Wage Determination FL20260213-16487-bld

Marion, FL · building · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination FL20260213-16487-bld covers 26 trade classifications for building construction in Marion, FL. Total packages (base + fringe) range from $13.99/hr to $89.55/hr, with the highest going to PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; EMPLOYER CONTRIBUTIONS 6% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPL. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: FL20260213-16487-bld
Revision: 1
Type: building
County: Marion
State: FL
Effective: May 17, 2026
Trades covered: 26
Highest rate: $89.55/hr
Official source: SAM.gov reference FL20260213View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $28.00 $12.30 $40.30 $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES FORM WORK $15.32 $0.00 $15.32 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $14.47 $1.74 $16.21 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $17.35 $1.98 $19.33 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $22.81 $11.58 $34.39 $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $29.50 $12.98 $42.48 $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $28.90 $15.66 $44.56 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, INCLUDING CEMENT MASON TENDING AND PIPELAYING $12.59 $1.40 $13.99 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $14.44 $1.40 $15.84 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $15.40 $1.90 $17.30 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $18.97 $0.00 $18.97 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $14.83 $1.84 $16.67 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $14.43 $4.78 $19.21 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $15.62 $2.05 $17.67 $0.00 $0.00 $0.00 $0.00
PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; EMPLOYER CONTRIBUTIONS 6% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPL $51.11 $38.44 $89.55 $0.00 $0.00 $0.00 $0.00
PIPEFITTER $37.50 $17.59 $55.09 $0.00 $0.00 $0.00 $0.00
PLUMBER $37.50 $17.59 $55.09 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1 150 TON LATTICE, 250 TON HYDRO, FRICTION, TOWER AND LUFFING CRANES, 300+ FT BOOM JOURNEYMAN OILER SHALL BE PAID: 90% $39.01 $16.85 $55.86 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 2 LATTICE UNDER 150 TON, 100 TON UP TO 250 TON HYDRO CRANES $38.01 $16.85 $54.86 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 3 CRANES NOT DESCRIBED ABOVE; MECHANICS JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE $37.01 $16.85 $53.86 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 FORKLIFT JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE $35.01 $16.85 $51.86 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 20.09 0.30 ROOFER $16.99 $0.00 $16.99 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $18.51 $6.01 $24.52 $0.00 $0.00 $0.00 $0.00
TILE SETTER $18.01 $0.00 $18.01 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $13.22 $2.12 $15.34 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $14.24 $0.00 $14.24 $0.00 $0.00 $0.00 $0.00
View all WDs for Marion → Revision history →