Wage Determination FL20260229-16488-bld
Sumter, FL · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination FL20260229-16488-bld covers 27 trade classifications for building construction in Sumter, FL. Total packages (base + fringe) range from $13.27/hr to $90.27/hr, with the highest going to PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; EMPLOYER CONTRIBUTIONS 6% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPL. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: FL20260229-16488-bld
Revision: 1
Type: building
County: Sumter
State: FL
Effective: May 17, 2026
Trades covered: 27
Highest rate: $90.27/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $30.12 | $13.11 | $43.23 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $14.97 | $0.00 | $14.97 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $14.82 | $0.00 | $14.82 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $33.11 | $14.59 | $47.70 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING | $22.81 | $11.58 | $34.39 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $21.87 | $0.00 | $21.87 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL | $28.90 | $15.66 | $44.56 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL, INCLUDING CEMENT MASON TENDING | $11.80 | $1.47 | $13.27 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $15.00 | $0.54 | $15.54 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $17.80 | $2.81 | $20.61 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $15.40 | $1.90 | $17.30 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $18.97 | $0.00 | $18.97 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $16.30 | $0.00 | $16.30 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $14.43 | $4.78 | $19.21 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $13.54 | $0.00 | $13.54 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; EMPLOYER CONTRIBUTIONS 6% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPL | $51.83 | $38.44 | $90.27 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $22.89 | $9.93 | $32.82 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $19.65 | $5.14 | $24.79 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 1 150 TON LATTICE, 250 TON HYDRO, FRICTION, TOWER AND LUFFING CRANES, 300+ FT BOOM JOURNEYMAN OILER SHALL BE PAID: 90% | $39.01 | $16.85 | $55.86 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 2 LATTICE UNDER 150 TON, 100 TON UP TO 250 TON HYDRO CRANES | $38.01 | $16.85 | $54.86 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 3 CRANES NOT DESCRIBED ABOVE; MECHANICS JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE | $37.01 | $16.85 | $53.86 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 4 FORKLIFT JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE | $35.01 | $16.85 | $51.86 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 16.50 3.52 ROOFER | $16.79 | $0.00 | $16.79 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $35.03 | $24.00 | $59.03 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $17.25 | $1.74 | $18.99 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $12.95 | $2.28 | $15.23 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: LOWBOY TRUCK | $14.24 | $0.00 | $14.24 | $0.00 | $0.00 | $0.00 | $0.00 |