 $27.30 $62.67 $0.00 $0.00 $0.00 $0.00
LABORERS:, GUNITE: GROUP 4: GUNITE LABORER FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR ADD $35.25 $27.30 $62.55 $0.00 $0.00 $0.00 $0.00
LABORERS:, WRECKING: GROUP 1: Skilled wrecker FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR $35.50 $27.30 $62.80 $0.00 $0.00 $0.00 $0.00
LABORERS:, WRECKING: GROUP 2: Semi-skilled wrecker FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER $35.35 $27.30 $62.65 $0.00 $0.00 $0.00 $0.00
LANDSCAPE LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BEL $35.25 $27.30 $62.55 $0.00 $0.00 $0.00 $0.00
LANDSCAPE LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BEL $28.94 $27.30 $56.24 $0.00 $0.00 $0.00 $0.00
LANDSCAPE/IRRIGATION FITTER: UNDERGROUND/UTLIITY FITTER LAKE AND MENDOCINO COUNTIES $77.35 $36.53 $113.88 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: EQUIPMENT SPECIALIST (OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES, OVERHEAD & UNDERGROUND DIS $53.30 $22.26 $75.56 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN HUMBOLDT, LAKE AND MENDOCINO COUNTIES HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY $40.76 $21.76 $62.52 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMAN; CABLE SPLICER HUMBOLDT, LAKE AND MENDOCINO COUNTIES HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DA $70.16 $24.71 $94.87 $0.00 $0.00 $0.00 $0.00
MARBLE FINISHER $42.06 $19.80 $61.86 $0.00 $0.00 $0.00 $0.00
MARBLE MASON $61.72 $30.31 $92.03 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 5: Cast-in-place pipe laying machine; Combination slusher and motor operator; Concrete conveyor or concrete p $61.30 $32.53 $93.83 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 7: Ballast regulator; Boom truck or dual-purpose A-frame truck, non-rotating - under 15 tons; Cary lift or si $58.84 $32.53 $91.37 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8-A: Elevator operator; Skidsteer loader-Bobcat 743 series or smaller, and similar; Mini excavator under 25 H $55.49 $32.53 $88.02 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8: Bit sharpener; Boiler tender; Box operator; Brakeperson; Combination mixer and compressor; Compressor oper $57.70 $32.53 $90.23 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, AREA 1:GROUP 3: Asphalt milling machine; Cable backhoe; Combination backhoe and loader over 3/4 cu. yds.; Continuous flight $63.95 $32.53 $96.48 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS, CRANES - AREA 1: GROUP 2: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Cra $66.08 $32.53 $98.61 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS, CRANES - AREA 1: GROUP 4: Boom Truck or dual purpose A-frame truck, non-rotating over 15 tons; Truc $61.30 $32.53 $93.83 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS, HYDRAULIC - AREA 1: GROUP 3: Clamshell and dragline up to and including 1 cu. yd.; Cranes 45 tons a $44.44 $31.15 $75.59 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS, OILER - AREA 1: GROUP 2: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Cran $42.83 $31.15 $73.98 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS, OILER - AREA 1: GROUP 3: Clamshell and dragline up to and including 1 cu. yd.; Cranes 45 tons and u $42.55 $31.15 $73.70 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, PILEDRIVING, Lifting Devices - AREA 1: GROUP 1: Derrick barge pedestal mounted over 100 tons; Clamshell over 7 cu. yds.; Se $52.64 $31.15 $83.79 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, PILEDRIVING, Lifting Devices - AREA 1: GROUP 2: Derrick barge pedestal mounted 45 tons to and including 100 tons; Clamshell $50.82 $31.15 $81.97 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, PILEDRIVING, Lifting Devices - AREA 1: GROUP 3: Derrick barge pedestal mounted under 45 tons; Self- propelled boom-type lif $49.14 $31.15 $80.29 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, PILEDRIVING, Lifting Devices - AREA 1: GROUP 4: Assistant operator in lieu of assistant to engineer; Forklift, 10 tons and $47.37 $31.15 $78.52 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, PILEDRIVING, Lifting Devices - AREA 1: GROUP 6: DECKHAND; FIRE TENDER FOOTNOTE: Work suspended by ropes or cables, or work $42.50 $31.15 $73.65 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, PILEDRIVING, Lifting Devices - AREA : GROUP 5: DECK ENGINEER FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Y $44.73 $31.15 $75.88 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, PILEDRIVING, Truck Crane OIler - AREA 1: GROUP 1: Derrick barge pedestal mounted over 100 tons; Clamshell over 7 cu. yds $45.66 $31.15 $76.81 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, PILEDRIVING, Truck Crane Oiler - AREA 1: GROUP 2: Derrick barge pedestal mounted 45 tons to and including 100 tons; Clamshe $45.41 $31.15 $76.56 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, PILEDRIVING, Truck Crane Oiler - AREA 1: GROUP 3: Derrick barge pedestal mounted under 45 tons; Self- propelled boom-type l $45.12 $31.15 $76.27 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, STEEL ERECTION, CRANES - AREA 1: GROUP 1: Crane over 100 tons; Derrick over 100 tons; Self- propelled boom-type lifting dev $68.81 $32.53 $101.34 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, STEEL ERECTION, CRANES - AREA 1: GROUP 2: Crane over 45 tons to 100 tons; Derrick under 100 tons; Self-propelled boom-type $67.04 $32.53 $99.57 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, STEEL ERECTION, CRANES - AREA 1: GROUP 4: Chicago boom; Forklift, 10 tons and over; Heavy-duty repair person/welder. FOOTNO $63.54 $32.53 $96.07 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, STEEL ERECTION, CRANES - AREA 1: GROUP 5: Boom cat. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $ $62.24 $32.53 $94.77 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, STEEL ERECTION, Cranes - AREA 1: GROUP 3: Crane, 45 tons and under; Self-propelled boom-type lifting device, 45 tons and un $65.56 $32.53 $98.09 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, STEEL ERECTION, Hydraulic - AREA 1: GROUP 3: Crane, 45 tons and under; Self-propelled boom-type lifting device, 45 tons and $60.61 $32.53 $93.14 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, STEEL ERECTION, TRUCK CRANE OILER - AREA 1: GROUP 1: Crane over 100 tons; Derrick over 100 tons; Self- propelled boom-type $45.95 $31.15 $77.10 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, STEEL ERECTION, TRUCK CRANE OILER - AREA 1: GROUP 2: Crane over 45 tons to 100 tons; Derrick under 100 tons; Self-propelled $45.73 $31.15 $76.88 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, STEEL ERECTION, TRUCK CRANE OILER - AREA 1: GROUP 3: Crane, 45 tons and under; Self-propelled boom-type lifting device, 45 $45.46 $31.15 $76.61 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1: SHAFTS, STOPES, RAISES: GROUP 1-A: Tunnel bore machine operator, 20' diameter or more $65.53 $32.53 $98.06 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1: SHAFTS, STOPES, RAISES: GROUP 1: Heading shield operator; Heavy-duty repairperson; Mu $63.06 $32.53 $95.59 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1: SHAFTS, STOPES, RAISES: GROUP 2: Combination slusher and motor operator; Concrete pum $61.80 $32.53 $94.33 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1: UNDERGROUND: GROUP 1: Heading shield operator; Heavy-duty repairperson; Mucking machi $62.96 $32.53 $95.49 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1: UNDERGROUND: GROUP 4: Combination slurry mixer cleaner; Grouting Machine operator; Mo $59.23 $32.53 $91.76 $0.00 $0.00 $0.00 $0.00
PAINTERS $53.38 $28.04 $81.42 $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH & ROLLER $13.35 $2.94 $16.29 $0.00 $0.00 $0.00 $0.00
PAINTERS: SANDBLASTER, SPRAY, STRUCTURAL STEEL & SWING STAGE $13.60 $2.94 $16.54 $0.00 $0.00 $0.00 $0.00
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMEMT: GROUP 2 GAMECOURT & PLAYGROUND INSTALLER $34.71 $17.62 $52.33 $0.00 $0.00 $0.00 $0.00
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 1 STRIPER: LAYOUT AND APPLICATION OF PAINTED TRAFFIC STRIPES AND MARKING; HOT THERMO $40.83 $17.62 $58.45 $0.00 $0.00 $0.00 $0.00
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 3 PROTECTIVE COATING, PAVEMENT SEALING $35.11 $17.62 $52.73 $0.00 $0.00 $0.00 $0.00
PILEDRIVER $54.10 $34.69 $88.79 $0.00 $0.00 $0.00 $0.00
PLUMBER: ALL OTHER WORK - NEW CONSTRUCTION RATE $91.00 $49.40 $140.40 $0.00 $0.00 $0.00 $0.00
PLUMBER: Work on wooden frame structures 5 stories or less excluding high-rise buildings and commercial work such as hospitals, prisons, hotels, schoo $69.70 $46.38 $116.08 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $55.92 $45.29 $101.21 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $64.06 $46.83 $110.89 $0.00 $0.00 $0.00 $0.00
Self-propelled boom-type lifting device, 45 tons and under. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additio $43.23 $31.15 $74.38 $0.00 $0.00 $0.00 $0.00
TERRA COBRA, LETOURNEAU PULLS, TOURNOROCKER, EUCLID AND SIMILAR TYPE EQUIPMENT WHEN PULLING FUEL AND/OR GREASE TANK TRAILERS OR OTHER MISCELLANEOUS TR $44.21 $34.28 $78.49 $0.00 $0.00 $0.00 $0.00
TERRAZZO FINISHER $44.93 $20.98 $65.91 $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER/SETTER $60.58 $29.79 $90.37 $0.00 $0.00 $0.00 $0.00
TILE FINISHER DEL NORTE & HUMBOLDT COUNTIES $37.75 $19.28 $57.03 $0.00 $0.00 $0.00 $0.00
TILE FINISHER LAKE & MENDOCINO COUNTIES $35.78 $19.23 $55.01 $0.00 $0.00 $0.00 $0.00
TILE LAYER DEL NORTE & HUMBOLDT COUNTIES $59.92 $22.62 $82.54 $0.00 $0.00 $0.00 $0.00
TILE LAYER LAKE & MENDOCINO COUNTIES $56.79 $22.54 $79.33 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 1: DUMP TRUCKS, UNDER 6 YDS.; SINGLE UNIT FLAT RACK; NIPPER TRUCK; CONCRETE PUMP TRUCK; CONCRETE PUMP MACHINE; FORK LIFT AND LIFT $43.26 $34.28 $77.54 $0.00 $0.00 $0.00 $0.00
TUNNEL AND SHAFT LABORERS: GROUP 2- RODMEN; SHAFT WORK & RAISE $45.66 $27.72 $73.38 $0.00 $0.00 $0.00 $0.00
TUNNEL AND SHAFT LABORERS: GROUP 3- BIT GRINDER; BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER IN TU $45.41 $27.72 $73.13 $0.00 $0.00 $0.00 $0.00
TUNNEL AND SHAFT LABORERS: GROUP 4- VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING $44.96 $27.72 $72.68 $0.00 $0.00 $0.00 $0.00
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST.$ 46.41 27.72 TUNNEL AND SHAFT LABORERS: GROUP 5- GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN $44.42 $27.72 $72.14 $0.00 $0.00 $0.00 $0.00
UNDERGROUND UTILITY WORKER: LANDSCAPE FITTER $36.01 $18.50 $54.51 $0.00 $0.00 $0.00 $0.00
UNIT); HIGHBED HEAVY DUTY TRANSPORT; SCISSOR TRUCK; RUBBER-TIRED MUCK CAR; RUBBER-TIRED TRUCK JUMBO; WINCH TRUCK AND ""A"" FRAME DRIVERS; COMBINATION $43.56 $34.28 $77.84 $0.00 $0.00 $0.00 $0.00
WATER TRUCKS, 7,000 GALS. AND OVER; JETTING TRUCKS, 7,000 GALS. AND OVER; VACUUM TRUCKS UNDER 7500 GALS. TRUCKS TOWING TILT BED OR FLAT BED PULL TRAIL $43.86 $34.28 $78.14 $0.00 $0.00 $0.00 $0.00
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL $36.20 $27.30 $63.50 $0.00 $0.00 $0.00 $0.00
over 100 tons; Clamshell over 7 cu. yds.; Self-propelled boom-type lifting device over 100 tons; Truck crane or crawler, land or barge mounted over 10 $43.38 $31.15 $74.53 $0.00 $0.00 $0.00 $0.00
tons to and including 100 tons; Clamshell up to and including 7 cu. yds.; Self-propelled boom-type lifting device over 45 tons; Truck crane or crawler $43.11 $31.15 $74.26 $0.00 $0.00 $0.00 $0.00
under 45 tons; Self- propelled boom-type lifting device 45 tons and under; Skid/scow piledriver, any tonnage; Truck crane or crawler, land or barge mo $42.89 $31.15 $74.04 $0.00 $0.00 $0.00 $0.00
View all WDs for Del Norte → Revision history →