POWER EQUIPMENT OPERATOR Group 2 Lattice under 150 ton, 100 ton up to 250 ton hydro cranes — Prevailing Wage Rates

Davis-Bacon prevailing wages for POWER EQUIPMENT OPERATOR Group 2 Lattice under 150 ton, 100 ton up to 250 ton hydro craness across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 35 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATOR Group 2 Lattice under 150 ton, 100 ton up to 250 ton hydro cranes is $54.86/hr, with the middle 80% of counties paying between $54.86 and $54.86/hr. The highest state average is Florida at $54.86/hr; the lowest is Florida at $54.86/hr.

Bottom 10%
$54.86
Median
$54.86
Average
$54.86
Top 10%
$54.86

Range: $54.86 – $54.86/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073Operating Engineers and Other Construction Equipment Operators.

Davis-Bacon median
$54.86/hr
National median total package (base + fringe)
BLS OEWS market median
$28.23/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+94.3%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Florida FL
Avg base: $38.01/hr
Avg total: $54.86/hr
35 rates

All Rates

35 county-level rates for POWER EQUIPMENT OPERATOR Group 2 Lattice under 150 ton, 100 ton up to 250 ton hydro cranes, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Alachua FL residential $38.01 $16.85 $54.86 WD →
Citrus FL building $38.01 $16.85 $54.86 WD →
De Soto FL building $38.01 $16.85 $54.86 WD →
Dixie FL building $38.01 $16.85 $54.86 WD →
Gilchrist FL residential $38.01 $16.85 $54.86 WD →
Gilchrist FL building $38.01 $16.85 $54.86 WD →
Hardee FL building $38.01 $16.85 $54.86 WD →
Hernando FL residential $38.01 $16.85 $54.86 WD →
Hernando FL building $38.01 $16.85 $54.86 WD →
Hernando FL heavy $38.01 $16.85 $54.86 WD →
Hillsborough FL residential $38.01 $16.85 $54.86 WD →
Hillsborough FL building $38.01 $16.85 $54.86 WD →
Hillsborough FL heavy $38.01 $16.85 $54.86 WD →
Lake FL residential $38.01 $16.85 $54.86 WD →
Lake FL building $38.01 $16.85 $54.86 WD →
Levy FL building $38.01 $16.85 $54.86 WD →
Manatee FL residential $38.01 $16.85 $54.86 WD →
Manatee FL building $38.01 $16.85 $54.86 WD →
Manatee FL heavy $38.01 $16.85 $54.86 WD →
Marion FL building $38.01 $16.85 $54.86 WD →
Marion FL residential $38.01 $16.85 $54.86 WD →
Osceola FL building $38.01 $16.85 $54.86 WD →
Osceola FL residential $38.01 $16.85 $54.86 WD →
Pasco FL residential $38.01 $16.85 $54.86 WD →
Pasco FL building $38.01 $16.85 $54.86 WD →
Pasco FL heavy $38.01 $16.85 $54.86 WD →
Pinellas FL residential $38.01 $16.85 $54.86 WD →
Pinellas FL building $38.01 $16.85 $54.86 WD →
Pinellas FL heavy $38.01 $16.85 $54.86 WD →
Polk FL building $38.01 $16.85 $54.86 WD →
Polk FL residential $38.01 $16.85 $54.86 WD →
Sarasota FL building $38.01 $16.85 $54.86 WD →
Sarasota FL heavy $38.01 $16.85 $54.86 WD →
Sarasota FL residential $38.01 $16.85 $54.86 WD →
Sumter FL building $38.01 $16.85 $54.86 WD →
Top-paying counties for POWER EQUIPMENT OPERATOR Group 2 Lattice under 150 ton, 100 ton up to 250 ton hydro cranes →